Electric circuit arrangement and a method for the functional testing of a monitoring device for an electric power supply system
US-2021341542-A1 · Nov 4, 2021 · US
US12000881B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-12000881-B2 |
| Application number | US-202218089735-A |
| Country | US |
| Kind code | B2 |
| Filing date | Dec 28, 2022 |
| Priority date | Dec 28, 2021 |
| Publication date | Jun 4, 2024 |
| Grant date | Jun 4, 2024 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
A method for automatically creating installation-specific measuring profiles for an insulation monitoring system, includes: assisting in a computer-controlled manner by means of an assist system via guided instructions for acquiring installation data; and executing the instructions by means of one more sensor devices. The method further includes pre-selecting, assisting, recording, evaluating, detecting, and optimizing steps.
Opening claim text (preview).
What is claimed is: 1. A method for automatically creating installation-specific measuring profiles for an insulation monitoring system of an electric installation, the method comprising: assisting in a computer-controlled manner by means of an assist system via guided instructions for detecting technical and non-technical installation data, and partially automatically and/or automatically executing the guided instructions for acquiring the technical and non-technical installation data by means of one more sensor devices, preselecting in a computer-aided manner a measuring profile based on the acquired technical and non-technical installation data, assisting in a computer-aided manner by means of the assist system via the guided instructions for operating the electric installation during regular operation with changing operating states using the preselected measuring profile with installation measured data, and with synchronously recording a measuring behavior of the insulation monitoring system by means of storing insulation-monitoring-system measured data during regular operation, evaluating the measuring behavior of the insulation monitoring system, detecting disturbance variables from the installation measured data if the measuring behavior proves to be prone to disturbances, and simulating regular operation with the preselected measuring profile using the installation measured data afflicted with the disturbance variables, and subsequently optimizing the preselected measuring profile by adapting measuring-profile parameters with regard to a disturbance-resistant insulation monitoring. 2. The method according to claim 1 , wherein the assist system is an end device of an installation operator in the form of a smartphone, a tablet PC, a notebook, virtual reality glasses or augmented reality glasses, and computer-controlled assisting takes place by means of an application executable on the end device. 3. The method according to claim 2 , wherein the computer-controlled assisting is supported by virtual reality methods and/or augmented reality methods. 4. The method according to claim 3 , including acquiring the technical and non-technical installation data and the installation measured data by means of sensor devices installed in the assist system. 5. The method according to claim 4 , including optimizing the preselected measuring profile by adapting measuring-profile parameters, using artificial intelligence. 6. The method according to claim 5 , including transmitting the installation measured data and the insulation-monitoring-system measured data by means of a radio transmission path. 7. The method according to claim 1 , wherein computer-controlled assisting is supported by virtual reality methods and/or augmented reality methods. 8. The method according to claim 7 , including acquiring the technical and non-technical installation data and the installation measured data by means of sensor devices installed in the assist system. 9. The method according to claim 8 , including optimizing the preselected measuring profile by adapting measuring-profile parameters, using artificial intelligence. 10. The method according to claim 9 , including transmitting the installation measured data and the insulation-monitoring-system measured data by means of a radio transmission path. 11. The method according to claim 1 , including acquiring the technical and non-technical installation data and the installation measured data by means of sensor devices installed in the assist system. 12. The method according to claim 11 , including optimizing the preselected measuring profile by adapting measuring-profile parameters, using artificial intelligence. 13. The method according to claim 12 , including transmitting the installation measured data and the installation-monitoring-system measured data by means of a radio transmission path. 14. The method according to claim 1 , including optimizing the preselected measuring profile by adapting measuring-profile parameters, using artificial intelligence. 15. The method according to claim 14 , including transmitting the installation measured data and the installation-monitoring-system measured data by means of a radio transmission path. 16. The method according to claim 1 , including transmitting the installation measured data and the installation-monitoring-system measured data by means of a radio transmission path.
of cable, line or wire insulation, e.g. using partial discharge measurements (locating faults in cables G01R31/083) · CPC title
concerning dedicated user interfaces, e.g. GUI, or dedicated keyboards (G01R31/31912 takes precedence) · CPC title
where the computing system is an embedded system, i.e. a combination of hardware and software dedicated to perform a certain function in mobile devices, printers, automotive or aircraft systems (testing or monitoring of control systems or parts thereof G05B23/02) · CPC title
Configuration details thereof, e.g. installation, enabling, spatial arrangement of the probes · CPC title
Testing dielectric strength or breakdown voltage {; Testing or monitoring effectiveness or level of insulation, e.g. of a cable or of an apparatus, for example using partial discharge measurements; Electrostatic testing (G01R31/08, G01R31/327 and G01R31/72 take precedence; measuring in plasmas G01R19/0061; measuring dielectric constants G01R27/2617; ESD, EMC or EMP testing of circuits G01R31/002)} · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.