Control system for construction machinery

US11313104B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-11313104-B2
Application numberUS-201917282075-A
CountryUS
Kind codeB2
Filing dateSep 27, 2019
Priority dateOct 1, 2018
Publication dateApr 26, 2022
Grant dateApr 26, 2022

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A control system for construction machinery includes a hydraulic cylinder operable by a working oil discharged from a hydraulic pump, a control valve arranged between the hydraulic pump and the hydraulic cylinder to control an operation of the hydraulic cylinder according to a position of a spool therein, the control valve having a first spool position for draining the working oil discharged from a chamber of the hydraulic cylinder to a drain tank, and a pressure compensated valve installed in a return hydraulic line through which the working oil discharged from the control valve at the first spool position is drained to the drain tank, the pressure compensated valve being configured to control a flow rate of the working oil passing through the pressure compensated valve according to a pressure difference between a front end and a rear end of the control valve.

First claim

Opening claim text (preview).

The invention claimed is: 1. A control system for construction machinery, comprising: a hydraulic cylinder operable by a working oil discharged from a hydraulic pump; a control valve arranged between the hydraulic pump and the hydraulic cylinder to control an operation of the hydraulic cylinder according to a position of a spool therein, the control valve having a first spool position for draining the working oil discharged from a chamber of the hydraulic cylinder to a drain tank; and a pressure compensated valve installed in a return hydraulic line through which the working oil discharged from the control valve at the first spool position is drained to the drain tank, the pressure compensated valve being configured to control a flow rate of the working oil passing through the pressure compensated valve according to a pressure difference between a front end and a rear end of the control valve, wherein an opening amount of the pressure compensated valve is controlled according to a pressure difference between a first pilot pressure supplied through a first pilot line branched off from a rod hydraulic line connected to the chamber and a second pilot pressure supplied through a second pilot line branched off from the return hydraulic line in front of the pressure compensated valve. 2. The control system for construction machinery of claim 1 , wherein the chamber is a rod side chamber of the hydraulic chamber cylinder. 3. The control system for construction machinery of claim 1 , wherein the hydraulic cylinder includes an arm cylinder. 4. The control system for construction machinery of claim 1 , wherein a valve body of the pressure compensated valve is formed in a valve body of the control valve or in another valve body separate from the valve body of the control valve. 5. The control system for construction machinery of claim 1 , wherein the pressure compensated valve includes a compensation spring that is connected to a compensation spool and is configured to compensate the pressure difference between the front end and the rear end of the control valve by a spring force. 6. The control system for construction machinery of claim 1 , wherein the working oil is drained to the drain tank through a return passage, a tank passage and a tank port that are selectively in communication with each other by a valve spool of the control valve, and the return passage, the tank passage and the tank port constitute at least a portion of the return hydraulic line, and wherein an inlet of the pressure compensated valve is in communication with the second pilot line that is in communication with the return passage and an outlet of the pressure compensated valve is in communication with the tank passage. 7. The control system for construction machinery of claim 1 , wherein an opening amount of the pressure compensated valve is configured to be controlled such that a difference between the first pilot pressure and the second pilot pressure becomes a constant value. 8. A control system for construction machinery, comprising: a hydraulic cylinder operable by a working oil discharged from a hydraulic pump; a control valve arranged between the hydraulic pump and the hydraulic cylinder to control an operation of the hydraulic cylinder according to a position of a spool therein, the control valve having a first spool position for draining the working oil discharged from a rod side chamber of the hydraulic cylinder to a drain tank; and a pressure compensated valve installed in a return hydraulic line through which the working oil discharged from the control valve at the first spool position is drained to the drain tank, the pressure compensated valve being configured to control a flow rate of the working oil passing through the pressure compensated valve according to a pressure difference between a front end and a rear end of the control valve, wherein an opening amount of the pressure compensated valve is controlled according to a pressure difference between a first pilot pressure supplied through a first pilot line branched off from a rod hydraulic line connected to the rod side chamber and a second pilot pressure supplied through a second pilot line branched off from the return hydraulic line in front of the pressure compensated valve, wherein the pressure compensated valve includes a compensation spring that is connected to a compensation spool and is configured to compensate the pressure difference between the front end and the rear end of the control valve by a spring force, wherein the working oil is drained to the drain tank through a return passage, a tank passage and a tank port that are selectively in communication with each other by a valve spool of the control valve, and the return passage, the tank passage and the tank port constitute at least a portion of the return hydraulic line, and wherein an inlet of the pressure compensated valve is in communication with a second pilot line that is in communication with the return passage and an outlet of the pressure compensated valve is in communication with the tank passage.

Assignees

Inventors

Classifications

  • Valves or distributors (position of valves arrangements on upper-structures E02F9/0875) · CPC title

  • F15B11/05Primary

    specially adapted to maintain constant speed, e.g. pressure-compensated, load-responsive {(F15B11/161 takes precedence)} · CPC title

  • E02F9/2225Primary

    using pressure-compensating valves · CPC title

  • Pressure compensating valves · CPC title

  • the pressure compensating valve is arranged between directional control valve and return line · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US11313104B2 cover?
A control system for construction machinery includes a hydraulic cylinder operable by a working oil discharged from a hydraulic pump, a control valve arranged between the hydraulic pump and the hydraulic cylinder to control an operation of the hydraulic cylinder according to a position of a spool therein, the control valve having a first spool position for draining the working oil discharged fr…
Who is the assignee on this patent?
Doosan Infracore Co Ltd
What technology area does this patent fall under?
Primary CPC classification F15B11/05. Mapped technology areas include Mechanical Engineering.
When was this patent published?
Publication date Tue Apr 26 2022 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 8 related publications on this page (citations in our corpus or others sharing the same primary CPC).