User equipment and network node for configuring measurements of cells and beams in a wireless communication system

US11864008B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-11864008-B2
Application numberUS-202217939006-A
CountryUS
Kind codeB2
Filing dateSep 7, 2022
Priority dateNov 17, 2017
Publication dateJan 2, 2024
Grant dateJan 2, 2024

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

Configuration of measurement requirements on cells and beams in NR is made more efficient by, in a user equipment, UE, receiving, information from a network node, which information indicates: a first number K of beams to be measured by the UE, and a second number L of cells in which the UE is required to measure the first number K of beams. The UE then carries out measurements using the received information; and performs at least one operational task based on a result of the measurements.

First claim

Opening claim text (preview).

The invention claimed is: 1. A method implemented in a user equipment, UE, the method comprising: receiving, from a network node, information indicating: a first number (K) of beams to be measured by the UE, and a second number (L) of cells in which the UE is required to measure the first number (K) of beams; carrying out measurements using the received information; and performing at least one operational task based on a result of the measurements, wherein the first number (K) specifies: a total number of beams to be measured in all the second number (L) of cells, wherein the method further comprising: transmitting a message to the network node, which message reflects a capability of the UE to carry out measurements in agreement with the received information, and which message is transmitted before the UE receives the information from the network node. 2. The method according to claim 1 , wherein performing at least one operational task based on a result of the measurements comprises reporting cell measurement results to the network node. 3. The method according to claim 1 , wherein the first number (K) of beams and the second number (L) of cells are associated with a respective frequency range. 4. The method according to claim 1 , comprising receiving, from a network node, information indicating: a first number (K) of beams to be measured by the UE, and a second number (L) of cells in which the UE is required to measure the first number (K) of beams out of at least two possible sets of K number of beams and L number of cells. 5. The method according to claim 4 , wherein the possible sets of K number of beams and L number of cells are associated with different frequency ranges. 6. The method according to claim 1 , wherein the information is received from the network in RRC (Radio Resource Control) signaling. 7. A user equipment, UE, configured to communicate with a network node, the UE comprising a radio interface and processing circuitry configured to: receive, from the network node, information indicating: a first number (K) of beams to be measured by the UE, and a second number (L) of cells in which the UE is required to measure the first number (K) of beams; carry out measurements using the received information; and perform at least one operational task based on a result of the measurements, wherein the first number (K) specifies: a total number of beams to be measured in all the second number (L) of cells, wherein the radio interface and the processing circuitry are further configured to: transmit a message to the network node, which message reflects a capability of the UE to carry out measurements in agreement with the received information, and which message is transmitted before the UE receives the information from the network node. 8. A method implemented in a network node, the method comprising: transmitting information to the UE, which information indicates a first number (K) of beams to be measured by a user equipment, UE, and a second number (L) of cells in which the UE shall measure the first number (K) of beams, wherein the first number (K) specifies: a total number of beams to be measured in all the second number (L) of cells, wherein the method further comprising: receiving a message from the UE, which message reflects a capability of the UE to carry out measurements in agreement with the transmitted information, and which message is received before transmitting the information to the UE. 9. The method according to claim 8 , further comprising: receiving from the UE results of measurements performed by the UE based on K and L. 10. A network node configured to communicate with a user equipment, UE, the network node comprising a radio interface and processing circuitry configured to: transmit information to the UE, which information indicates a first number (K) of beams to be measured by the UE and a second number (L) of cells in which the UE shall measure the first number (K) of beams, wherein the first number (K) specifies: a total number of beams to be measured in all the second number (L) of cells, wherein the radio interface and processing circuitry are further configured to: receive a message from the UE, which message reflects a capability of the UE to carry out measurements in agreement with the transmitted information, and which message is received before transmitting the information to the UE. 11. A computer program comprising computer code which, when run on processing circuitry of a user equipment, UE, causes the UE to be configured to: receive, from a network node, information indicating: a first number (K) of beams to be measured by the UE, and a second number (L) of cells in which the UE is required to measure the first number (K) of beams; carry out measurements using the received information; and perform at least one operational task based on a result of the measurements, wherein the first number (K) specifies: a total number of beams to be measured in all the second number (L) of cells, wherein the UE is further configured to: transmit a message to the network node, which message reflects a capability of the UE to carry out measurements in agreement with the received information, and which message is transmitted before the UE receives the information from the network node. 12. The computer program according to claim 11 , wherein the computer program is stored on a computer-readable storage medium. 13. A computer program comprising computer code which, when run on processing circuitry of a network node, causes the network node to be configured to: transmit information to the UE, which information indicates a first number (K) of beams to be measured by a user equipment, UE and a second number (L) of cells in which the UE shall measure the first number (K) of beams, wherein the first number (K) specifies: a total number of beams to be measured in all the second number (L) of cells, wherein the network node is further configured to: receive a message from the UE, which message reflects a capability of the UE to carry out measurements in agreement with the transmitted information, and which message is received before transmitting the information to the UE. 14. The computer program according to claim 13 , wherein the computer program is stored on a computer-readable storage medium.

Assignees

Inventors

Classifications

  • Selecting one or more beams from a plurality of beams, e.g. beam training, management or sweeping · CPC title

  • H04W24/02Primary

    Arrangements for optimising operational condition · CPC title

  • Transfer of terminal data · CPC title

  • using beam steering · CPC title

  • Scheduling measurement reports {; Arrangements for measurement reports} · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US11864008B2 cover?
Configuration of measurement requirements on cells and beams in NR is made more efficient by, in a user equipment, UE, receiving, information from a network node, which information indicates: a first number K of beams to be measured by the UE, and a second number L of cells in which the UE is required to measure the first number K of beams. The UE then carries out measurements using the receive…
Who is the assignee on this patent?
Ericsson Telefon Ab L M
What technology area does this patent fall under?
Primary CPC classification H04B7/06952. Mapped technology areas include Electricity.
When was this patent published?
Publication date Tue Jan 02 2024 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 12 related publications on this page (citations in our corpus or others sharing the same primary CPC).