Storage system and purge method in storage system

US11608229B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-11608229-B2
Application numberUS-201816642084-A
CountryUS
Kind codeB2
Filing dateJul 19, 2018
Priority dateSep 8, 2017
Publication dateMar 21, 2023
Grant dateMar 21, 2023

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A storage system includes shelves each with a nozzle to supply clean gas into containers, flow amount controllers to control a supply amount of clean gas to a nozzle, a transport apparatus to transfer the containers to and from the shelves, and a controller to control the transport apparatus and the flow amount controllers. The controller makes an assignment of at least one shelf in preparation to store an incoming container and before the occurrence of the incoming container, and controls a flow amount controlling device to supply clean gas to the nozzle in the at least one shelf, based upon the assignment.

First claim

Opening claim text (preview).

What is claimed is: 1. A storage system comprising: a plurality of shelves each including at least one nozzle to supply clean gas into containers; a plurality of flow amount controllers to respectively control a supply amount of the clean gas to the at least one nozzle; at least one transport apparatus to transfer the containers to and from the shelves; and a controller to control the at least one transport apparatus and the flow amount controllers; wherein the controller is programmed to: unload an incoming container on a shelf of the plurality of shelves; make an assignment of at least one shelf in preparation to store a next incoming container immediately after the unloading of the incoming container is completed and before the occurrence of the next incoming container into the storage system; control one of the flow amount controllers to supply the clean gas to the at least one nozzle in the at least one shelf, based upon the assignment; and start the supply of the clean gas to the at least one nozzle at a time when the assignment is made and before the occurrence of the next incoming container into the storage system. 2. The storage system according to claim 1 , wherein the storage system is a purge stocker and includes an entrance and dispatch port; the at least one transport apparatus transports the containers between the entrance and dispatch port and the shelves; and the controller is further configured or programmed to make the assignment of the at least one shelf in advance, before the next incoming container arrives at the entrance and dispatch port. 3. The storage system according to claim 1 , wherein the controller is further programmed to control the one of the flow amount controllers to intermittently supply the clean gas to the at least one nozzle in the at least one shelf. 4. The storage system according to claim 1 , wherein the at least one transport apparatus is provided with a transfer device entering into and unloading the next incoming container on the shelves; and the controller is further programmed to control the one of the flow amount controllers to supply a larger flow amount of the clean gas to the at least one nozzle, from when the transfer device starts advancement towards the at least one shelf and until completing unloading of the next incoming container, than an amount before the transfer device starts advancement. 5. A purge method in a storage system including a plurality of shelves each including at least one nozzle to supply clean gas into containers, a plurality of flow amount controllers to control a supply amount of the clean gas to the at least one nozzle, at least one transport apparatus to transfer the containers to and from the shelves, and a controller to control the at least one transport apparatus and the flow amount controllers, the method comprising: unloading an incoming container on a shelf of the plurality of shelves; making an assignment of at least one shelf in preparation to store a next incoming container immediately after the unloading of the incoming container is completed and before the occurrence of the next incoming container into the storage system, by the controller; supplying the clean gas to the at least one nozzle in the at least one shelf, based upon the assignment; and starting the supply of the clean gas to the at least one nozzle at a time when the assignment is made and before the occurrence of the next incoming container into the storage system. 6. The purge method according to claim 5 , wherein the at least one transport apparatus is provided with a transfer device entering into and unloading the next incoming container on the shelves, the method further comprising: controlling one of the flow amount controllers to supply a larger flow amount of the clean gas to the at least one nozzle, from when the transfer device starts advancement towards the at least one shelf and until completing unloading of the next incoming container, than an amount before the transfer device starts advancement. 7. The purge method according to claim 6 , further comprising: after the supplying the clean gas to the at least one nozzle, supplying the clean gas to a bottom portion of the next incoming container; and after the supplying the clean gas to the bottom portion of the incoming container, supplying the clean gas to an inside of the next incoming container. 8. The storage system according to claim 4 , wherein the controller is further programmed to: control the one of the flow amount controllers to supply the clean gas to a bottom portion of the next incoming container after the supply of the clean gas to the at least one nozzle; and control the one of the flow amount controllers to supply the clean gas to an inside of the next incoming container after the supply of the clean gas to the bottom portion of the next incoming container.

Assignees

Inventors

Classifications

  • Storage means · CPC title

  • Overhead conveying · CPC title

  • Conveying cassettes, containers or carriers · CPC title

  • characterised by the presence of atmosphere modifying elements inside or attached to the closed carrier · CPC title

  • for conveying, e.g. between different workstations · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US11608229B2 cover?
A storage system includes shelves each with a nozzle to supply clean gas into containers, flow amount controllers to control a supply amount of clean gas to a nozzle, a transport apparatus to transfer the containers to and from the shelves, and a controller to control the transport apparatus and the flow amount controllers. The controller makes an assignment of at least one shelf in preparation…
Who is the assignee on this patent?
Murata Machinery Ltd
What technology area does this patent fall under?
Primary CPC classification H10P72/3404. Mapped technology areas include Electricity.
When was this patent published?
Publication date Tue Mar 21 2023 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 4 related publications on this page (citations in our corpus or others sharing the same primary CPC).