Method of optimizing operation one or more tubing strings in a hydrocarbon well, apparatus and system for same

US11525334B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-11525334-B2
Application numberUS-201916964619-A
CountryUS
Kind codeB2
Filing dateJan 30, 2019
Priority dateJan 30, 2018
Publication dateDec 13, 2022
Grant dateDec 13, 2022

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A method, system and apparatus of optimizing operation of one or more tubing strings in a hydrocarbon well are provided. Each tubing string is located in a hydrocarbon well and has a plurality of valves. Each valve is actuatable between a fully open position and a fully closed position and is in communication with a respective zone of a formation defining a reservoir containing hydrocarbon material. The method includes characterizing an injectivity of one or more zones of the formation and determining an optimal operating schedule in accordance with the characterization. The optimal operating schedule comprises one or more valve configurations and an operating duration for each of the one or more valve configurations.

First claim

Opening claim text (preview).

What is claimed is: 1. A method of optimizing operation of one or more tubing strings, each tubing string being located in a hydrocarbon well and having a plurality of valves therein, each valve being actuatable between a fully open position and a fully closed position, each valve being in communication with a respective zone of a formation defining a reservoir containing hydrocarbon material, the method comprising: for each injection string in the one or more tubing strings: (i) supplying an injection fluid through the injection string and characterizing an injectivity of one or more zones of the formation in accordance with sensed characteristics of the injection fluid; and (ii) determining an optimal operating schedule for the injection string in accordance with the characterization of the one or more zones of the formation and one or more performance objectives of the injection string, wherein the optimal operating schedule comprises one or more valve configurations and an operating duration for each of the one or more valve configurations, wherein each valve configuration is defined by a condition of the valves in which each valve in the plurality of valves is in either the fully open position or the fully closed position. 2. The method of claim 1 , further comprising: (iii) opening, closing, or opening and closing the valves to cause a condition of the valves to be set in accordance with the optimal operating schedule for the injection string. 3. The method of claim 2 , further comprising: (iv) injecting the injection fluid into the injection string in accordance with the optimal operating schedule for the injection string; (v) monitoring to detect one or more triggers for re-optimizing the optimal operating schedule for the injection string; and (vi) repeating steps (i) to (iii) in response to detection of at least one of the one or more triggers for re-optimizing the optimal operating schedule for the injection string. 4. The method of claim 1 , wherein the method is at least partially performed by a remote server in communication with a controller, wherein the controller is coupled to the valves and controls a valve condition of each of the valves, wherein characterizing the injectivity and determining the optimal operating schedule is performed by the server and causing the condition of the valves to be set in accordance with the optimal operating schedule is performed by the controller, and wherein the causing the condition of the valves to be set in accordance with the optimal operating schedule comprises sending an instruction to the controller to open and/or close the valves to set the condition of the valves in accordance with the optimal operating schedule. 5. The method of claim 1 , wherein the one or more performance objectives comprise one or more of evenly distributing the flow of the injection fluid through one or more valves in the plurality of valves, maximizing the flow of the injection fluid through one or more valves in the plurality of valves, maximizing an accumulated volume of injection fluid injected through one or more valves, maintaining a pressure of the injection fluid at surface at a desired value, minimizing changes in valve condition, isolating the flow of the injection fluid through one or more valves, distributing the flow of the injection fluid through one or more valves by predetermined differing amounts, and/or receiving the injection fluid through one or more valves in response to back pressure or under pressure from a surface pump. 6. The method of claim 1 , wherein characterizing the injectivity of one or more zones of the formation comprises: for each of a set of valve configurations: opening, closing, or opening and closing the valves to cause a condition of the valves to be set in accordance with the valve configuration; supplying the injection fluid to the formation through the injection string; sensing one or more characteristics of the injection fluid at a location of one or more valves corresponding to the one or more zones of the formation to be characterized; supplying the injection fluid to the formation through the injection string to be suspended; continuing to sense the one or more characteristics of the injection fluid after suspending the supply of injection fluid to the formation until a termination condition is detected; and characterizing the one or more zones of the formation in accordance with changes in the sensed one or more characteristics of the injection fluid over time. 7. The method of claim 6 , wherein the characterizing is based on an accumulated volume of the injection fluid determined from the one or more sensed characteristics of the injection fluid. 8. The method of claim 6 , wherein while characterizing the injectivity of the one or more zones of the formation only one valve is open at a time, wherein when one valve is open the other valves in the plurality of valves are closed. 9. The method of claim 6 , wherein characterizing the injectivity of the one or more zones of the formation is performed after the one or more zones of the formation are substantially charged with injection fluid. 10. The method of claim 6 , wherein characterizing the injectivity of one or more zones of the formation comprises: calculating a flow coefficient for each of the one or more zones of the formation in accordance with changes in a pressure or a flow rate of the injection fluid associated with the respective zone of the formation after suspending the supply of injection fluid to the formation through the injection string. 11. The method of claim 10 , wherein determining the optimal operating schedule comprises: calculating the flow rate for each of the one or more zones of the formation using the flow coefficient. 12. The method of claim 1 , wherein characterizing the injectivity of one or more zones of the formation comprises: for each valve in the injection string: opening the valve while other valves in the injection string are kept closed; supplying the injection fluid to the formation through the valve; sensing a pressure of the injection fluid; supplying the injection fluid to the formation through the injection string to be suspended; continuing to sense the pressure of the injection fluid after suspending the supply of injection fluid to the formation through the injection string until a termination condition is detected; and characterizing a zone of the formation in communication with the valve in accordance with changes in the sensed pressure of the injection fluid over time. 13. The method of claim 1 , wherein the method is performed for multiple tubing strings located in the formation, wherein each tubing string interacts with a common hydrocarbon reservoir well, wherein the method is performed for multiple tubing strings to jointly optimize the operation of the multiple tubing strings. 14. The method of claim 1 , further comprising: for each production string in the one or more tubing strings: (iii) characterizing a production flow of one or more zones of the formation in accordance with sensed characteristics of a production fluid; and (v) determining an optimal operating schedule for the production string in accordance with the characterization of the production flow and/or one or more zones of the formation and one or more performance objectives of the production string. 15. The method of claim 14 , further comprising: for each production string in the one or more tubing strings: (v) opening, closing, or opening and closing the valves to cause a condition of the valves of the production string to be set

Assignees

Inventors

Classifications

  • in wells · CPC title

  • Injecting fluid from longitudinally spaced locations in injection well · CPC title

  • responsive to flow or pressure of the fluid obtained (E21B34/10 takes precedence) · CPC title

  • E21B43/12Primary

    Methods or apparatus for controlling the flow of the obtained fluid to or in wells (E21B43/25 takes precedence; valve arrangements E21B34/00) · CPC title

  • Enhanced recovery methods for obtaining hydrocarbons · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US11525334B2 cover?
A method, system and apparatus of optimizing operation of one or more tubing strings in a hydrocarbon well are provided. Each tubing string is located in a hydrocarbon well and has a plurality of valves. Each valve is actuatable between a fully open position and a fully closed position and is in communication with a respective zone of a formation defining a reservoir containing hydrocarbon mate…
Who is the assignee on this patent?
Ncs Multistage Inc
What technology area does this patent fall under?
Primary CPC classification E21B43/12. Mapped technology areas include Fixed Constructions.
When was this patent published?
Publication date Tue Dec 13 2022 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 8 related publications on this page (citations in our corpus or others sharing the same primary CPC).