Method for determination of real subsoil geological formation

US11995382B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-11995382-B2
Application numberUS-202017092106-A
CountryUS
Kind codeB2
Filing dateNov 6, 2020
Priority dateNov 8, 2019
Publication dateMay 28, 2024
Grant dateMay 28, 2024

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

The present disclosure relates to a method for determination of a real subsoil geological formation. In at least one embodiment, the method includes receiving a model representing the real subsoil, determining a first stochastic trajectory of a first fluvial formation in said model, defining a constraint zone comprising said first fluvial formation, and determining a second stochastic trajectory of a second fluvial formation in said model within said constraint zone based on a stochastic process.

First claim

Opening claim text (preview).

The invention claimed is: 1. A method for determination of a real subsoil geological formation, comprising: receiving a model representing the real subsoil geological formation; determining a first stochastic trajectory of a first fluvial formation in said model; defining a constraint zone comprising said first fluvial formation; determining a second stochastic trajectory of a second fluvial formation in said model within said constraint zone based on a stochastic process; reiterating the defining the constraint zone and the determining the second stochastic trajectory of the second fluvial formation, and in said reiteration, the second fluvial formation is taken as the first fluvial formation and a third stochastic trajectory of a third fluvial formation is taken as the second stochastic trajectory of the second fluvial formation; and outputting a complete model to a computing device, the complete model providing data indicating at least the first, second, and third fluvial formations as real subsoil geological formations, which is usable to identify a hydrocarbon reservoir based on the first, second, and third fluvial formations and enable an industrial production plan for production of hydrocarbons based on the complete model. 2. The method of claim 1 , wherein edges of the constraint zone are within a predetermined distance to the first stochastic trajectory of the first fluvial formation. 3. The method of claim 1 , wherein the determining the second stochastic trajectory of the second fluvial formation is reiterated a predetermined number of times. 4. The method of claim 2 , wherein the determining the second stochastic trajectory of the second fluvial formation comprises a displacement of the constraint zone according to a given direction between iterations. 5. The method of claim 1 , wherein determining the second stochastic trajectory comprises: determining a point of the model based on the stochastic process; and if said point is outside the constraint zone, reiterating the determining a point of the model based on the stochastic process, otherwise, adding said point to the second stochastic trajectory, wherein if the reiteration of the determining a point of the model based on the stochastic process exceeds a predetermined number, the determining of the second stochastic trajectory is reinitialized. 6. The method of claim 1 , wherein determining the second stochastic trajectory comprises: determining a point of the second stochastic trajectory; and if said point is outside the constraint zone, changing coordinates of said point to a closest point of the constraint zone. 7. The method of claim 1 , wherein determining the second stochastic trajectory comprises: determining a point of the second stochastic trajectory; and if said point is outside the constraint zone, reiterating the determining a point of the model based on the stochastic process, wherein if the reiteration of the determining a point of the model based on the stochastic process exceeds a predetermined number, coordinates of said point are changed to a closest point of the constraint zone. 8. A device for determination of a real subsoil geological formation, comprising: an input interface of a computer configured to receive a model representing the real subsoil geological formation; a computer circuit configured to determine a first stochastic trajectory of a first fluvial formation in said model; a computer circuit configured to define a constraint zone comprising said first fluvial formation; a computer circuit configured to determine a second stochastic trajectory of a second fluvial formation in said model within said constraint zone based on a stochastic process, and to reiterate the defining the constraint zone and the determining the second stochastic trajectory of the second fluvial formation, and in said reiteration, the second fluvial formation is taken as the first fluvial formation and a third stochastic trajectory of a third fluvial formation is taken as the second stochastic trajectory of the second fluvial formation; and a computer circuit configured to output a complete model to a computing device, the complete model providing data indicating at least the first, second, and third fluvial formations as real subsoil geological formations, which is usable to identify a hydrocarbon reservoir based on the first, second, and third fluvial formations and enable an industrial production plan for production of hydrocarbons based on the complete model. 9. A non-transitory computer readable storage medium, having stored thereon a computer program comprising program instructions, the computer program being loadable into a data-processing device and adapted to cause the data-processing device perform a method for determination of a real subsoil geological formation when the computer program is run by the data-processing device, the method comprising: receiving a model representing the real subsoil geological formation; determining a first stochastic trajectory of a first fluvial formation in said model; defining a constraint zone comprising said first fluvial formation; determining a second stochastic trajectory of a second fluvial formation in said model within said constraint zone based on a stochastic process; reiterating the defining the constraint zone and the determining the second stochastic trajectory of the second fluvial formation, and in said reiteration, the second fluvial formation is taken as the first fluvial formation and a third stochastic trajectory of a third fluvial formation is taken as the second stochastic trajectory of the second fluvial formation; and output a complete model to a computing device, the complete model providing data indicating at least the first, second, and third fluvial formations as real subsoil geological formations, which is usable to identify a hydrocarbon reservoir based on the first, second, and third fluvial formations and enable an industrial production plan for production of hydrocarbons based on the complete model. 10. The non-transitory computer readable storage medium of claim 9 , wherein edges of the constraint zone are within a predetermined distance to the first stochastic trajectory of the first fluvial formation. 11. The non-transitory computer readable storage medium of claim 9 , wherein the determining the second stochastic trajectory of the second fluvial formation is reiterated a predetermined number of times. 12. The non-transitory computer readable storage medium of claim 10 , wherein the determining the second stochastic trajectory of the second fluvial formation comprises a displacement of the constraint zone according to a given direction between iterations. 13. The non-transitory computer readable storage medium of claim 9 , wherein determining the second stochastic trajectory comprises: determining a point of the model based on the stochastic process; and if said point is outside the constraint zone, reiterating the determining a point of the model based on the stochastic process, otherwise, adding said point to the second stochastic trajectory, wherein if the reiteration of the determining a point of the model based on the stochastic process exceeds a predetermined number, the determining of the second stochastic trajectory is reinitialized. 14. The non-transitory computer readable storage medium of claim 9 , wherein determining the second stochastic trajectory comprises: determining a point of the second stochastic trajectory; and if said point is outside the constraint zone, changing coordinates of said point to a closest point of the constraint zone.

Assignees

Inventors

Classifications

  • Model from sedimentation process modeling, e.g. from first principles · CPC title

  • G06F30/20Primary

    Design optimisation, verification or simulation (optimisation, verification or simulation of circuit designs G06F30/30) · CPC title

  • G01V20/00Primary

    Geomodelling in general · CPC title

  • Constraint-based CAD · CPC title

  • Probabilistic or stochastic CAD · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US11995382B2 cover?
The present disclosure relates to a method for determination of a real subsoil geological formation. In at least one embodiment, the method includes receiving a model representing the real subsoil, determining a first stochastic trajectory of a first fluvial formation in said model, defining a constraint zone comprising said first fluvial formation, and determining a second stochastic trajector…
Who is the assignee on this patent?
Total Se, Totalenergies Onetech
What technology area does this patent fall under?
Primary CPC classification G06F30/20. Mapped technology areas include Physics.
When was this patent published?
Publication date Tue May 28 2024 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 1 related publication on this page (citations in our corpus or others sharing the same primary CPC).