Rock drilling arrangement and machine

US12005558B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-12005558-B2
Application numberUS-202017436732-A
CountryUS
Kind codeB2
Filing dateMar 16, 2020
Priority dateMar 14, 2019
Publication dateJun 11, 2024
Grant dateJun 11, 2024

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A rock drilling arrangement includes an impact device having a frame, pressure chambers in the frame, and a piston arranged in the impact device. The arrangement further includes a rear mounting arrangement for attaching the impact device to a carriage, a front mounting arrangement for attaching the impact device to a machine component, at least one fore pressure accumulator arranged on a front side of the rear mounting arrangement in an axial direction of the piston, and at least one rear pressure accumulator arranged on a back side of the rear mounting arrangement. The fore pressure accumulator and the rear pressure accumulator are connected to one of the pressure chambers and arranged to absorb pressure fluctuations in the pressure chambers.

First claim

Opening claim text (preview).

The invention claimed is: 1. A rock drilling arrangement comprising: an impact device including a frame, a plurality of pressure chambers in the frame, and a piston arranged in the impact device; a rear mounting arrangement arranged for attaching the impact device to a carriage, the rear mounting arrangement having a front side and a back side and including two fastening lugs having a through hole as a mounting hole and arranged perpendicular in relation to an axial direction of the piston; a front mounting arrangement arranged for attaching the impact device to a machine component; at least one fore pressure accumulator arranged on the front side of the rear mounting arrangement in the axial direction of the piston; and at least one rear pressure accumulator arranged on back side of the rear mounting arrangement, the at least one fore pressure accumulator and the at least one rear pressure accumulator being connected to one of the plurality of pressure chambers and arranged to absorb pressure fluctuations in the plurality of pressure chambers. 2. The arrangement as claimed in claim 1 , wherein the at least one fore pressure accumulator comprises at least two fore pressure accumulators. 3. The arrangement as claimed in claim 1 , wherein the at least one fore pressure accumulator comprises four fore pressure accumulators. 4. The arrangement as claimed in claim 1 , wherein the at least one rear pressure accumulator comprises at least two rear pressure accumulators. 5. The arrangement as claimed in claim 1 , wherein the at least one fore accumulator comprises a plurality of fore pressure accumulators, at least one of the fore pressure accumulators being a high pressure accumulator having a pre-charge pressure in the range of 50-150 bar. 6. The arrangement as claimed in claim 5 , wherein each of the plurality of fore pressure accumulators is a high pressure accumulator. 7. The arrangement as claimed in claim 1 , wherein the at least one rear accumulator comprises a plurality of rear pressure accumulators, at least one of the plurality of rear pressure accumulators is a low pressure having a pre-charge pressure in the range of 1-5 bar. 8. The arrangement as claimed in claim 7 , wherein each of the plurality of rear pressure accumulators is a low pressure accumulator. 9. The arrangement as claimed in claim 1 , wherein the at least one fore and at least one rear pressure accumulator is arranged on a side of the frame. 10. The arrangement as claimed in claim 1 , wherein at least one of the at least one fore pressure accumulator and the at least one rear pressure accumulator is arranged on a top of the frame. 11. The arrangement as claimed in claim 1 , wherein the at least one fore accumulator and the at least one rear accumulator comprise two low pressure accumulators arranged at different positions in the axial direction of the piston. 12. A rock drilling machine comprising a drilling arrangement according to claim 1 .

Assignees

Inventors

Classifications

  • E21B4/14Primary

    Fluid operated hammers · CPC title

  • Couplings, e.g. special connections between components · CPC title

  • for hydraulically actuated hammers having an accumulator · CPC title

  • Details of, or accessories for, portable power-driven percussive tools {(details or components, e.g. casings, bodies, of portable power-driven tools not particularly related to the operation performed B25F5/00)} · CPC title

  • B25D17/28Primary

    Supports; Devices for holding power-driven percussive tools in working position {(connections of hammers to backhoes E02F3/966)} · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US12005558B2 cover?
A rock drilling arrangement includes an impact device having a frame, pressure chambers in the frame, and a piston arranged in the impact device. The arrangement further includes a rear mounting arrangement for attaching the impact device to a carriage, a front mounting arrangement for attaching the impact device to a machine component, at least one fore pressure accumulator arranged on a front…
Who is the assignee on this patent?
Sandvik Mining & Construction Oy
What technology area does this patent fall under?
Primary CPC classification E21B4/14. Mapped technology areas include Fixed Constructions.
When was this patent published?
Publication date Tue Jun 11 2024 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 8 related publications on this page (citations in our corpus or others sharing the same primary CPC).