Adhesive barrier design to ensure proper paste flow during blade close process

US11745449B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-11745449-B2
Application numberUS-201916660258-A
CountryUS
Kind codeB2
Filing dateOct 22, 2019
Priority dateOct 22, 2018
Publication dateSep 5, 2023
Grant dateSep 5, 2023

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

Devices, systems, and methods of improving paste flow during the manufacture of wind turbine blades are provided. When the first turbine blade half is aligned with the second turbine blade half, a gap is formed between the first shell and the bond cap. The assembly includes a first mold half corresponding to the first turbine blade half and a second mold half corresponding to the second turbine blade half. When the first mold is aligned with the second mold, a second gap is formed. A first barrier is disposed within the first gap and a second barrier disposed within the second gap thereby fluidly sealing a volume defined by the first gap and the second gap to direct adhesive paste flow along the blade span between the adjoining leading and trailing edges.

First claim

Opening claim text (preview).

What is claimed is: 1. An assembly comprising: a first turbine blade half comprising a first shell defining a first perimeter and a first interface surface extending along the first perimeter; a second turbine blade half comprising a second shell defining a second perimeter and a second interface surface extending along the second perimeter, the second blade half comprising a bond cap extending from the perimeter where, when the first interface surface is aligned with the second interface surface, a first gap is formed between the first shell and the bond cap; a first mold half comprising a first mold surface corresponding to the first shell; a second mold half comprising a first mold surface corresponding to the second shell where, when the first mold half is aligned with the second mold half, a second gap is formed between the first mold half and the second mold half, wherein the first gap is in fluid communication with the second gap; a first barrier disposed within the first gap; and a second barrier disposed within the second gap thereby fluidly sealing a volume defined by the first gap and the second gap, the second barrier including a vent operable to selectively open or close; wherein the vent is formed by at least a portion of one of the first mold half or the second mold half, and at least a portion of the second barrier; wherein upon closure of the first mold half and the second mold half, a paste exits the vent. 2. The assembly of claim 1 , further comprising the paste is disposed on the first interface surface and/or the second interface surface. 3. The assembly of claim 1 , wherein the width of the first gap is between about 2 mm and 15 mm. 4. The assembly of claim 1 , wherein the width of the second gap is between about 2 mm and 15 mm. 5. The assembly of claim 1 , wherein the vent is one of a plurality of vents on the second barrier. 6. The assembly of claim 5 , wherein the plurality of vents are spaced at a predetermined distance from one another. 7. The assembly of claim 1 , wherein a plurality of first and second barriers are uniformly spaced along a leading and trailing edge of the first blade half and the second blade half. 8. The assembly of claim 1 , wherein the first barrier is permanently attached to at least one of the first turbine blade half and the second turbine blade half. 9. The assembly of claim 1 , wherein the second barrier is removably attached to at least one of the first mold half and the second mold half. 10. The assembly of claim 1 , wherein the vent on the second barrier is cylindrically shaped. 11. The assembly of claim 1 , wherein the vent on the second barrier is asymmetrically shaped. 12. The assembly of claim 1 , wherein the vent on the second barrier includes an inspection window to visually confirm the applied paste is free of voids.

Assignees

Inventors

Classifications

  • Wind turbines with rotation axis in wind direction · CPC title

  • B29C70/742Primary

    Forming a hollow body around the preformed part · CPC title

  • for producing articles of definite length, i.e. discrete articles · CPC title

  • Preformed parts characterised by their structure, e.g. form · CPC title

  • by moulding material on a relative small portion of the preformed parts · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US11745449B2 cover?
Devices, systems, and methods of improving paste flow during the manufacture of wind turbine blades are provided. When the first turbine blade half is aligned with the second turbine blade half, a gap is formed between the first shell and the bond cap. The assembly includes a first mold half corresponding to the first turbine blade half and a second mold half corresponding to the second turbine…
Who is the assignee on this patent?
Tpi Composites Inc
What technology area does this patent fall under?
Primary CPC classification B29C70/742. Mapped technology areas include Operations & Transport.
When was this patent published?
Publication date Tue Sep 05 2023 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 2 related publications on this page (citations in our corpus or others sharing the same primary CPC).