Method for constructing elevator and elevator

US12043522B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-12043522-B2
Application numberUS-202117490369-A
CountryUS
Kind codeB2
Filing dateSep 30, 2021
Priority dateJun 5, 2019
Publication dateJul 23, 2024
Grant dateJul 23, 2024

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

The invention relates to a method for constructing an elevator, comprising providing an elevator car; providing plurality of prefabricated hoistway modules to be piled on top of each other, each hoistway module bordering a hoistway space into which the whole elevator car or at least an upper or lower end thereof can be fitted to move; and piling said plurality of prefabricated modules on top of each other, such that the hoistway spaces of the prefabricated modules are vertically aligned forming a continuous vertically elongated hoistway where the elevator car can be fitted to move; and arranging the elevator car to be vertically movable in the hoistway. The invention also relates to an elevator obtained with the method.

First claim

Opening claim text (preview).

The invention claimed is: 1. A method for constructing an elevator, comprising providing an elevator car; providing a plurality of prefabricated hoistway modules to be piled on top of each other, each separate prefabricated hoistway module of the plurality of prefabricated hoistway modules bordering a separate hoistway space into which an entire elevator car or at least an upper or lower end thereof can be fitted to move, such that the plurality of prefabricated hoistway modules border separate, respective hoistway spaces into which the entire elevator car or at least the upper or lower end thereof can be fitted to move; piling the plurality of prefabricated hoistway modules on top of each other to form a piled plurality of prefabricated hoistway modules, such that the separate, respective hoistway spaces of the plurality of prefabricated hoistway modules are vertically aligned with each other to form a continuous vertically elongated hoistway where the elevator car can be fitted to move; and arranging the elevator car to be vertically movable in the hoistway space, wherein the plurality of prefabricated hoistway modules includes a prefabricated top module, the prefabricated top module being an uppermost prefabricated hoistway module in the piled plurality of prefabricated hoistway modules, and wherein the prefabricated top module includes a machinery configured to drive a hoisting roping, and one or more car guide rail sections, wherein the machinery configured to drive the hoisting roping is mounted on a single car guide rail section of the one or more car guide rail sections of the prefabricated top module, such that the single car guide rail section is configured to carry both a complete weight of the machinery and a load exerted by the hoisting roping passing around a drive wheel of the machinery, wherein the single car guide rail section and a separate car guide rail section of the one or more car guide rail sections are fixed to different horizontal beams such that the single car guide rail section and the separate car guide rail section are fixed to the horizontal beams configured to be on opposite sides of the elevator car in the hoistway space. 2. The method according to claim 1 , wherein each separate prefabricated hoistway module of the plurality of prefabricated hoistway modules comprises a separate tubular frame around the separate hoistway space of the separate prefabricated hoistway module, such that the plurality of prefabricated hoistway modules include separate, respective tubular frames, and the separate tubular frame forms a bearing structure of the separate prefabricated hoistway module. 3. The method according to claim 2 , wherein each given tubular frame of each given prefabricated hoistway module underlying the prefabricated top module in the piled plurality of prefabricated hoistway modules carries a weight of an overlying tubular frame of all prefabricated hoistway modules overlying the given prefabricated hoistway module in the piled plurality of prefabricated hoistway modules. 4. The method according to claim 2 , wherein each separate prefabricated hoistway module of the plurality of prefabricated hoistway modules comprises one or more car guide rail sections, such that the plurality of prefabricated hoistway modules include separate, respective car guide rail sections, and the one or more car guide rail sections are each fixed on the separate tubular frame with at least one fixing bracket. 5. The method according to claim 4 , wherein the piling the plurality of prefabricated hoistway modules on top of each other to form the piled plurality of prefabricated hoistway modules causes the separate, respective car guide rail sections of the plurality of prefabricated hoistway modules to become vertically aligned with each other to form one or more continuous vertical guide rail lines configured to guide the elevator car. 6. The method according to claim 2 , further comprising: providing a counterweight, wherein each separate prefabricated hoistway module of the plurality of prefabricated hoistway modules includes one or more counterweight guide rail sections, such that the plurality of prefabricated hoistway modules include separate, respective counterweight guide rail sections, and wherein the one or more counterweight guide rail sections of the separate prefabricated hoistway module are fixed on the separate tubular frame of the separate prefabricated hoistway module with at least one fixing bracket. 7. The method according to claim 6 , wherein the piling the plurality of prefabricated hoistway modules on top of each other to form the piled plurality of prefabricated hoistway modules causes the separate, respective counterweight guide rail sections of the plurality of prefabricated hoistway modules to become vertically aligned with each other to form one or more continuous vertical guide rail lines configured to guide the counterweight. 8. The method according to claim 2 , wherein each separate tubular frame of the separate, respective tubular frames is a beam frame. 9. The method according to claim 8 , wherein the beam frame comprises the horizontal beams, vertical beams and diagonal beams rigidly connected together. 10. The method according to claim 9 , wherein each separate prefabricated hoistway module of the plurality of prefabricated hoistway modules comprises one or more car guide rail sections, and each of the one or more car guide rail sections is fixed with at least one fixing bracket on at least one of the horizontal beams of the beam frame of the separate prefabricated hoistway module; and/or each separate prefabricated hoistway module of the plurality of prefabricated hoistway modules comprises one or more counterweight guide rail sections, and each of the one or more counterweight guide rail sections is fixed with at least one fixing bracket on at least one of the horizontal beams of the beam frame of the separate prefabricated hoistway module. 11. The method according to claim 2 , wherein the separate tubular frame of the separate prefabricated hoistway module is a concrete frame comprising concrete or reinforced concrete, the concrete or reinforced concrete forming more than 50% of a weight of the concrete frame. 12. The method according to claim 11 , wherein the concrete frame comprises four vertical concrete walls rigidly connected together and bordering the separate hoistway space bordered by the separate prefabricated hoistway module. 13. The method according to claim 11 , wherein the concrete frame comprises a horizontal beam embedded in concrete of the concrete frame. 14. The method according to claim 1 , wherein the arranging includes arranging the elevator car to be vertically movable in the continuous vertically elongated hoistway along one or more car guide rail lines configured to guide the elevator car. 15. The method according to claim 1 , wherein the plurality of prefabricated hoistway modules comprise one or more of a prefabricated pit module, or one or more prefabricated intermediate modules into and through which an entire elevator car can be fitted to move. 16. The method according to claim 1 , wherein the prefabricated top module comprises a plurality of car guide rail sections including the single car guide rail section and the separate car guide rail section, a first rope fixing bracket configured to be fixed to a first end of the hoisting roping and further fixed to the separate car guide rail section such that the separate car guide rail section is configured to vertically carry a load exerted by the hoistin

Assignees

Inventors

Classifications

  • Lift shafts · CPC title

  • in the hoistway · CPC title

  • End supports, i.e. at top or bottom · CPC title

  • with a particular position in the shaft · CPC title

  • Constructional features of hoistways · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US12043522B2 cover?
The invention relates to a method for constructing an elevator, comprising providing an elevator car; providing plurality of prefabricated hoistway modules to be piled on top of each other, each hoistway module bordering a hoistway space into which the whole elevator car or at least an upper or lower end thereof can be fitted to move; and piling said plurality of prefabricated modules on top of…
Who is the assignee on this patent?
Kone Corp
What technology area does this patent fall under?
Primary CPC classification B66B7/026. Mapped technology areas include Operations & Transport.
When was this patent published?
Publication date Tue Jul 23 2024 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 5 related publications on this page (citations in our corpus or others sharing the same primary CPC).