Device and method for constructing a laminar body comprising at least one position adjustable body defining the working area
US-9242413-B2 · Jan 26, 2016 · US
US12076789B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-12076789-B2 |
| Application number | US-201716332154-A |
| Country | US |
| Kind code | B2 |
| Filing date | Dec 7, 2017 |
| Priority date | Jan 13, 2017 |
| Publication date | Sep 3, 2024 |
| Grant date | Sep 3, 2024 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
The present disclosure generally relates to additive manufacturing systems and methods on a large-scale format. One aspect involves a build unit that can be moved around in three dimensions by a positioning system, building separate portions of a large object. The build unit has an energy directing device that directs, e.g., laser or e-beam irradiation onto a powder layer. In the case of laser irradiation, the build volume may have a gasflow device that provides laminar gas flow to a laminar flow zone above the layer of powder. This allows for efficient removal of the smoke, condensates, and other impurities produced by irradiating the powder (the “gas plume”) without excessively disturbing the powder layer. The build unit may also have a recoater that allows it to selectively deposit particular quantities of powder in specific locations over a work surface to build large, high quality, high precision objects.
Opening claim text (preview).
The invention claimed is: 1. A method for fabricating an object comprising: (a) vertically dispensing powder from a build unit containing a hopper, a recoater blade, and an irradiation emission directing device, the hopper attached to a mounting plate of the build unit, and wherein the irradiation emission directing device is independently movable inside the build unit; (b) moving the recoater blade across the dispensed powder to form a first layer of powder over at least a portion of a first build area, the recoater blade disposed on the build unit and attached to the mounting plate adjacent to the hopper; (c) moving the recoater blade across the dispensed powder to form a second layer of powder over at least a portion of a second build area and laterally adjacent the first layer of powder in an xy plane; (d) irradiating at least part of the first layer of powder within the first build area to form a first fused layer; (e) repeating steps (a) through (d) to form the object, wherein a build envelope retains unfused powder about the object and has an xy cross sectional area in the xy plane which is larger than a square of a width of the recoater blade. 2. The method of claim 1 , further comprising: (d′) irradiating at least part of the second layer of powder within the second build area to form a second fused layer. 3. The method of claim 2 , wherein steps (c) and (d′) are performed after step (d) but before step (e). 4. The method of claim 2 , wherein the second layer of powder is substantially even with the first layer of powder, and wherein the xy cross section area is at least ten times larger than the square of the width of the recoater blade. 5. The method of claim 1 , wherein the step of irradiating is conducted using a laser beam that is directed by a laser irradiation directing device in a reduced oxygen environment. 6. The method of claim 1 , wherein the step of irradiating is conducted using an e-beam that is directed by an e-beam irradiation directing device. 7. The method of claim 1 , wherein the build envelope is formed from powder fused by irradiation. 8. The method of claim 1 , wherein the build envelope is formed by laser powder deposition. 9. The method of claim 1 , further comprising a step (f) of removing the build envelope and unfused powder to reveal the object. 10. The method of claim 5 , wherein a fiber-optic cable extends from a laser to the build unit. 11. A method for fabricating an object comprising: (a) moving a build unit to vertically dispense a first layer of powder over at least a first portion of a first build area in an xy area, the build unit comprising a hopper, a powder dispenser configured to dispense powder from the hopper, a recoater blade, a mounting plate to which the hopper and the recoater blade are attached, and an irradiation emission directing device, wherein the irradiation emission directing device is independently movable inside the build unit; wherein the xy area has an xy cross sectional area in an xy plane which is larger than the square of a width of the recoater blade; before moving a build unit upward, (a′) moving the recoater blade across the dispensed powder to form a second layer of powder over at least a portion of a second build area and laterally abutting the first layer of powder in the xy plane; (b) irradiating at least part of the first layer of powder within the first build area to form a first fused layer of the object; (c) repeating steps (a) and (b) to form the object, wherein a build envelope retains unfused powder. 12. The method of claim 11 , further comprising: (b′) irradiating at least part of the second layer of powder within the second build area to form a second fused layer. 13. The method of claim 12 , wherein steps (a′) and (b′) are performed after step (b) but before step (c). 14. The method of claim 12 , wherein second layer of powder is substantially even with the first layer of powder, and wherein the xy cross sectional area is at least ten times larger than a square of the width of the recoater blade. 15. The method of claim 11 , wherein the step of irradiating is conducted using a laser beam that is directed by a laser irradiation directing device, and is conducted in a reduced oxygen environment. 16. The method of claim 11 , wherein the step of irradiating is conducted using an electron beam that is directed by an e-beam irradiation directing device. 17. The method of claim 11 , wherein the build envelope is formed from powder fused by irradiation. 18. The method of claim 11 , wherein the build envelope is formed by laser powder deposition. 19. The method of claim 11 , further comprising step (d) of removing the build envelope and unfused powder within the envelope area to reveal the object. 20. The method of claim 15 , wherein a fiber-optic cable extends from a laser to the build unit. 21. The method of claim 11 , comprising using a second build unit to build at least a portion of a second object. 22. The method of claim 11 , comprising using a second build unit to build at least a portion of the build envelope.
Materials specially adapted for additive manufacturing · CPC title
Apparatus for additive manufacturing; Details thereof or accessories therefor · CPC title
Processes of additive manufacturing · CPC title
Overhang structures · CPC title
of energy beam parameters · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.