High-pressure vessel mounting structure
US-2021237562-A1 · Aug 5, 2021 · US
US12031673B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-12031673-B2 |
| Application number | US-202217931983-A |
| Country | US |
| Kind code | B2 |
| Filing date | Sep 14, 2022 |
| Priority date | Oct 4, 2021 |
| Publication date | Jul 9, 2024 |
| Grant date | Jul 9, 2024 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
A method for manufacturing a tank unit includes performing a pressure resistance inspection on each of a plurality of high pressure tanks before connecting the high pressure tanks, and connecting a gas flow path to the high pressure tanks that have passed the pressure resistance inspection.
Opening claim text (preview).
What is claimed is: 1. A method for manufacturing a tank unit, comprising: performing a pressure resistance inspection on each of a plurality of high pressure tanks before connecting the high pressure tanks; and connecting a gas flow path to the high pressure tanks that have passed the pressure resistance inspection, wherein each of the high pressure tanks has an opening in a top and a bottom of each of the high pressure tanks, the opening in the bottom is sealed with a plug and a liquid is injected through the opening in the top into each of the high pressure tanks to perform the pressure resistance inspection, after the plug is removed and inside of each of the high pressure tanks is dried, an end cap is attached to the opening in the bottom, and the end cap of each of the high pressure tanks is fitted in a bottom connector to connect the high pressure tanks. 2. The method according to claim 1 , wherein the tops of the high pressure tanks are connected by a top connector when connecting the gas flow path to the high pressure tanks, and all the high pressure tanks are contained in a smallest rectangular parallelepiped containing the bottom connector and the top connector.
Hydrogen · CPC title
Assembling processes · CPC title
High pressure (>10 bar) · CPC title
Fuel cells · CPC title
bundled in parallel · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.