Method for installing a tubular metal pile in rocky soil

US11603639B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-11603639-B2
Application numberUS-201917263654-A
CountryUS
Kind codeB2
Filing dateMar 12, 2019
Priority dateJul 30, 2018
Publication dateMar 14, 2023
Grant dateMar 14, 2023

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

The invention concerns a method for installing a tubular metal pile ( 28 ) in a rocky ground, successively comprising drilling the rocky ground ( 6 ) in order to form a cavity ( 14 ) of predetermined diameter and depth, filling the cavity with a granular material ( 18 ), arranging the granular material present in the cavity by vibration, and installing the pile in the cavity.

First claim

Opening claim text (preview).

The invention claimed is: 1. A method for installing a tubular metal pile in the ground, successively comprising: drilling the ground in order to form a cavity of predetermined diameter and depth, wherein the diameter and depth of the cavity are respectively greater than a diameter and final depth of burial of the pile; mounting an annular guide at an upper end of the cavity, wherein the annular guide stabilizes the upper end of the cavity; filling a first portion of the cavity with a first granular material; arranging the first granular material present in the cavity by vibration; then filling a second portion of the cavity with a second granular material; arranging the second granular material present in the cavity by vibration; and then installing the pile in the cavity. 2. The method according to claim 1 , wherein the pile is installed at sea in a seabed. 3. The method according to claim 1 , wherein the pile is installed onshore in the ground. 4. The method according to claim 1 , wherein the arrangement of the first and second granular materials in the cavity is achieved during the installation of the pile. 5. The method according to claim 1 , wherein the arrangement of the first and second granular materials in the cavity is achieved prior to the installation of the pile. 6. The method according to claim 5 , wherein the arrangement of the first and second granular materials in the cavity is achieved by vibro-compaction. 7. The method according to claim 5 , wherein the arrangement of the first and second granular materials in the cavity is achieved by dynamic compaction. 8. The method according to claim 1 , wherein the pile is installed by vibro-sinking into the cavity filled with the first and second granular materials. 9. The method according to claim 1 , wherein the pile is installed by driving into the cavity filled with the first and second granular materials. 10. The method according to claim 1 , wherein installing the pile in the cavity successively comprises vertically inserting the pile through the annular guide and placing the pile in the cavity. 11. The method according to claim 1 , wherein the first granular material comes from the material obtained from the drilling of the ground. 12. The method according to claim 1 , wherein the step of arranging the first and second granular materials present in the cavity by vibration rearranges the first and second granular materials in order of density. 13. The method according to claim 1 , wherein the first granular material is sand. 14. The method according to claim 1 , wherein the second granular material is gravel.

Assignees

Inventors

Classifications

  • E02D27/425Primary

    specially adapted for wind motors masts (wind motors per se F03D1/00) · CPC title

  • Guide devices; Guide frames {(as parts of the driver scaffold E02D7/16)} · CPC title

  • tubular, e.g. prefabricated from sheet pile elements (sheet pile boxes E02D27/30; concrete piles with metal casings E02D5/30) · CPC title

  • Sinking workpieces into water or soil {inasmuch as not provided for elsewhere} · CPC title

  • Granulates · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US11603639B2 cover?
The invention concerns a method for installing a tubular metal pile ( 28 ) in a rocky ground, successively comprising drilling the rocky ground ( 6 ) in order to form a cavity ( 14 ) of predetermined diameter and depth, filling the cavity with a granular material ( 18 ), arranging the granular material present in the cavity by vibration, and installing the pile in the cavity.
Who is the assignee on this patent?
Saipem Sa
What technology area does this patent fall under?
Primary CPC classification E02D27/425. Mapped technology areas include Fixed Constructions.
When was this patent published?
Publication date Tue Mar 14 2023 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 8 related publications on this page (citations in our corpus or others sharing the same primary CPC).