Coal uncovering construction method for blasting large cross-section gas tunnels

US12025007B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-12025007-B2
Application numberUS-202318224720-A
CountryUS
Kind codeB2
Filing dateJul 21, 2023
Priority dateJul 26, 2022
Publication dateJul 2, 2024
Grant dateJul 2, 2024

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A coal uncovering construction method for blasting large cross-section gas tunnels includes: analyzing stress distribution characteristics in front of a tunnel boring working face, and then determining a thickness calculation model of a reserved rock wall based on a limit equilibrium theory; establishing a tunnel model, simulating a construction condition and analyzing a construction result, and determining a thickness of the reserved rock wall; and fixing a detonator through a fixed sand ring, fitting the detonator with a construction hole by adjusting an adjustable protective plate, then embedding the detonator into a blast hole, and blasting the detonator for tunnel construction. Furthermore, an extension ring is fixed between the fixed sand ring and the adjustable protective plate.

First claim

Opening claim text (preview).

What is claimed is: 1. A coal uncovering construction method for blasting a tunnel, comprising the following steps: fixing a detonator through a fixed sand ring, embedding the detonator into the blast hole, and blasting the detonator for tunnel construction; wherein an extension ring is fixed between the fixed sand ring and the protective plate, a bottom of the protective plate is rotatably connected with a support foot, an inner side of the fixed sand ring is connected with a plurality of extrusion rods, the plurality of extrusion rods are distributed in an array, an end of each of the plurality of extrusion rods facing towards a center of the fixed sand ring is fixedly connected to an adhesive plate, and a side of the adhesive plate facing away from the extrusion rod is connected to a sponge mat; wherein an outer surface of each of the plurality of extrusion rods is provided with a plurality of arc-shaped blocks, exteriors of the plurality of arc-shaped blocks are slidably connected with a plurality of support elastic pieces, the plurality of support elastic pieces are connected with the fixed sand ring and are distributed in an array inside the fixed sand ring, and the plurality of arc-shaped blocks and the plurality of support elastic pieces are arc-shaped and each of the plurality of arc-shaped blocks is matched with a corresponding one of the plurality of support elastic pieces; and wherein each of the plurality of extrusion rods is provided with an explosion-proof housing therein, the explosion-proof housing is provided with an energizing magnet therein, a side of the energizing magnet facing towards the adhesive plate is provided with a counterweight block, the counterweight block is provided with a follow-up magnet therein; when the energizing magnet is energized, a magnetic property of the energizing magnet is the same as that of the follow-up magnet, a side of the counterweight block facing away from the energizing magnet is provided with a knocking needle, a side of the knocking needle facing away from the energizing magnet is provided with a glass housing, the glass housing is loaded with corrosive liquid therein, a bottom end of the explosion-proof housing defines a liquid discharging hole, and the extrusion rod and the adhesive plate are respectively provided with through holes matched with the liquid discharging hole; wherein the fixing the detonator through the fixed sand ring, comprises: placing the detonator into the fixed sand ring, pushing the plurality of extrusion rods to move the plurality of adhesive plates connected to the plurality of extrusion rods until the plurality of sponge mats connected to the plurality of adhesive plates are attached to an outer surface of the detonator; and wherein after the detonator is embedded into the blast hole, the coal uncovering construction method further comprises: adjusting an angle of the support foot to support the protective plate, thereby to support the detonator in the blast hole. 2. The coal uncovering construction method for blasting the tunnel as claimed in claim 1 , wherein an exterior of the counterweight block is slidably connected with a limiting frame, the limiting frame is provided with elastic pieces therein disposed on two sides of the counterweight block, and the elastic pieces are configured to support the counterweight block. 3. The coal uncovering construction method for blasting the tunnel as claimed in claim 2 , wherein an end of the limiting frame facing away from the energizing magnet is provided with a rubber ring, and a buffer sponge is disposed between an exterior of the glass housing and the explosion-proof housing. 4. The coal uncovering construction method for blasting the tunnel as claimed in claim 3 , wherein a side of the liquid discharging hole facing away from the buffer sponge is slidably connected with a magnetic closing block, a plurality of telescopic rods are fixed between the magnetic closing block and the explosion-proof housing, and a side of the magnetic closing block facing towards the buffer sponge is provided with a telescopic needle. 5. The coal uncovering construction method for blasting the tunnel as claimed in claim 1 , wherein a side of the explosion-proof housing facing away from the adhesive plate is inserted with a hollow column, the hollow column is filled with colored smoke and defines a plurality of exhaust vents, each of the plurality of exhaust vents is provided with a counterweight ball therein, an outer surface of the counterweight ball is provided with a plurality of puncture needles, a supporting elastic rod is fixed between the counterweight ball and the hollow column, two sides of the counterweight ball are provided with elastic films, and the extrusion rod defines a plurality of through holes, which are matched with the plurality of exhaust vents. 6. The coal uncovering construction method for blasting the tunnel as claimed in claim 5 , wherein the hollow column is provided with a plurality of stirring balls therein, and each of the plurality of stirring balls is connected to the hollow column through a connecting elastic rope. 7. The coal uncovering construction method for blasting the tunnel as claimed in claim 1 , wherein the adhesive plate is slidably connected with a pair of jacking rods therein, a side of each of the pair of jacking rods facing away from the sponge mat is provided with a powder storage bag, and a side of the powder storage bag facing away from a center of the adhesive plate is connected with a powder discharging pipe in a penetrating manner. 8. A coal uncovering construction method for blasting a tunnel, comprising the following steps: providing an assembly for fixing a detonator, wherein the assembly comprises: a fixed sand ring; a protective plate; an extension ring, fixed between the fixed sand ring and the protective plate; a support foot, connected to a bottom of the protective plate; a plurality of extrusion rods, connected to the fixed sand ring and extending into the fixed sand ring; a plurality of arc-shaped blocks, disposed on an outer surface of each of the plurality of extrusion rods; a plurality of support elastic pieces, disposed on the fixed sand ring, and matched with the plurality of arc-shaped blocks; a plurality of adhesive plates, connected to ends of the plurality of extrusion rods facing towards a center of the fixed sand ring, respectively; and a plurality of sponge mats, connected to sides of the plurality of adhesive plates facing away from the plurality of extrusion rods, respectively; placing the detonator into the fixed sand ring, pushing the plurality of extrusion rods to drive the plurality of adhesive plates to move towards the detonator until the plurality of sponge mats are attached to an outer surface of the detonator to fix the detonator in the fixed sand ring; wherein each of the plurality of extrusion rods is pushed to drive the plurality of arc-shaped blocks to slide, thereby to push the plurality of support elastic pieces to bend and deform until the plurality of arc-shaped blocks slide over the plurality of support elastic pieces, and then the plurality of support elastic pieces reset; and embedding the detonator fixed with the fixed sand ring into a blast hole excavated in the tunnel, adjusting an angle of the support foot to support the protective plate, and thereby to support the detonator in the blast hole, thereafter blasting the detonator in the blast hole for tunnel construction. 9. The coal uncovering construction method for blasting the tunnel as claimed in claim 8 , wherein the assembly further comprises: a plurality of explosion-proof housings, disposed in the plurality of extrusion rods, respectively; wherein a bottom end of ea

Assignees

Inventors

Classifications

  • Rendering explosive charges harmless, e.g. destroying ammunition ({F42B39/14 and F42B39/20 take precedence } ; extracting primers, dismantling ammunition F42B33/04, F42B33/06 {; chemical deactivating of explosives C06B21/0091}); Rendering detonation of explosive charges harmless · CPC title

  • for rock blasting · CPC title

  • E21D9/006Primary

    by making use of blasting methods (explosive compositions C06B; blasting per se F42) · CPC title

  • F42D1/00Primary

    Blasting methods or apparatus, e.g. loading or tamping · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US12025007B2 cover?
A coal uncovering construction method for blasting large cross-section gas tunnels includes: analyzing stress distribution characteristics in front of a tunnel boring working face, and then determining a thickness calculation model of a reserved rock wall based on a limit equilibrium theory; establishing a tunnel model, simulating a construction condition and analyzing a construction result, an…
Who is the assignee on this patent?
China Railway 16Th Bureau Group Co Ltd, China Railway Eryuan Eng Group, Univ Beijing Jiaotong, and 4 more
What technology area does this patent fall under?
Primary CPC classification E21D9/006. Mapped technology areas include Fixed Constructions.
When was this patent published?
Publication date Tue Jul 02 2024 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 1 related publication on this page (citations in our corpus or others sharing the same primary CPC).