Prioritization of power generating units of a power plant comprising one or more wind turbine generators

US11536251B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-11536251-B2
Application numberUS-201917416968-A
CountryUS
Kind codeB2
Filing dateDec 11, 2019
Priority dateDec 18, 2018
Publication dateDec 27, 2022
Grant dateDec 27, 2022

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

The invention relates to a method for determining power set points of a power plant comprising a plurality of power generating units with at least one wind turbine generator. The determination of the power set points are based on a prioritization of the power generating units, where the power generating units are prioritized with respect to individual power levels or fatigue levels obtained for the power generating units. The prioritization is adjusted so that the adjusted prioritization depends both on the power and fatigue levels.

First claim

Opening claim text (preview).

The invention claimed is: 1. A method for controlling power generation from a power plant comprising a plurality of power generating units including at least one wind turbine generator, where the power plant is connected to an electrical power grid for supplying power from the power generating units to the electrical power grid, and where the power generating units are controllable to produce, dependent on individual power set points, power, the method comprises: for each power generating unit of the plurality of power generating units: (i) obtaining a fatigue level indicative of a combined accumulated fatigue level of one or more mechanical components of the power generating unit; and (ii) obtaining a power level indicative of the maximum power that can be produced by the power generating unit or indicative of the power produced by the power generating unit; determining a prioritized list of the plurality of power generating units wherein the plurality of power generating units are prioritized based on either the fatigue levels of the plurality of power generating units or the power levels of the plurality of power generating units; based on the plurality of power generating units being prioritized based on the fatigue levels of the plurality of power generating units, determining a first difference between the power level of a first power generating unit in the prioritized list and the power level of a second power generating unit located at a lower priority in the prioritized list than the first power generating unit; based on the plurality of power generating units being prioritized based on the power levels of the plurality of power generating units, determining a second difference between the fatigue level of the first power generating unit and the fatigue level of the second power generating unit; changing an order of the first power generating unit and the second power generating unit in the prioritized list based on the first difference or the second difference to produce an adjusted prioritized list; and determining power set points for a portion of the plurality of power generating units based on the prioritization of the plurality of power generating units in the adjusted prioritized list. 2. The method of claim 1 , where obtaining the power level comprises obtaining an available power level indicative of the maximum power that can be produced by the power generating unit, or obtaining an actual power level indicative of the power currently produced by the power generating unit. 3. The method of claim 2 , where the power set points have been determined based on using the available power level for the determination of the prioritized list or for the changing of the order. 4. The method of claim 1 , wherein the order of the first and second power generating units is changed based on the fatigue level of the second power generating unit indicating a lower fatigue than the fatigue level for of first power generating unit, or the power level of the second power generating unit being higher than the power level of the first power generating unit. 5. The method of claim 1 , comprising determining the prioritized list or changing the order in response to a change of a power reference. 6. The method of claim 1 , comprising determining if the prioritization will be performed dependent on the fatigue levels or the power levels based on an operating time of the power generating units. 7. The method of claim 1 , wherein the fatigue level for each of the power generating units is obtained based on a weighted sum of component fatigue levels of one or more mechanical components of each power generating unit. 8. The method of claim 1 , wherein the fatigue level is determined as a fatigue margin based on differences between component fatigue levels of one or more components and predetermined design fatigue limits of the one or more components. 9. The method of claim 1 , wherein the fatigue level for each power generating unit is weighted dependent on a rate of change of fatigue levels determined for one or more components. 10. A central controller for controlling power production of a power plant which comprises a plurality of power generating units including at least one wind turbine generator, where the power plant is connected to an electrical power grid for supplying power from the power generating units to the electrical power grid, and where at the central controller is arranged to dispatch individual power set points to the power generating units, and where the central controller is arranged to perform an operation, comprising: for each power generating unit of the plurality of power generating units: (i) obtaining a fatigue level indicative of a combined accumulated fatigue level of one or more mechanical components of the power generating unit; and (ii) obtaining a power level indicative of the maximum power that can be produced by the power generating unit or indicative of the power produced by the power generating unit; determining a prioritized list of the plurality of power generating units wherein the plurality of power generating units are prioritized based on either the fatigue levels of the plurality of power generating units or the power levels of the plurality of power generating units; based on the plurality of power generating units being prioritized based on the fatigue levels of the plurality of power generating units, determining a first difference between the power level of a first power generating unit in the prioritized list and the power level of a second power generating unit located at a lower priority in the prioritized list than the first power generating unit; based on the plurality of power generating units being prioritized based on the power levels of the plurality of power generating units, determining a second difference between the fatigue level of the first power generating unit and the fatigue level of the second power generating unit; changing an order of the first power generating unit and the second power generating unit in the prioritized list based on the first difference or the second difference to produce an adjusted prioritized list; and determining power set points for a portion of the plurality of power generating units based on the prioritization of the plurality of power generating units in the adjusted prioritized list. 11. The method of claim 2 , wherein the power set points have been determined based on using the actual power level for the determination of the prioritized list or for the changing of the order. 12. A computer program product comprising software code adapted to control a plurality of power generating units of a power plant when executed on a data processing system, the computer program product being adapted to perform an operation, comprising: for each power generating unit of the plurality of power generating units including at least one wind turbine generator: (i) obtaining a fatigue level indicative of a combined accumulated fatigue level of one or more mechanical components of the power generating unit; and (ii) obtaining a power level indicative of the maximum power that can be produced by the power generating unit or indicative of the power produced by the power generating unit; determining a prioritized list of the plurality of power generating units wherein the plurality of power generating units are prioritized based on either the fatigue levels of the plurality of power generating units or the power levels of the plurality of power generating units; based on the plurality of power generating units being prioritized based on the fatigue levels of the plurality of power generating units, deter

Assignees

Inventors

Classifications

  • Maximum loads or fatigue criteria · CPC title

  • Wind turbines with rotation axis in wind direction · CPC title

  • Power (if explicitly mentioned) · CPC title

  • to prolong engine life · CPC title

  • F03D7/048Primary

    controlling wind farms · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US11536251B2 cover?
The invention relates to a method for determining power set points of a power plant comprising a plurality of power generating units with at least one wind turbine generator. The determination of the power set points are based on a prioritization of the power generating units, where the power generating units are prioritized with respect to individual power levels or fatigue levels obtained for…
Who is the assignee on this patent?
Vestas Wind Sys As
What technology area does this patent fall under?
Primary CPC classification F03D7/048. Mapped technology areas include Mechanical Engineering.
When was this patent published?
Publication date Tue Dec 27 2022 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 1 related publication on this page (citations in our corpus or others sharing the same primary CPC).