Method for lowering oil pipe in gas well without well-killing, soluble bridge plug and material preparation method thereof

US11313192B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-11313192-B2
Application numberUS-201816607068-A
CountryUS
Kind codeB2
Filing dateApr 4, 2018
Priority dateNov 8, 2017
Publication dateApr 26, 2022
Grant dateApr 26, 2022

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

The present invention discloses a method for lowering an oil pipe in a gas well without well-killing, a soluble bridge plug and a material preparation method thereof, wherein, the method comprises the steps of: lowering a bridge plug in a wellbore such that the bridge plug blocks the wellbore at a predetermined location in the wellbore; injecting water in the wellbore after the pressure in the wellbore has been relieved so as to replace gases in the wellbore; and lowering an oil pipe in the wellbore to the location of the bridge plug. The method for lowering an oil pipe in a gas well without well-killing, the soluble bridge plug and the material preparation method thereof provided in the present invention successfully solve the problem of high cost for lowering an oil pipe under pressure after a fracturing fluid has been injected into the casing.

First claim

Opening claim text (preview).

The invention claimed is: 1. A method of lowering an oil pipe in a gas well without well-killing, wherein the method comprises the steps of: lowering a bridge plug in a wellbore such that the bridge plug blocks the wellbore at a predetermined location in the wellbore, wherein the bridge plug is a soluble bridge plug and the soluble bridge plug is made of an Mg—Al—Zn—Sn alloy material; injecting water in the wellbore after pressure in the wellbore has been relieved so as to replace gases in the wellbore; and lowering an oil pipe in the wellbore to the location of the bridge plug. 2. The method of lowering an oil pipe in a gas well without well-killing according to claim 1 , wherein the bridge plug is lowered to the predetermined location in the wellbore in an under-pressure condition by means of a cable, a setting mechanism connected to the cable is connected above the bridge plug, and the setting mechanism is controlled by the cable to push the bridge plug to block the wellbore. 3. The method of lowering an oil pipe in a gas well without well-killing according to claim 2 , wherein, when lowering the bridge plug, pressure is applied from outside the well into the wellbore to push the bridge plug to move until the bridge plug reaches the predetermined location, and the setting mechanism is controlled by the cable to push the bridge plug to block the wellbore after the pressure application from outside the well to the wellbore has been stopped. 4. The method of lowering an oil pipe in a gas well without well-killing according to claim 1 , wherein, water is injected into the wellbore to replace gases therein after pressure in the wellbore has been relieved to be balanced with atmospheric pressure. 5. The method of lowering an oil pipe in a gas well without well-killing according to claim 1 , wherein a depth position of the predetermined location is higher than a top end of a fracturing perforation section. 6. The method of lowering an oil pipe in a gas well without well-killing according to claim 1 , wherein the method further comprises: injecting a bridge plug dissolving solution through the oil pipe to dissolve the soluble bridge plug after the oil pipe has been lowered to the location of the bridge plug. 7. The method of lowering an oil pipe in a gas well without well-killing according to claim 6 , wherein the bridge plug dissolving solution is formed by one or a mixture of several of an acidic salt buffer solution, a glutamic acid-hydrochloric acid buffer solution, an acetic acid-sodium acetate buffer solution and a citric acid-sodium citrate buffer solution. 8. The method of lowering an oil pipe in a gas well without well-killing according to claim 7 , wherein the acidic salt buffer solution is a sodium bicarbonate solution, a potassium bicarbonate solution or a sodium bisulfate solution. 9. The method of lowering an oil pipe in a gas well without well-killing according to claim 8 , wherein the addition amount of acidic salt is 0.05-0.4 mol/L. 10. The method of lowering an oil pipe in a gas well without well-killing according to claim 7 , wherein the respective addition amount of glutamic acid-hydrochloric acid, acetic acid-sodium acetate and citric acid-sodium citrate is 0.1-0.3 mol/L.

Assignees

Inventors

Classifications

  • C22C1/03Primary

    using master alloys · CPC title

  • with means for anchoring against downward and upward movement (E21B33/1291, E21B33/1295 take precedence) · CPC title

  • Alloys based on aluminium · CPC title

  • with magnesium as the next major constituent · CPC title

  • Bridging plugs · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US11313192B2 cover?
The present invention discloses a method for lowering an oil pipe in a gas well without well-killing, a soluble bridge plug and a material preparation method thereof, wherein, the method comprises the steps of: lowering a bridge plug in a wellbore such that the bridge plug blocks the wellbore at a predetermined location in the wellbore; injecting water in the wellbore after the pressure in the …
Who is the assignee on this patent?
Petrochina Co Ltd
What technology area does this patent fall under?
Primary CPC classification C22C1/03. Mapped technology areas include Chemistry & Metallurgy.
When was this patent published?
Publication date Tue Apr 26 2022 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 2 related publications on this page (citations in our corpus or others sharing the same primary CPC).