Load Leveling Hanger
US-2020326029-A1 · Oct 15, 2020 · US
US11654989B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-11654989-B2 |
| Application number | US-201916381830-A |
| Country | US |
| Kind code | B2 |
| Filing date | Apr 11, 2019 |
| Priority date | Apr 11, 2019 |
| Publication date | May 23, 2023 |
| Grant date | May 23, 2023 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
A load-leveling hanging apparatus and a system for suspended lifting of objects are disclosed. The load-leveling hanging apparatus includes a carriage suspended from a line; a hanging beam adapted for attachment of multiple objects at points along the beam; a mechanism for moving the hanging beam relative to the carriage to thereby achieve a level condition; and a level indicator. The mechanism is a rotatable screw. The system includes the load-leveling hanging apparatus and a lifting device. The lifting device includes a drum for winding and unwinding a line; a motor coupled to the drum to apply a torque thereto; a guide to direct the line onto the drum; and a controller. The lifting device raises and lowers the suspended hanging apparatus.
Opening claim text (preview).
What is claimed is: 1. A load-leveling bicycle hanging and lifting system comprising: an overhead mounting system for mounting inside a structure; a line having a first end and a second end, wherein the line is attached at the first end to the overhead mounting system; a lifting device attached to the overhead mounting system and comprising: a drum for winding and unwinding the line, wherein the line is attached at the second end to the drum; a motor coupled to the drum to apply a torque thereto; a guide to direct the line onto the drum; and a controller; a carriage with a first pulley and a second pulley, wherein the line passes downward from the drum, around the first pulley, around the second pulley and upward to the overhead mounting system; a hanging beam suspended from the carriage and configured for attaching at least two bicycles positioned substantially perpendicular thereto; a threaded mechanism mounted between the carriage and the hanging beam, wherein the threaded mechanism comprises a screw and a nut; wherein, when the at least two bicycles are attached to the hanging beam in an arrangement that causes the hanging beam to tilt, relative rotation between the screw and the nut is adapted to cause movement of the hanging beam relative to the carriage to thereby achieve a level condition of the hanging beam, thereby enabling the hanging beam to lift and store the at least two bicycles in the level condition; wherein the first end of the line and the lifting device are adapted to removably attach at multiple points along the overhead mounting system. 2. The load-leveling bicycle hanging and lifting system of claim 1 , further comprising a level indicator. 3. The load-leveling bicycle hanging and lifting system of claim 2 , wherein the screw traverses substantially an entire length of the hanging beam. 4. The load-leveling bicycle hanging and lifting system of claim 1 , further comprising a first plurality of hooks on a front side of the hanging beam and a second plurality of hooks on a back side of the hanging beam. 5. The load-leveling bicycle hanging and lifting system of claim 4 , further comprising straps. 6. The load-leveling bicycle hanging and lifting system of claim 5 , wherein the load-leveling bicycle hanging and lifting system is adapted to enable the straps to attach the at least two bicycles to the hanging beam. 7. The load-leveling bicycle hanging and lifting system of claim 6 , wherein the hanging beam is adapted to store the at least two bicycles in the level condition by moving relative to the carriage to account for any placement of the at least two bicycles on the hanging beam that causes the hanging beam to tilt. 8. The load-leveling bicycle hanging and lifting system of claim 7 , wherein the hanging beam is adapted to store the at least two bicycles in a tilted condition. 9. The load-leveling bicycle hanging and lifting system of claim 1 , further comprising a hand crank attached to the threaded mechanism. 10. The load-leveling bicycle hanging and lifting system of claim 1 , wherein the controller is configured to communicate with and receive commands from a smart phone. 11. The load-leveling bicycle hanging and lifting system of claim 1 , wherein the hanging beam is configured to hold and lift three bicycles. 12. A load-leveling bicycle hanging and lifting system comprising: an overhead mounting system for mounting inside a structure; a line having a first end and a second end, wherein the line is attached at the first end to the overhead mounting system; a lifting device attached to the overhead mounting system and comprising: a drum for winding and unwinding the line, wherein the line is attached at the second end to the drum; a motor coupled to the drum to apply a torque thereto; a guide to direct the line onto the drum; and a controller; a carriage with a first pulley and a second pulley, wherein the line passes downward from the drum, around the first pulley, around the second pulley and upward to the overhead mounting system; a hanging beam suspended from the carriage and configured for attaching at least two bicycles positioned substantially perpendicular thereto; a threaded mechanism mounted between the carriage and the hanging beam, wherein the threaded mechanism comprises a screw and a nut; wherein, when the at least two bicycles are attached to the hanging beam in an arrangement that causes the hanging beam to tilt, relative rotation between the screw and the nut is adapted to cause movement of the hanging beam relative to the carriage to thereby achieve a level condition of the hanging beam; wherein the first end of the line and the lifting device are adapted to removably attach to the overhead mounting system and the overhead mounting system is adapted to enable the first end of the line and the lifting device to be positioned at multiple points along the overhead mounting system. 13. The load-leveling bicycle hanging and lifting system of claim 12 , further comprising a level indicator. 14. The load-leveling bicycle hanging and lifting system of claim 13 , wherein the level indicator is an accelerometer. 15. The load-leveling bicycle hanging and lifting system of claim 12 , further comprising a first plurality of hooks on a front side of the hanging beam and a second plurality of hooks on a back side of the hanging beam. 16. The load-leveling bicycle hanging and lifting system of claim 15 , wherein each hook is stamped and bent from the front side of the hanging beam or the back side of the hanging beam; wherein a portion of each hook remains connected to the front side of the hanging beam or the back side of the hanging beam, and each hook is bent to a substantially perpendicular position relative to the front side of the hanging beam or the back side of the hanging beam. 17. A load-leveling hanging and lifting system comprising: an overhead mounting system for mounting inside a structure; a line having a first end and a second end, wherein the line is attached at the first end to the overhead mounting system; a lifting device attached to the overhead mounting system and comprising: a drum for winding and unwinding the line, wherein the line is attached at the second end to the drum; a motor coupled to the drum to apply a torque thereto; a guide to direct the line onto the drum; and a controller; a carriage with a first pulley and a second pulley, wherein the line passes around the first pulley and around the second pulley; a hanging beam suspended from the carriage and configured for attaching multiple objects thereto; a threaded mechanism mounted between the carriage and the hanging beam, wherein the threaded mechanism comprises a screw and a nut; a leveling motor attached to the threaded mechanism; a leveling controller; a level indicator; wherein relative rotation between the screw and the nut is adapted to cause movement of the hanging beam relative to the carriage to thereby achieve a level condition of the hanging beam; wherein the level indicator is an accelerometer; wherein the lifting device will not raise the hanging beam until the accelerometer determines that the hanging beam is in the level condition. 18. The load-leveling hanging and lifting system of claim 17 , wherein both the controller of the lifting device and the leveling controller are adapted to communicate with and receive commands from a smart phone. 19. The load-leveling hanging and lifting system of claim 17 , wherein the leveling motor starts upon a command
Related publications grouped by family.
Answers are generated from the same data shown on this page.