Distributed remote logging

US11965416B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-11965416-B2
Application numberUS-202117397803-A
CountryUS
Kind codeB2
Filing dateAug 9, 2021
Priority dateMay 19, 2017
Publication dateApr 23, 2024
Grant dateApr 23, 2024

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

Methods, systems, and apparatuses for remote well operation control. Methods include conducting, with a plurality of remote well operation control hosts operating on corresponding remote well logging data acquisition management systems, a well operation using a well operation system at a well, wherein the well operation system includes a carrier having disposed thereon at least one logging instrument. Methods may include establishing a first operational control relationship between the carrier and a first of the plurality of remote well operation control hosts sufficient for the first remote well operation control host to control the carrier; and establishing a second operational control relationship between a selected one of the at least one logging instrument and a second remote well operation control host different than the first, the operational control relationship sufficient for the second remote well operation control host to control the at least one logging instrument and receive logging data.

First claim

Opening claim text (preview).

What is claimed is: 1. A method of conducting well operations, the method comprising: allocating control of an operational resource located at a well, the control of the operational resource sufficient for conducting at least a portion of the well operations, comprising: maintaining a database associating a plurality of remote well operational control hosts with corresponding roles, wherein at least some roles of the corresponding roles are associated with privileges to corresponding operational resources; and allocating control of an operational resource to a first remote well operational control host of the plurality in dependence upon the role associated with the first remote well operational control host; modifying at least a pre-existing role associated with the first remote well operational control host to the role; and modifying at least the role, associated with a second remote well operational control host, to another role. 2. The method of claim 1 , further comprising determining an operational state of the operational resource; and wherein allocating control of the operational resource to the first remote well operational control host comprises allocating control of the operational resource to the first remote well operational control host in dependence upon the role associated with the first remote well operational control host and the operational state of the operational resource. 3. The method of claim 1 , further comprising determining an operational state of the well; wherein allocating control of the operational resource to the first remote well operational control host comprises allocating control of the operational resource to the first remote well operational control host in dependence upon the role associated with the first remote well operational control host and the operational state of the well. 4. The method of claim 1 , further comprising allocating control of the operational resource to a local well operation control host while in a default operational state. 5. The method of claim 1 , wherein the allocating comprises an initial allocation of the role. 6. The method of claim 1 , wherein the allocating includes a role modification comprising: identifying the first remote well operational control host as being associated with the role modification; associating the first remote well operational control host with the role. 7. The method of claim 1 , wherein the allocating includes a role modification, comprising: identifying the second remote well operational control host as being associated with the role modification; associating the second remote well operational control host with the another role. 8. The method of claim 7 , wherein the another role is associated with a credentials profile, and the second remote well operational control host has associated therewith credentials, and identifying the second remote well operational control host comprises: generating a comparison of the credentials against the credentials profile; and selecting the second remote well operational control host in dependence upon the comparison and at least one selection rule. 9. The method of claim 1 , wherein the allocating includes a role modification comprising triggering the role modification in response to detecting a role shift event. 10. The method of claim 1 , wherein at least some roles of the corresponding roles are associated with constraints. 11. The method of claim 1 , wherein the operational resource comprises at least one of: i) a logging instrument; ii) a carrier; and iii) bandwidth on a Wide Area Network (WAN) configured to transmit logging data from the well to a receiving node. 12. The method of claim 11 , wherein the receiving node comprises at least one of: i) an instrument control station; ii) a well operation control host; iii) a data processing system remote from the well; iv) a display station remote from the well; and v) a data archiving system remote from the well. 13. The method of claim 1 , wherein allocating control of the operational resource comprises establishing an operational control relationship sufficient to enable use of the operational resource to perform at least one of: i) geosteering; ii) drilling at least one borehole in a formation; iii) performing measurements on a formation; iv) estimating parameters of a formation; v) installing equipment in a borehole; vi) evaluating a formation; vii) performing maritime logging operations of a seabed. 14. A method of conducting well logging operations, the method comprising: allocating control of an operational resource located at a well, the control of the operational resource sufficient for conducting at least a portion of the well logging operations, comprising: maintaining a database associating a plurality of remote well operational control hosts with corresponding roles, wherein at least some roles of the corresponding roles are associated with privileges to corresponding operational resources; and allocating control of an operational resource to a first remote well operational control host of the plurality in dependence upon the role associated with the remote well operational control host, wherein the allocating includes a role modification comprising: modifying at least a pre-existing role associated with the first remote well operational control host to the role; and modifying at least the role, associated with a second remote well operational control host, to another role. 15. The method of claim 14 , wherein the well logging operations include at least one of geosteering, performing measurements on a formation, estimating parameters of a formation, evaluating a formation, and performing maritime logging operations of a seabed. 16. The method of claim 14 , further comprising: determining an operational state of the operational resource; and wherein allocating control of the operational resource to the first remote well operational control host comprises allocating control of the operational resource to the first remote well operational control host in dependence upon the role associated with the first remote well operational control host and the operational state of the operational resource. 17. The method of claim 14 , further comprising: determining an operational state of the well; wherein allocating control of the operational resource to the first remote well operational control host comprises allocating control of the operational resource to the first remote well operational control host in dependence upon the role associated with the first remote well operational control host and the operational state of the well. 18. The method of claim 14 , further comprising a role modification, comprising: identifying the second remote well operational control host as being associated with the role modification; associating the second remote well operational control host with the role. 19. The method of claim 18 , wherein the role is associated with a credentials profile, and the second remote well operational control host has associated therewith credentials, and identifying the second remote well operational control host comprises: generating a comparison of the credentials against the credentials profile; and selecting the second remote well operational control host in dependence upon the comparison and at least one selection rule.

Assignees

Inventors

Classifications

  • E21B47/13Primary

    by electromagnetic energy, e.g. radio frequency · CPC title

  • Storing data down-hole, e.g. in a memory or on a record carrier · CPC title

  • specially adapted for well-logging · CPC title

  • E21B47/12Primary

    Means for transmitting measuring-signals or control signals from the well to the surface, or from the surface to the well, e.g. for logging while drilling · CPC title

  • Survey of boreholes or wells (monitoring pressure or flow of drilling fluid E21B21/08) · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US11965416B2 cover?
Methods, systems, and apparatuses for remote well operation control. Methods include conducting, with a plurality of remote well operation control hosts operating on corresponding remote well logging data acquisition management systems, a well operation using a well operation system at a well, wherein the well operation system includes a carrier having disposed thereon at least one logging inst…
Who is the assignee on this patent?
Baker Hughes, Baker Hughes A Ge Co Llc
What technology area does this patent fall under?
Primary CPC classification E21B47/13. Mapped technology areas include Fixed Constructions.
When was this patent published?
Publication date Tue Apr 23 2024 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 9 related publications on this page (citations in our corpus or others sharing the same primary CPC).