Turbine airfoil cooling system with leading edge impingement cooling system turbine blade investment casting using film hole protrusions for integral wall thickness control
US-10022790-B2 · Jul 17, 2018 · US
US11458530B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-11458530-B2 |
| Application number | US-202016786291-A |
| Country | US |
| Kind code | B2 |
| Filing date | Feb 10, 2020 |
| Priority date | Feb 10, 2020 |
| Publication date | Oct 4, 2022 |
| Grant date | Oct 4, 2022 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
An investment casting process for manufacturing a cast component is provided. The investment casting process includes forming a core, casting the cast component about the core such that a core positioning feature provides a location of an anticipated pilot hole in the cast component, removing the core from the cast component once the casting is completed, locating, forming and sizing a pilot hole to form a resized pilot hole that can receive a sealing plug and installing the sealing plug into the resized pilot hole.
Opening claim text (preview).
What is claimed is: 1. An investment casting process for manufacturing a cast component comprising: forming a core; casting the cast component about the core such that a core positioning feature provides a location of an anticipated pilot hole in the cast component; removing the core from the cast component once the casting is completed; locating, forming and sizing a pilot hole at the location of the anticipated pilot hole to form a resized pilot hole that can receive a sealing plug; installing the sealing plug into the resized pilot hole, whereby the sealing plug connects at least two opposing walls of an internal cavity; and further comprising creating a wax pattern of the cast component surrounding the core, wherein additional wax material is added at a location of the core positioning feature when creating the wax pattern. 2. The investment casting process according to claim 1 , wherein the core positioning feature is a bumper integral with the core. 3. The investment casting process according to claim 1 , wherein the core positioning feature comprises a pin. 4. The investment casting process according to claim 1 , wherein the sizing of the pilot hole removes surface contaminants within the pilot hole to create a suitable surface for receiving the sealing plug. 5. The investment casting process according to claim 1 , further comprising machining the cast component after installing the sealing plug. 6. The investment casting process according to claim 1 , wherein the installing of the sealing plug comprises brazing the sealing plug to the cast component. 7. The investment casting process according to claim 1 , wherein the sealing plug forms at least a portion of an internal feature. 8. An investment casting process for manufacturing a cast component comprising: forming a core comprising a main portion and bumpers integral with and extending outwardly from the main portion at a location to install a sealing plug relative to the cast component; casting the cast component about the core such that the bumpers provide locations of pilot holes; leaching the core from the cast component once the casting is completed such that an internal cavity is formed within the cast component; locating, forming and sizing pilot holes located at at least one of the locations of the pilot holes to form at least one resized pilot hole receptive of the sealing plug; and installing the sealing plug into the at least one resized pilot hole, wherein the casting comprises adding positive material around the bumpers. 9. The investment casting process according to claim 8 , further comprising machining the cast component after installing the sealing plug. 10. The investment casting process according to claim 8 , wherein the installing of the sealing plug into the at least one resized pilot hole comprises brazing the sealing plug to the cast component. 11. The investment casting process according to claim 8 , wherein the installing of the sealing plug forms at least a portion of an internal feature which is extendible across an internal cavity within the cast component.
Locating means for cores · CPC title
Installation of cores · CPC title
by leaching, washing or dissolving · CPC title
Tools; Devices not mentioned before for moulding · CPC title
Use of lost patterns · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.