Method for creating and executing action resource, and electronic device

US12010176B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-12010176-B2
Application numberUS-202017642976-A
CountryUS
Kind codeB2
Filing dateSep 14, 2020
Priority dateSep 20, 2019
Publication dateJun 11, 2024
Grant dateJun 11, 2024

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

Provided is a method for creating an action resource. The method includes: receiving a first creation request, wherein the first creation request includes a first target resource; and creating a first action resource based on the first creation request, wherein the first action resource is configured to trigger a first action for the first target resource; wherein creating the first action resource includes: creating a first action status attribute used for the first action resource, wherein the first action status attribute indicates a status of the first action.

First claim

Opening claim text (preview).

What is claimed is: 1. A method for creating an action resource, comprising: receiving a first creation request, wherein the first creation request comprises a first target resource; and creating a first action resource based on the first creation request, wherein the first action resource is configured to trigger a first action for the first target resource; wherein creating the first action resource comprises: creating a first action status attribute for the first action resource, wherein the first action status attribute indicates a status of the first action; creating a first action time attribute for the first action resource, wherein the first action time attribute indicates a time parameter related to the first action; creating a first status automatic control time attribute for the first action resource, wherein an attribute value of the first action status attribute comprises a first set value and a second set value, the first set value and the second set value being opposite to each other, and the first status automatic control time indicates changing the attribute value of the first action status attribute from the first set value to the second set value in the case that the attribute value of the first action status attribute is the first set value, and an attribute value of the first action time attribute is greater than or equal to an attribute value of the first status automatic control time attribute. 2. The method according to claim 1 , wherein creating the first action resource further comprises: creating the first action time attribute for the first action resource, and the method further comprises: receiving a second creation request, wherein the second creation request comprises a second target resource; and creating a second action resource based on the second creation request, wherein the second action resource is configured to trigger a second action for the second target resource, the second action being triggered for the second target resource in the case that a second trigger condition is satisfied; wherein creating the second action resource comprises: creating a second action status attribute for the second action resource, wherein the second action status attribute indicates a status of the second action. 3. The method according to claim 2 , wherein creating the second action resource further comprises: creating a second action time attribute for the second action resource; wherein the second action time attribute indicates a time parameter related to the second action. 4. The method according to claim 2 , wherein the first target resource and the second target resource are the same, and the first action and the second action are in conflict with each other. 5. The method according to claim 3 , wherein the first creation request further comprises dependency resource information; and creating the first action resource further comprises: creating a first dependency sub-resource for the first action resource based on the dependency resource information, wherein the first dependency sub-resource comprises a first dependency condition, the first dependency condition being related to the second action status attribute, and the first action is triggered for the first target resource in the case that a first trigger condition and the first dependency condition are simultaneously satisfied; or creating a second dependency sub-resource for the first action resource based on the dependency resource information, wherein the second dependency sub-resource comprises a second dependency condition, the second dependency condition being related to the second action time attribute, and the first action is triggered for the first target resource in the case that the first trigger condition and the second dependency condition are simultaneously satisfied; or creating the first dependency sub-resource and the second dependency sub-resource for the first action resource based on the dependency resource information, wherein the first dependency sub-resource comprises the first dependency condition, the second dependency sub-resource comprises the second dependency condition; and the first dependency condition is related to the second action status attribute, the second dependency condition is related to the second action time attribute, and the first action is triggered for the first target resource in the case that at least one of the first dependency condition and the second dependency condition, and the first trigger condition are simultaneously satisfied. 6. The method according to claim 5 , wherein the method meets at least one of the following requirements: wherein the first dependency condition is that the attribute value of the second action status attribute and a first set value satisfy a first preset logical relationship, the first set value being active or inactive; and the second dependency condition is that an attribute value of the second action time attribute and a preset action time satisfy a second preset logical relationship; or wherein creating the first action resource further comprises: creating a first opposite action attribute and a first status control attribute for the first action resource; creating the second action resource further comprises: creating a second opposite action attribute and a second status control attribute for the second action resource; the first opposite action attribute indicates an identification code of the second action resource, and the second opposite action attribute indicates an identification code of the first action resource; and the first status control attribute indicates whether to change an attribute value of the first action status attribute or an attribute value of the second action status attribute, and the second status control attribute indicates whether to change an attribute value of the second action status attribute or an attribute value of the first action status attribute. 7. The method according to claim 2 , wherein the first creation request further comprises conflict policy resource information; and creating the first action resource further comprises: creating a conflict policy sub-resource for the first action resource based on the conflict policy resource information. 8. The method according to claim 7 , wherein creating the first action resource further comprises: creating a first dependency sub-resource for the first action resource in the case that the second target resource, the second action, and the conflict policy sub-resource satisfy a matching condition, wherein the first dependency sub-resource comprises a first dependency condition, the first dependency condition being related to the second action status attribute, and the first action is triggered for the first target resource in the case that the first dependency condition and the first trigger condition are simultaneously satisfied; or creating the first action resource further comprises: creating a second dependency sub-resource for the first action resource in the case that the second target resource, the second action, and the conflict policy sub-resource satisfy the matching condition, wherein the second dependency sub-resource comprises a second dependency condition, the second dependency condition being related to the second action time attribute, and the first action is triggered for the first target resource in the case that the second dependency condition and the first trigger condition are simultaneously satisfied; or creating the first action resource further comprises: creating the first dependency sub-resource and the second dependency sub-resource for the first action resource in the case that the second target resource, the second action, and the conflict pol

Assignees

Inventors

Classifications

  • H04L67/12Primary

    specially adapted for proprietary or special-purpose networking environments, e.g. medical networks, sensor networks, networks in vehicles or remote metering networks · CPC title

  • G06F9/542Primary

    Event management; Broadcasting; Multicasting; Notifications · CPC title

  • considering software capabilities, i.e. software resources associated or available to the machine · CPC title

  • considering the load · CPC title

  • Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS] · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US12010176B2 cover?
Provided is a method for creating an action resource. The method includes: receiving a first creation request, wherein the first creation request includes a first target resource; and creating a first action resource based on the first creation request, wherein the first action resource is configured to trigger a first action for the first target resource; wherein creating the first action reso…
Who is the assignee on this patent?
Boe Technology Group Co Ltd
What technology area does this patent fall under?
Primary CPC classification H04L67/12. Mapped technology areas include Electricity.
When was this patent published?
Publication date Tue Jun 11 2024 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 4 related publications on this page (citations in our corpus or others sharing the same primary CPC).