Information processing system, information processing method, and non-transitory computer readable medium storing program
US-2019152340-A1 · May 23, 2019 · US
US11761776B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-11761776-B2 |
| Application number | US-202117386943-A |
| Country | US |
| Kind code | B2 |
| Filing date | Jul 28, 2021 |
| Priority date | Aug 21, 2020 |
| Publication date | Sep 19, 2023 |
| Grant date | Sep 19, 2023 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
Charging scheduling systems and methods for electric buses for use in at least one electric bus and a cloud management module are provided. First, a current location of the electric bus is obtained by a positioning unit of the electric bus and a current power state of a battery module of the electric bus is detected by a battery detection unit of the electric bus. A route corresponding to the electric bus is obtained by the cloud management module, wherein the route includes at least one charging point, and records a location of the charging point and a charging efficiency of at least one charging equipment installed at the charging point. Then, the cloud management module determines whether the electric bus needs to be charged with the charging equipment at the charging point according to the current location and the current power state of the electric bus.
Opening claim text (preview).
What is claimed is: 1. A charging scheduling system for electric buses, comprising: at least one electric bus having a driving monitoring system, comprising: a positioning unit for communicating with at least one satellite to obtain a current location of the electric bus; a battery detection unit for detecting a current power state of a battery module of the electric bus; a network connection unit; and a processing unit for transmitting the current location and the current power state of the electric bus via the network connection unit; and a cloud management module, comprising: a storage unit for recording a route corresponding to the electric bus, wherein the route has at least one charging point, and records a location of the charging point and a charging efficiency of at least one charging equipment installed at the charging point; a network connection unit for receiving the current location and the current power state of the electric bus via a network; and a processor for determining whether the electric bus needs to be charged with the charging equipment at the charging point according to the current location and the current power state of the electric bus, wherein the at least one electric bus includes a first electric bus and a second electric bus, and the processor further obtains a first current location and a first current power state of the first electric bus, obtains a second current location and a second current power state of the second electric bus, and determines whether the first electric bus and/or the second electric bus need(s) to be charged with the charging equipment at the charging point according to the first current location and the first current power state of the first electric bus and the second current location and the second current power state of the second electric bus. 2. The system of claim 1 , wherein the processor further calculates a remaining power state of the electric bus when it arrives the charging point according to the current location and the current power state of the electric bus, and determines whether the electric bus needs to be charged with the charging equipment at the charging point according to the remaining power state. 3. The system of claim 1 , wherein the route has a first charging point and a second charging point, and the distance between the electric bus and the first charging point is less than the distance between the electric bus and the second charging point, the processor instructs the electric bus to perform a charging operation at the first charging point when the processor determined that the electric bus cannot reach the second charging point based on the current location and the current power state of the electric bus. 4. The system of claim 3 , wherein the processor instructs one of the first electric bus and the second electric bus with a smaller amount of electricity to perform the charging operation at the first charging point when the processor determines that both the first electric bus and the second electric bus can reach the second charging point. 5. The system of claim 3 , wherein the processor further calculates a charging period, wherein the electric bus can at least travel to the second charging point after the electric bus is charged using the charging equipment with the charging efficiency for the charging period. 6. The system of claim 5 , wherein the processor further transmits the information of the first charging point or the charging period of the charging operation at the first charging point to the electric bus through the network connection unit of the cloud management module. 7. The system of claim 3 , wherein the processor instructs the first electric bus to perform the charging operation at the first charging point for a first charging period when the processor determined that neither the first electric bus nor the second electric bus can reach the second charging point, and the distance between the first electric bus and the first charging point is less than the distance between the second electric bus and the first charging point, wherein the first electric bus can at least travel to the second charging point after the first electric bus is charged by the charging equipment with the charging efficiency for the first charging period. 8. The system of claim 7 , wherein the processor further calculates an estimated arrival time when the second electric bus arrives the first charging point, and instructs the first electric bus to end the charging operation before the estimated arrival time, wherein the first electric bus has already been charged for the first charging period before the estimated arrival time. 9. The system of claim 8 , wherein the processor further obtains a traffic state of the route, calculates the estimated arrival time when the second electric bus arrives the first charging point according to the traffic state, accordingly estimates the first charging period for the first electric bus, and calculates a remaining power state of the second electric bus when it arrives the first charging point, and a second charging period for the second electric bus. 10. A charging scheduling method for electric buses for in at least one electric bus and a cloud management module, wherein the at least one electric bus includes a first electric bus and a second electric bus, the method comprising: obtaining a first current location of the first electric bus by a positioning unit of the first electric bus and obtaining a second current location of the second electric bus by a positioning unit of the second electric bus; detecting a first current power state of a battery module of the first electric bus by a battery detection unit of the first electric bus and detecting a second current power state of a battery module of the second electric bus by a battery detection unit of the second electric bus; obtaining a route corresponding to the first and second electric buses by the cloud management module, wherein the route includes at least one charging point, and records a location of the charging point and a charging efficiency of at least one charging equipment installed at the charging point; and determining, by the cloud management module, whether the first electric bus and/or the second electric bus need(s) to be charged with the charging equipment at the charging point according to the first current location and the first current power state of the first electric bus and the second current location and the second current power state of the second electric bus.
Fuel consumption; Energy use; Emission aspects · CPC title
Buses · CPC title
Vehicle position · CPC title
Charging station selection relying on external data · CPC title
responding to state of charge [SoC] · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.