Method for covering and accessing mate lines during building construction

US11293190B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-11293190-B2
Application numberUS-202016993757-A
CountryUS
Kind codeB2
Filing dateAug 14, 2020
Priority dateSep 18, 2019
Publication dateApr 5, 2022
Grant dateApr 5, 2022

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A process for covering, protecting and providing access to mate lines during building construction comprising the steps of preparing a vertical and horizontal mate line closure flap, carrying out a vertical and horizontal mate line access process, carrying out a vertical and horizontal mate line closing process, repeating the vertical and horizontal mate line access and closing processes as required, and carrying out a vertical and horizontal mate line sealing process to complete the building weatherization.

First claim

Opening claim text (preview).

We claim: 1. A process for covering, protecting and providing access to mate lines during building construction comprises the steps of: preparing a vertical and horizontal mate line closure flap, carrying out a vertical and horizontal mate line access process, carrying out a vertical and horizontal mate line closing process, repeating the vertical and horizontal mate line access and closing processes as required, and carrying out a vertical and horizontal mate line sealing process to complete the building weatherization, wherein, preparation of the vertical mate line closure flap further comprises the steps of: providing a first building module having an external wall, the first module having a height H 1 , a width, a top edge, a bottom edge, a right vertical edge, a left vertical edge, wherein the external wall comprises sheathing having a synthetic vapor-permeable water-resistant barrier (WRB) sheet affixed to and covering the entire outer surface of the sheathing, the WRB sheet of the first module further extending a distance FV beyond either the right or left vertical edges of the first module to form a vertical flap, the flap having a longitudinal edge, wherein the distance FV exceeds the width (MV) of the vertical mate line to be covered by at least 152 mm, providing a second building module located in a horizontal direction to the side of the first module and having a vertical mate line between the two modules, the second module having an external wall wherein the external wall comprises sheathing having a synthetic WRB sheet affixed to and covering the entire outer surface of the sheathing, providing a vertical support member having a length LV, width, a first end, a second end, and a first face wherein length LV is no greater than the height H 1 of the first module, fully extending the vertical flap of the first module over onto the WRB sheet of the second module thereby covering the vertical mate line between the first and second modules and part of the WRB sheet of the second module, positioning the vertical support member underneath the extended WRB flap such that the first face of the vertical support member is flush with, or in close proximity to, the longitudinal edge of the flap, and the first end of the member does not extend beyond the top edge of the first module and the second end of the member does not extend beyond the bottom edge of the first module, attaching the WRB sheet covering the vertical support member to the support member with a first fastener, attaching the covered support member to the sheathing of the second module with a second fastener, preparation of the horizontal mate line closure flap further comprises the steps of: providing a first building module having an external wall, the first module having a height H 1 , a width W 1 , a top edge, a bottom edge, a right vertical edge, a left vertical edge, wherein the external wall comprises sheathing having a synthetic WRB sheet affixed to and covering the entire outer surface of the sheathing, the WRB sheet of the first module further extending a distance FH beyond the bottom edge of the first module to form a horizontal flap, the flap having a longitudinal edge, wherein the distance FH exceeds the width MH of the horizontal mate line to be covered by at least 50 mm, providing a third building module located in a vertical direction below the first module, the third module having an external wall wherein the external wall comprises sheathing having a synthetic WRB sheet affixed to and covering the entire outer surface of the sheathing, providing a horizontal support member having a length LH, width, a first end, a second end, and a first face wherein the length LH is no greater than the width W 1 of the first module, fully extending the horizontal flap of the first module over onto the WRB sheet of the third module thereby covering the horizontal mate line between the first and third modules and part of the WRB sheet of the third module, positioning the horizontal support member underneath the extended WRB flap such that the first end of the horizontal support member is flush with, or in close proximity to the longitudinal edge of the flap, and the first end of the support member does not extend beyond the right vertical edge of the first module and the second end of the support member does not extend beyond the left vertical edge of the first module, attaching the WRB sheet covering the horizontal support member to the support member with a first fastener, attaching the covered support member to the sheathing of the third module with a second fastener, accessing the vertical mate line comprises the steps of: removing the fastener securing the vertical support member to the sheathing of the second module, folding the vertical support member and WRB flap back over the mate line so as to overlap the sheathing of the first module by a distance sufficient to expose the mate line, and securing the support member to the sheathing of the first module by a third fastener, accessing the horizontal mate line comprises the steps of: removing the fastener securing the horizontal support member to the sheathing of the third module, folding the horizontal support member and WRB flap back over the mate line so as to overlap the sheathing of the first module by a distance sufficient to expose the mate line, and securing the covered support member to the sheathing of the first module by a third fastener, closing the vertical mate line comprises the steps of: removing the fastener securing the vertical support member to the first module, fully extending the vertical flap back over the mate line so as to cover it and attaching the support member to the sheathing of the second module with a second fastener, closing the horizontal mate line comprises the steps of: removing the fastener securing the horizontal support member to the first module, fully extending the vertical flap back over the mate line so as to cover it and attaching the support member to the sheathing of the third module with a second fastener, carrying out the horizontal mate line sealing process to complete the building weatherization comprises the steps of: removing the fastener used to secure the horizontal support member to the first or third module, cutting the WRB flap along its length close to the support member so as to free it from the support member, ensuring the WRB flap covers the mate line and fully extends onto the surface of the third module, and attaching the flap to the sheathing of the third module with a fourth fastener so as to seal all three edges of the flap, carrying out the vertical mate line sealing process to complete the building weatherization comprises the steps of: removing the fastener used to secure the vertical support member to the first or second module, cutting the WRB flap along its length close to the support member so as to free it from the support member, ensuring the WRB flap covers the mate line and fully extends onto the surface of the second module, and attaching the flap to the sheathing of the second module with a fourth fastener so as to seal all three edges of the flap. 2. The process of claim 1 wherein the WRB sheet comprises polyethylene or polypropylene. 3. The process of claim 1 wherein the vertical support member comprises wood, natural fiber, synthetic fiber, metal or plastic. 4. The process of claim 1 wherein the horizontal support member comprises wood, natural fiber, synthetic fiber, metal or plastic. 5. The process of claim 1 wherein the first fastener is screws, staples, nails, hook and loop or adhesive. 6. The process of claim 1 wherein the second fastener is screws, staples, nails, hook

Assignees

Inventors

Classifications

  • Wood fibres · CPC title

  • Glass fibres · CPC title

  • Sheets or foils allowing passage of water vapor but impervious to liquid water; house wraps · CPC title

  • E04F19/04Primary

    for use between floor or ceiling and wall, e.g. skirtings · CPC title

  • comprising polyolefins {(comprising vinyl (co)polymers or acrylic (co)polymers B32B27/30)} · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US11293190B2 cover?
A process for covering, protecting and providing access to mate lines during building construction comprising the steps of preparing a vertical and horizontal mate line closure flap, carrying out a vertical and horizontal mate line access process, carrying out a vertical and horizontal mate line closing process, repeating the vertical and horizontal mate line access and closing processes as req…
Who is the assignee on this patent?
Dupont Safety & Construction Inc
What technology area does this patent fall under?
Primary CPC classification E04F19/04. Mapped technology areas include Fixed Constructions.
When was this patent published?
Publication date Tue Apr 05 2022 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 2 related publications on this page (citations in our corpus or others sharing the same primary CPC).