Filtration monitoring systems
US-2017173505-A1 · Jun 22, 2017 · US
US12090532B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-12090532-B2 |
| Application number | US-202016927488-A |
| Country | US |
| Kind code | B2 |
| Filing date | Jul 13, 2020 |
| Priority date | Jul 13, 2020 |
| Publication date | Sep 17, 2024 |
| Grant date | Sep 17, 2024 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
Systems and methods for controlling extraction of landfill gas from a landfill via a gas extraction system are provided herein. According to some aspects of the technology, there is provided site-level control methods for globally controlling one or more wells based on one or more characteristics of aggregate landfill gas collected from a plurality of wells at a gas output. According to some aspects of the technology, there is provided well-level control methods for locally controlling a first well based on or more characteristics of landfill gas collected from the first well. According to further aspects of the technology, there is provided hybrid control methods for making adjustments to a respective well based on both site-level and well-level control methods.
Opening claim text (preview).
The invention claimed is: 1. A method for controlling extraction of landfill gas from a landfill via a gas extraction system, the gas extraction system comprising well piping for coupling a plurality of wells to a gas output, the method comprising: performing, using a multi-well controller, a global control method comprising: obtaining, at the gas output, a measure of a concentration of nitrogen in landfill gas collected from at least some of the plurality of wells, the at least some of the plurality of wells including a first well; determining, for one or more wells of the at least some of the plurality of wells, using the measure of concentration of nitrogen in the landfill gas collected from the at least some of the plurality of wells and a first measure of concentration of at least one constituent gas in landfill gas collected from the first well, whether to adjust respective flow rates of landfill gas being extracted from the one or more wells, the one or more wells including the first well; and when it is determined to adjust the flow rate of landfill gas being extracted from the first well, adjusting the flow rate of the first well; and performing, using at least one first single well controller, a local control method comprising: obtaining, at the first well, a second measure of a concentration of at least one second constituent gas in landfill gas collected from the first well; determining, using the second measure of the concentration of the at least one second constituent gas in the landfill gas collected from the first well, whether to adjust the flow rate of the first well; and when it is determined to adjust the flow rate of the first well, adjusting the flow rate of the first well. 2. The method of claim 1 , wherein the local control method is performed at least once per hour and the global control method is performed no more than once per day. 3. The method of claim 1 , wherein the local control method is performed more frequently than the global control method. 4. The method of claim 1 , further comprising performing, using a second single well controller, a second local control method comprising: obtaining, at a second well of the plurality of wells, a third measure of a concentration of the at least one second constituent gas in landfill gas collected from the second well; determining, using the third measure of the concentration of the at least one second constituent gas in the landfill gas collected from the second well, whether to adjust the flow rate of the second well; and when it is determined to adjust the flow rate of the second well, adjusting the flow rate of the second well. 5. The method of claim 1 , wherein the second measure of concentration of the at least one second constituent gas in landfill gas collected from the first well comprises at least one of methane concentration, oxygen concentration, or balance gas concentration. 6. The method of claim 1 , wherein determining whether to adjust respective flow rates of landfill gas being extracted from the one or more wells comprises: determining whether the measure of concentration of nitrogen of the landfill gas collected from the one or more wells is outside of a global range; when it is determined that the measure of concentration of nitrogen of the landfill gas collected from the one or more wells is outside of the global range, determining whether the first measure of concentration of the at least one constituent gas in landfill gas collected from the first well is outside of a local range; and when it is determined that the first measure of concentration of the at least one constituent gas in the landfill gas collected from the first well is outside of the local range, determining to adjust the flow rate of the first well. 7. The method of claim 1 , wherein determining, using the second measure of the concentration of the at least one second constituent gas in the landfill gas collected from the first well, whether to adjust the flow rate of the first well comprises determining whether the second measure of the concentration of the at least one second constituent gas in the landfill gas collected from the first well is outside of a local range for the second constituent gas. 8. The method of claim 1 , wherein determining, using the second measure of the concentration of the at least one second constituent gas in the landfill gas collected from the first well, whether to adjust the flow rate of the first well comprises determining whether the second measure of the concentration of the at least one second constituent gas in the landfill gas collected from the first well is different from a target concentration. 9. The method of claim 1 , wherein determining, using the second measure of the concentration of the at least one second constituent gas in the landfill gas collected from the first well, whether to adjust the flow rate of the first well comprises determining whether the second measure of the concentration of the at least one second constituent gas in the landfill gas collected from the first well is greater than an upper threshold. 10. The method of claim 1 , wherein determining, using the second measure of the concentration of the at least one second constituent gas in the landfill gas collected from the first well, whether to adjust the flow rate of the first well comprises determining whether the second measure of the concentration of the at least one second constituent gas in the landfill gas collected from the first well is less than a lower threshold. 11. The method of claim 1 , further comprising: before increasing the flow rate of the landfill gas being extracted from the first well, determining whether a measure of carbon dioxide concentration of the landfill gas collected from the first well is less than a threshold concentration; and increasing the flow rate of the landfill gas being extracted from the first well when it is determined that the measure of carbon dioxide concentration of the landfill gas collected from the first well is less than the threshold concentration. 12. The method of claim 1 , further comprising: before increasing the flow rate of the landfill gas being extracted from the first well, determining whether a measure of hydrogen sulfide concentration of the landfill gas collected from the first well is less than a threshold concentration; and increasing the flow rate of the landfill gas being extracted from the first well when it is determined that the measure of hydrogen sulfide concentration of the landfill gas collected from the first well is less than the threshold concentration. 13. The method of claim 1 , further comprising: determining a scaling factor by which to proportionally adjust a degree to which a valve of the first well is opened or closed, the scaling factor being based at least in part on a difference between the second measure of concentration of the at least one second constituent gas in the landfill gas collected from the first well and a target concentration; and wherein adjusting the flow rate of landfill gas being extracted from the first well comprises adjusting the flow rate of landfill gas being extracted from the first well according to the scaling factor. 14. The method of claim 1 , further comprising: determining a scaling factor by which to proportionally adjust a degree to which a valve of the first well is opened or closed, the scaling factor being based at least in part on at least one characteristic of the first well; and wherein adjusting the flow rate of landfill gas being extracted from the first well comprises adjusting the flow rate of landfill gas being
Earth materials (G01N33/42 takes precedence) · CPC title
Measuring temperature or pressure · CPC title
Sulphides, e.g. H2S · CPC title
Organic compounds · CPC title
CO or CO2 · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.