Automatic pilot valve system for foundation tooling
US-2024191452-A1 · Jun 13, 2024 · US
US11459724B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-11459724-B2 |
| Application number | US-201916759904-A |
| Country | US |
| Kind code | B2 |
| Filing date | Sep 10, 2019 |
| Priority date | Nov 12, 2018 |
| Publication date | Oct 4, 2022 |
| Grant date | Oct 4, 2022 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
The invention relates to a method for producing a sealing base in the ground in which by injection of a curable grouting compound a plurality of sealing elements is produced in a first soil layer, which elements adjoin one another or overlap, wherein the plurality of sealing elements forms a solid base plate following curing of the grouting compound. It is provided according to the invention that in a second soil layer, which lies beneath the first soil layer for the solid base plate, a gel base is created by injection of a sealing gel, and that the solid base plate and the underlying gel base form the sealing base. The invention further relates to a correspondingly produced sealing base.
Opening claim text (preview).
The invention claimed is: 1. Method for producing a sealing base in the ground, in which by injection of a curable grouting compound a plurality of sealing elements is produced in a first soil layer, which elements adjoin one another or overlap, wherein the plurality of sealing elements forms a solid base plate following curing of the grouting compound, characterized in that in a second soil layer, which lies beneath the first soil layer for the solid base plate, a gel base is created by injection of a sealing gel, the sealing gel being a flowable aqueous solution, the solid base plate and the underlying gel base form the sealing base, the solid base plate is anchored in underlying soil layers by an anchoring means, and the sealing gel is introduced into the second soil layer using one or more grouting lances. 2. Method according to claim 1 , characterized in that first the gel base and then the base plate is created. 3. Method according to claim 1 , characterized in that a suspension containing cement is used as a curable compound. 4. Method according to claim 3 , wherein the suspension containing cement is a cement-bentonite suspension. 5. Method according to claim 1 , characterized in that the curable grouting compound is injected by means of a grouting lance, which is introduced into the ground as far as the envisaged soil layer. 6. Method according to claim 1 , characterized in that the sealing gel contains silicate, water glass and/or silica sol as components. 7. Method according to claim 1 , wherein the sealing gel is injected into the second soil layer after the grouting compound is injected into the first soil layer. 8. Method according to claim 1 , characterized in that to form an excavation pit enclosure, an approximately vertical enclosure wall is created, at which the sealing base adjoins. 9. Excavation pit enclosure with an approximately vertical enclosure wall, characterized in that inside the enclosure wall there is formed a sealing base by the method according to claim 8 . 10. Sealing base in the ground, produced by the method according to claim 1 , wherein in a first soil layer a plurality of sealing elements made from a curable grouting compound is created, which elements adjoin one another or overlap and form a solid base plate thereby, characterized in that in a second soil layer, which lies beneath the first soil layer for the solid base plate, a gel base is created using a sealing gel, the sealing gel being a flowable aqueous solution, the solid base plate and the underlying gel base form the sealing base, the solid base plate is anchored in underlying soil layers by an anchoring means, and the sealing gel is introduced into the second soil layer using one or more grouting lances.
Consolidating by placing solidifying or pore-filling substances in the soil (making piles E02D5/46; soil-conditioning or soil-stabilising materials C09K17/00; consolidation of ground around boreholes or wells E21B43/025) · CPC title
making in situ by forcing bonding agents into gravel fillings or the soil (consolidating soil in general E02D3/12) · CPC title
against upward hydraulic pressure · CPC title
Anchored foundations · CPC title
by damming or interrupting the passage of underground water · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.