Dynamic embedded-sim configuration

US12022564B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-12022564-B2
Application numberUS-202117336501-A
CountryUS
Kind codeB2
Filing dateJun 2, 2021
Priority dateJun 2, 2021
Publication dateJun 25, 2024
Grant dateJun 25, 2024

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

Embodiments of the present invention provide computer-implemented methods, computer program products, and computer systems. Embodiments of the present invention can dynamically determine an optimal embedded subscriber identification module (eSIM) configuration of respective edge devices connected to a network. Embodiments of the present invention can then dynamically change a data plan associated with the eSIM of respective edge devices connected to the network such that activity can be executed with required quality by the respective edge devices based on contextual need of data processing, volume of data transfer, and speed of data transfer among the respective edge devices.

First claim

Opening claim text (preview).

What is claimed is: 1. A computer-implemented method comprising: dynamically determining an optimal embedded subscriber identification module (eSIM) configuration of respective edge devices interconnected via a network by: identifying a context associated with a received processing task for edge processing, and predicting a data volume associated with the received processing task for edge processing based on the identified context, and apportioning processing responsibilities between the respective edge devices based on the identified context, predicted data volume, and speed of data transfer among the respective edge devices such that the received processing task is processed between the respective edge devices; and dynamically changing transmission rates of the eSIM of respective edge devices connected to the network during the processing task such that activity can be executed with required quality by the respective edge devices based on the dynamically determined optimal embedded subscriber identification (eSIM) configuration. 2. The computer-implemented method of claim 1 , further comprising: increasing or decreasing the data plan based on an identified context for edge processing and service level agreements requirements. 3. The computer-implemented method of claim 2 , further comprising: reconfiguring eSIM configuration of respective edge devices based, at least in part, on a change in data requirements for a received processing task. 4. The computer-implemented method of claim 3 , wherein reconfiguring eSIM configuration of respective edge devices based, at least in part, on a change in data requirements for the received processing task comprises: identifying a new edge device connecting to the network; apportioning processing of the received task to include the identified new edge device; and reconfiguring eSIM configuration of respective edge devices based on device capabilities of the identified new edge device. 5. The computer-implemented method of claim 1 , wherein identifying a context associated with a received processing task for edge processing comprises: determining contextual need of edge processing based, at least in part, on historical analysis of edge processing need. 6. The computer-implemented method of claim 1 , further comprising: tracking length of time respective edge devices have participated in edge computing using a distributed ledger system. 7. A computer program product comprising: one or more computer readable storage media and program instructions stored on the one or more computer readable storage media, the program instructions comprising: program instructions to dynamically determine an optimal embedded subscriber identification module (eSIM) configuration of respective edge devices interconnected via a network by: identifying a context associated with a received processing task for edge processing, and predicting a data volume associated with the received processing task for edge processing based on the identified context, and apportioning processing responsibilities between the respective edge devices based on the identified context, predicted data volume, and speed of data transfer among the respective edge devices such that the received processing task is processed between the respective edge devices; and program instructions to dynamically change rates of the eSIM of respective edge devices connected to the network during the processing task such that activity can be executed with required quality by the respective edge devices based on the dynamically determined optimal embedded subscriber identification (eSIM) configuration. 8. The computer program product of claim 7 , wherein the program instructions stored on the one or more computer readable storage media further comprise: program instructions to increase or decrease the data plan based on an identified context for edge processing and service level agreements requirements. 9. The computer program product of claim 8 , wherein the program instructions stored on the one or more computer readable storage media further comprise: program instructions to reconfigure eSIM configuration of respective edge devices based, at least in part, on a change in data requirements for a received processing task. 10. The computer program product of claim 9 , wherein the program instructions to reconfigure eSIM configuration of respective edge devices based, at least in part, on a change in data requirements for the received processing task comprise: program instructions to identify a new edge device connecting to the network; program instructions to apportion processing of the received task to include the identified new edge device; and program instructions to reconfigure eSIM configuration of respective edge devices based on device capabilities of the identified new edge device. 11. The computer program product of claim 7 , wherein the program instructions to identify a context associated with a received processing task for edge processing comprise: program instructions to determine contextual need of edge processing based, at least in part, on historical analysis of edge processing need. 12. The computer program product of claim 7 , wherein the program instructions stored on the one or more computer readable storage media further comprise: program instructions to track length of time respective edge devices have participated in edge computing using a distributed ledger system. 13. A computer system comprising: one or more computer processors; one or more computer readable storage media; and program instructions stored on the one or more computer readable storage media for execution by at least one of the one or more computer processors, the program instructions comprising: program instructions to dynamically determine an optimal embedded subscriber identification module (eSIM) configuration of respective edge devices interconnected via a network by: identifying a context associated with a received processing task for edge processing, and predicting a data volume associated with the received processing task for edge processing based on the identified context, and apportioning processing responsibilities between the respective edge devices based on the identified context, predicted data volume, and speed of data transfer among the respective edge devices such that the received processing task is processed between the respective edge devices; and program instructions to dynamically change rates of the eSIM of respective edge devices connected to the network during the processing task such that activity can be executed with required quality by the respective edge devices based on the dynamically determined optimal embedded subscriber identification (eSIM) configuration. 14. The computer system of claim 13 , wherein the program instructions stored on the one or more computer readable storage media further comprise: program instructions to increase or decrease the data plan based on an identified context for edge processing and service level agreements requirements. 15. The computer system of claim 14 , wherein the program instructions stored on the one or more computer readable storage media further comprise: program instructions to reconfigure eSIM configuration of respective edge devices based, at least in part, on a change in data requirements for a received processing task. 16. The computer system of claim 15 , wherein the program instructions to reconfigure eSIM configuration of respective edge devices based, at least in part, on a change in data requirements for the

Assignees

Inventors

Classifications

  • Data or packet based · CPC title

  • based on quality of service [QoS] · CPC title

  • Rating or billing plans; Tariff determination aspects · CPC title

  • Linked or grouped accounts, e.g. of users or devices · CPC title

  • by SIM, e.g. smart card account in SCP, SDP or SN · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US12022564B2 cover?
Embodiments of the present invention provide computer-implemented methods, computer program products, and computer systems. Embodiments of the present invention can dynamically determine an optimal embedded subscriber identification module (eSIM) configuration of respective edge devices connected to a network. Embodiments of the present invention can then dynamically change a data plan associat…
Who is the assignee on this patent?
IBM
What technology area does this patent fall under?
Primary CPC classification H04W8/18. Mapped technology areas include Electricity.
When was this patent published?
Publication date Tue Jun 25 2024 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 7 related publications on this page (citations in our corpus or others sharing the same primary CPC).