Complex decommissioning method for nuclear facility

US11830634B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-11830634-B2
Application numberUS-202017437073-A
CountryUS
Kind codeB2
Filing dateMar 5, 2020
Priority dateMar 8, 2019
Publication dateNov 28, 2023
Grant dateNov 28, 2023

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A method for complex-decommissioning a nuclear facility is disclosed. The method for complex-decommissioning the nuclear facility includes: cutting and expanding an inner wall of the cavity; installing a cutting device that cuts and decommissions the nuclear reactor pressure vessel inside the cavity; fixing the nuclear reactor pressure vessel inside the cavity by using a fixture; and cutting and decommissioning the nuclear reactor pressure vessel fixed inside the cavity by using a cutting device.

First claim

Opening claim text (preview).

The invention claimed is: 1. A method for complex-decommissioning a nuclear facility that includes a nuclear reactor pressure vessel and bio-protective concrete including a cavity in which the nuclear reactor pressure vessel is positioned, comprising: cutting and expanding an inner wall of the cavity; installing a cutting device that cuts and decommissions the nuclear reactor pressure vessel inside the cavity; fixing the nuclear reactor pressure vessel inside the cavity by using a fixture; and cutting and decommissioning the nuclear reactor pressure vessel fixed inside the cavity by using a cutting device. 2. The method for complex-decommissioning the nuclear facility of claim 1 , wherein the cutting device includes: a first rail installed in a vertical direction of an inner wall surface of the cavity; a second rail installed in a round shape in a circumferential direction of the cavity, and raised and lowered inside the cavity along the first rail; a driver providing an elevating driving force to the second rail; and a cutter movably installed along the second rail to cut and decommission the nuclear reactor pressure vessel. 3. The method for complex-decommissioning the nuclear facility of claim 2 , wherein the driver includes: a rack gear installed in the first rail; a pinion gear installed in the second rail and engaged with the rack gear; and a driving motor providing a driving force to the pinion gear. 4. The method for complex-decommissioning the nuclear facility of claim 2 , wherein the second rail is respectively installed at an upper position and a lower position of the first rail, and is installed to be able to be raised and lowered along the first rail. 5. The method for complex-decommissioning the nuclear facility of claim 1 , wherein the fixture is provided with one end supported in contact with the inner wall surface of the cavity and the other end supported in contact with a surface of the nuclear reactor pressure vessel, and includes a variable rod of which length is varied. 6. The method for complex-decommissioning the nuclear facility of claim 5 , wherein the variable rod includes: a first rod provided with one end supported in contact with the inner wall surface of the cavity; a second rod provided with one end supported in contact with the surface of the nuclear reactor pressure vessel; and a rotating rod that is provided with one side screwed to the first rod and the other side screwed to the second rod and that makes the first rod and the second rod closer to each other or separates them from each other. 7. The method for complex-decommissioning the nuclear facility of claim 1 , wherein the nuclear facility further includes a crane positioned on the bio-protective concrete to support the nuclear reactor pressure vessel in the cavity.

Assignees

Inventors

Classifications

  • G21D1/003Primary

    Nuclear facilities decommissioning arrangements (decontamination arrangements, treating radioactively contaminated material G21F9/00) · CPC title

  • cutting on both the forward and the return stroke · CPC title

  • for making circular cuts · CPC title

  • B28D1/088Primary

    Sawing in situ, e.g. stones from rocks, grooves in walls · CPC title

  • Sawing grooves in walls; sawing stones from rocks; sawing machines movable on the stones to be cut · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US11830634B2 cover?
A method for complex-decommissioning a nuclear facility is disclosed. The method for complex-decommissioning the nuclear facility includes: cutting and expanding an inner wall of the cavity; installing a cutting device that cuts and decommissions the nuclear reactor pressure vessel inside the cavity; fixing the nuclear reactor pressure vessel inside the cavity by using a fixture; and cutting an…
Who is the assignee on this patent?
Korea Hydro & Nuclear Power Co
What technology area does this patent fall under?
Primary CPC classification G21D1/003. Mapped technology areas include Physics.
When was this patent published?
Publication date Tue Nov 28 2023 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 8 related publications on this page (citations in our corpus or others sharing the same primary CPC).