Stress estimation method for machine structure and monitoring method for machine structure

US12055453B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-12055453-B2
Application numberUS-202217930024-A
CountryUS
Kind codeB2
Filing dateSep 6, 2022
Priority dateSep 15, 2021
Publication dateAug 6, 2024
Grant dateAug 6, 2024

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A stress estimation method for a machine structure according to an embodiment is provided with a calculation step of calculating a relationship between the stress generated at the evaluation target position and a physical quantity including a sound pressure or vibration generated at a detection position different from the evaluation target position during vibration of the machine structure. The stress estimation method for a machine structure is provided with a detection step of detecting the physical quantity generated at the detection position during operation of the machine structure. The stress estimation method for a machine structure is provided with an estimation step of estimating the stress generated at the evaluation target position during operation of the machine structure on the basis of the relationship calculated in the calculation step and the physical quantity detected in the detection step.

First claim

Opening claim text (preview).

The invention claimed is: 1. A stress estimation method for a machine structure, the machine structure including a rotary device that rotates in response to pressure from a fluid, the method estimating stress generated at an evaluation target position provided in the rotary device of the machine structure during operation of the machine structure, the method comprising: a calculation step of calculating a relationship between the stress generated at the evaluation target position and a physical quantity including a sound pressure or vibration generated at a detection position located away from the rotary device during vibration of the machine structure; a detection step of detecting the physical quantity generated at the detection position during operation of the machine structure; and an estimation step of estimating the stress generated at the evaluation target position during operation of the machine structure on the basis of the relationship calculated in the calculation step and the physical quantity detected in the detection step. 2. The stress estimation method for a machine structure according to claim 1 , wherein the relationship in the calculation step is calculated by computer simulation. 3. The stress estimation method for a machine structure according to claim 1 , wherein the relationship in the calculation step is calculated by a vibration experiment. 4. The stress estimation method for a machine structure according to claim 1 , wherein the relationship in the calculation step is calculated by a combination of computer simulation and a vibration experiment. 5. The stress estimation method for a machine structure according to claim 1 , wherein the machine structure is a waterwheel structure. 6. A monitoring method for a machine structure, the machine structure including a rotary device that rotates in response to pressure from a fluid, the method monitoring a state of an evaluation target position provided in the rotary device of the machine structure during operation of the machine structure, the method comprising: a calculation step of calculating a relationship between the stress generated at the evaluation target position and a physical quantity including a sound pressure or vibration generated at a detection position located away from the rotary device during vibration of the machine structure; a determination step of determining a notification threshold value of the physical quantity during operation of the machine structure on the basis of the relationship calculated in the calculation step and allowable stress of the evaluation target position having been set; a detection step of detecting the physical quantity generated at the detection position during operation of the machine structure; and a notification step of notifying that the physical quantity detected in the detection step has exceeded the notification threshold value. 7. The monitoring method for a machine structure according to claim 6 , wherein the relationship in the calculation step is calculated by computer simulation. 8. The monitoring method for a machine structure according to claim 6 , wherein the relationship in the calculation step is calculated by a vibration experiment. 9. The monitoring method for a machine structure according to claim 6 wherein the relationship in the calculation step is calculated by a combination of computer simulation and a vibration experiment. 10. The monitoring method for a machine structure according to claim 6 , wherein the machine structure is a waterwheel structure.

Assignees

Inventors

Classifications

  • using acoustic waves, or acoustic emission (G01L1/10 and G01L1/16 take precedence) · CPC title

  • with acoustic surface waves · CPC title

  • using piezoelectric resonators · CPC title

  • optical excitation or measuring of vibrations · CPC title

  • optical excitation or measuring of vibrations · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US12055453B2 cover?
A stress estimation method for a machine structure according to an embodiment is provided with a calculation step of calculating a relationship between the stress generated at the evaluation target position and a physical quantity including a sound pressure or vibration generated at a detection position different from the evaluation target position during vibration of the machine structure. The…
Who is the assignee on this patent?
Toshiba Kk, Toshiba Energy Systems & Solutions Corp
What technology area does this patent fall under?
Primary CPC classification G01L23/08. Mapped technology areas include Physics.
When was this patent published?
Publication date Tue Aug 06 2024 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 2 related publications on this page (citations in our corpus or others sharing the same primary CPC).