Method and system for mitigating cable wear in a hoisting system

US11639639B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-11639639-B2
Application numberUS-201916972569-A
CountryUS
Kind codeB2
Filing dateJun 6, 2019
Priority dateJun 6, 2018
Publication dateMay 2, 2023
Grant dateMay 2, 2023

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A method for mitigating the effects of cable wear in an active heave compensated hoisting system of an offshore vessel in a locked to bottom mode of operation is disclosed. The method comprises supporting an upper end of a string which is connected to a subsea well from a travelling block of the hoisting system, wherein the travelling block is suspended from a crown block via a cable. The method further comprises operating an active heave compensation system to control a drawworks of the hoisting system to pay in and out the cable to compensate for motion of the offshore vessel and maintain a target overpull in the string. The method further comprises adjusting a ballast system of the offshore vessel to vary the draft of the vessel, and controlling the drawworks in accordance with the variation in the draft of the vessel to cause a length of cable to slip through the hoisting system and maintain the target overpull in the string.

First claim

Opening claim text (preview).

The invention claimed is: 1. A method for mitigating the effects of cable wear in an active heave compensated hoisting system of an offshore vessel in a locked to bottom mode of operation, the method comprising: connecting an upper end of a string which is connected to a subsea well to a travelling block of the hoisting system, wherein the travelling block is suspended from a crown block via a cable; applying a target overpull in the string; operating an active heave compensation system to control a drawworks of the hoisting system to pay in and out the cable to compensate for motion of the offshore vessel and maintain the target overpull in the string; adjusting a ballast system of the offshore vessel to vary the draft of the vessel while operating the heave compensation system to compensate for motion of the offshore vessel; and controlling the drawworks in accordance with the variation in the draft of the vessel to cause a length of cable to slip through the hoisting system and maintain the target overpull in the string. 2. The method according to claim 1 , comprising adjusting the ballast to cause a length of cable to move through the hoisting system without disconnecting the string from the travelling block. 3. The method according to claim 1 , comprising determining a requirement to slip the cable through the heave compensated hoisting system prior to adjusting the ballast system. 4. The method according to claim 3 , comprising determining a condition of the cable and adjusting the ballast system of the vessel in accordance with the determined cable condition. 5. The method according to claim 4 , comprising determining the condition of the cable based on measured parameters including at least one of applied load, elongation, strain and physical inspection. 6. The method according to claim 4 , comprising determining the condition of the cable analytically including at least one of software tools, numerical analysis, modelling and computational simulation; wherein the analytical determination includes using physical parameters including at least one of historic use, loading, cable travel, relative movement between the travelling block and the crown block, historic use of the heave compensation system, ton-miles utilization of the cable, and geometry of the hoisting system. 7. The method according to claim 6 , comprising determining a required adjustment of the ballast system in accordance with the predetermined length of cable to be slipped through the hoisting system. 8. The method according to claim 1 , comprising performing offshore operations associated with the subsea well prior to the vessel entering the locked to bottom mode. 9. The method according to claim 1 , comprising slipping the cable through the hoisting system prior to the vessel entering the locked to bottom mode to replenish the cable within the hoisting system. 10. The method according to claim 1 , comprising performing a slip-and-cut operation prior to the vessel entering the locked to bottom mode.

Assignees

Inventors

Classifications

  • Block and tackle system with variable number of cable parts · CPC title

  • E21B19/09Primary

    specially adapted for drilling underwater formations from a floating support using heave compensators supporting the drill string · CPC title

  • Winding units, specially adapted for drilling operations · CPC title

  • including heave compensators · CPC title

  • including counterweight or means to compensate for list, trim, or skew of the vessel or platform (counterweights or supports for balancing lifting couples B66C23/72; equipment to decrease unwanted vessel movements B63B39/00) · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US11639639B2 cover?
A method for mitigating the effects of cable wear in an active heave compensated hoisting system of an offshore vessel in a locked to bottom mode of operation is disclosed. The method comprises supporting an upper end of a string which is connected to a subsea well from a travelling block of the hoisting system, wherein the travelling block is suspended from a crown block via a cable. The metho…
Who is the assignee on this patent?
Maersk Drilling As, Noble Drilling As
What technology area does this patent fall under?
Primary CPC classification E21B19/09. Mapped technology areas include Fixed Constructions.
When was this patent published?
Publication date Tue May 02 2023 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 1 related publication on this page (citations in our corpus or others sharing the same primary CPC).