Server and power management method

US11929612B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-11929612-B2
Application numberUS-202117519709-A
CountryUS
Kind codeB2
Filing dateNov 5, 2021
Priority dateDec 23, 2020
Publication dateMar 12, 2024
Grant dateMar 12, 2024

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A first switching unit switches a first power grid from an isolated operation to a grid-connected operation. In switching the first power grid from the isolated operation to the grid-connected operation, the first switching unit determines a master and a slave among a plurality of power adjustment resources and allows the first power grid to be connected to the second power grid after master-slave control by means of the master and the slave such that electric power of the first power grid is in synchronization with electric power of the second power grid. The first switching unit preferentially selects as the master, a power adjustment resource close to a point of connection between the first power grid and the second power grid from among the plurality of power adjustment resources.

First claim

Opening claim text (preview).

What is claimed is: 1. A server that manages electric power of a first power grid, the first power grid being configured to be connected to and disconnected from a second power grid, the server being configured to: manage a plurality of power adjustment resources electrically connectable to the first power grid; and switch the first power grid from an isolated operation to a grid-connected operation, the first power grid being interconnected with the second power grid in the grid-connected operation, the server being configured to, in switching the first power grid from the isolated operation to the grid-connected operation, determine a master among master candidates including the plurality of power adjustment resources based on a first parameter, the first parameter including a distance from a grid-connection point to the power adjustment resource, the grid-connection point being a point of connection between the first power grid and the second power grid, designate as slaves, all of the master candidates not selected as the master, and allow the first power grid to be connected to the second power grid after master-slave control by means of the master and the slaves such that electric power of the first power grid is in synchronization with electric power of the second power grid, the server being configured to, in switching the first power grid from the grid-connected operation to the isolated operation, determine a master among master candidates including the plurality of power adjustment resources based on a second parameter different from the first parameter, the second parameter including capacity of the power adjustment resource, designate as slaves, all of the master candidates not selected as the master, and allow the first power grid to be disconnected from the second power grid after selection of the master and the slaves, and the server being configured to control the master and the slaves to stabilize electric power of the first power grid during the isolated operation of the first power grid. 2. The server according to claim 1 , wherein the first parameter further includes communication performance and output performance of the power adjustment resource, and the server is configured to exclude a first power adjustment resource and a second power adjustment resource from power adjustment resources that are responsive to a synchronization command, the first power adjustment resource having a communication rate lower than a first threshold value, the second power adjustment resource having maximum output power lower than a second threshold value, and select as the master, one power adjustment resource closest to the point of connection from among remaining power adjustment resources after the exclusion. 3. The server according to claim 1 , wherein the plurality of power adjustment resources include an electrically powered vehicle. 4. The server according to claim 3 , wherein the plurality of power adjustment resources further include a stationary power storage, and the server is configured to request, when the electrically powered vehicle is designated as the master, a user of at least one power adjustment resource included in the plurality of power adjustment resources to reduce demand of the first power grid before the master-slave control. 5. The server according to claim 3 , wherein the electrically powered vehicle is a fuel cell electric vehicle. 6. The server according to claim 1 , wherein the server is configured to determine timing to switch the first power grid from the isolated operation to the grid-connected operation based on balancing capability of the first power grid during the isolated operation of the first power grid. 7. The server according to claim 1 , wherein the first power grid is a microgrid, the second power grid is a commercial power grid provided by an electric utility, each of the plurality of power adjustment resources includes a power conversion circuit, and in the master-slave control, the master electrically connected to the first power grid carries out voltage control by means of the power conversion circuit and the slave electrically connected to the first power grid carries out current control by means of the power conversion circuit. 8. The server according to claim 1 , wherein the server is configured to, in switching the first power grid from the isolated operation to the grid-connected operation, carries out the master-slave control by sending the synchronization command to each of the master and the slave, and in the master-slave control, the master is operated constant voltage constant frequency control, and each of the slaves is operated for current control in accordance with the frequency and the voltage determined by the master. 9. The server according to claim 8 , wherein the server is configured to, in switching the first power grid from the isolated operation to the grid-connected operation, carry out the master-slave control to decrease a first difference and a second difference, the first difference being a phase difference between electric power of the first power grid and electric power of the second power grid, the second difference being an amplitude difference between electric power of the first power grid and electric power of the second power grid, determine whether synchronization under the master-slave control has been completed based on the first difference and the second difference, and allow the first power grid to be connected to the second power grid when synchronization under the master-slave control has been completed. 10. The server according to claim 1 , wherein the server is configured to have a reserve distributed energy resource (DER) operate under current control such that electric power of the first power grid is in synchronization with electric power of the second power grid during the grid-connected operation of the first power grid and the second power grid, the reserve DER being a stationary DER always connected to the first power grid. 11. The server according to claim 10 , wherein the reserve DER includes at least one of an energy storage system (ESS), a fuel cell system (FCS), and a power generator, the ESS being a stationary power storage configured to be chargeable from and dischargeable to the first power grid, the FCS including a stationary fuel cell that generates electric power by chemical reaction between hydrogen and oxygen, the power generator being a stationary generator that generates electric power by using fossil fuel. 12. The server according to claim 1 , wherein the server is configured to determine whether a trouble has occurred in the second power grid during the grid-connected operation of the first power grid and the second power grid, and switch the first power grid from the grid-connected operation to the isolated operation when the trouble has occurred in the second power grid. 13. The server according to claim 1 , wherein the server is configured to, in switching the first power grid from the isolated operation to the grid-connected operation, determine as the master, the power adjustment resource closest to the grid-connection point among master candidates. 14. The server according to claim 1 , wherein the server is configured to, in switching the first power grid from the grid-connected operation to the isolated operation, determine as the master, the power adjustment resource highest in capacity among master candidates. 15. A method of managing electric power of a first power grid, the method comprising: switching the first power grid from a

Assignees

Inventors

Classifications

  • H02J3/46Primary

    Controlling the sharing of generated power between the generators, sources or networks · CPC title

  • using wireless data transmission · CPC title

  • Hybrid power plants, i.e. a plurality of different generation technologies being operated at one power plant · CPC title

  • Local stationary networks having a local or delimited stationary reach · CPC title

  • Electricity · mapped topic

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US11929612B2 cover?
A first switching unit switches a first power grid from an isolated operation to a grid-connected operation. In switching the first power grid from the isolated operation to the grid-connected operation, the first switching unit determines a master and a slave among a plurality of power adjustment resources and allows the first power grid to be connected to the second power grid after master-sl…
Who is the assignee on this patent?
Toyota Motor Co Ltd
What technology area does this patent fall under?
Primary CPC classification H02J3/46. Mapped technology areas include Electricity.
When was this patent published?
Publication date Tue Mar 12 2024 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 2 related publications on this page (citations in our corpus or others sharing the same primary CPC).