Parking management system, parking management method, and non-transitory computer readable medium storing program causing computer to execute processing
US-2018350157-A1 · Dec 6, 2018 · US
US11288624B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-11288624-B2 |
| Application number | US-201816100146-A |
| Country | US |
| Kind code | B2 |
| Filing date | Aug 9, 2018 |
| Priority date | Aug 9, 2018 |
| Publication date | Mar 29, 2022 |
| Grant date | Mar 29, 2022 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
A method at a computing device for determining future utilization of a shipping yard, the method including detecting a number of assets within the shipping yard; determining, based on asset scheduling information, future yard activity; and correlating the number of assets within the shipping yard with the future yard activity to provide a predictive yard utilization.
Opening claim text (preview).
The invention claimed is: 1. A method at a computing device for determining future utilization of a shipping yard, the method comprising: detecting a number of assets within the shipping yard, the detecting utilizing at least one image capture device on at least one moving vehicle within the shipping yard to capture images of the shipping yard and further utilizes image processing of captured images of the shipping yard to find the number of assets within the shipping yard; determining, based on asset scheduling information, future yard activity; correlating the number of assets within the shipping yard with the future yard activity to provide a predictive yard utilization; and creating, based on the predictive yard utilization, an alert indicating a number of empty spots within the yard. 2. The method of claim 1 , wherein the detecting utilizes a sensor at ingress and egress points within the yard to find the number of assets within the shipping yard. 3. The method of claim 1 , wherein the asset scheduling information includes a buffer time period for an arrival or departure time for each asset. 4. The method of claim 1 , wherein the asset scheduling information is updated based on sensor information provided for at least one asset. 5. The method of claim 4 , wherein the sensor information includes a current position of the at least one asset, where the at least one asset is scheduled to arrive at the shipping yard. 6. The method of claim 4 , wherein the sensor information includes information from a third party regarding a status of the at least one asset. 7. The method of claim 1 , further comprising, after the correlating, creating an alert when the future yard activity creates a shipping yard utilization greater than a threshold percentage of a capacity of the shipping yard. 8. The method of claim 7 , wherein a plurality of alerts is provided, each being created at a different threshold percentage of the capacity of the shipping yard. 9. A computing device configured for determining future utilization of a shipping yard, the computing device comprising: a processor; and a communications subsystem; wherein the computing device is configured to: detect a number of assets within the shipping yard, the detecting utilizing at least one image capture device on at least one moving vehicle within the shipping yard to capture images of the shipping yard and further utilizes image processing of captured images of the shipping yard to find the number of assets within the shipping yard; determine, based on asset scheduling information, future yard activity; correlate the number of assets within the shipping yard with the future yard activity to provide a predictive yard utilization; and create, based on the predictive yard utilization, an alert indicating a number of empty spots within the yard. 10. The computing device of claim 9 , wherein the computing device is configured to detect using a sensor at ingress and egress points within the yard to find the number of assets within the shipping yard. 11. The computing device of claim 9 , wherein the asset scheduling information includes a buffer time period for an arrival or departure time for each asset. 12. The computing device of claim 9 , wherein the asset scheduling information is updated based on sensor information provided for at least one asset. 13. The computing device of claim 12 , wherein the sensor information includes a current position of the at least one asset, where the at least one asset is scheduled to arrive at the shipping yard. 14. The computing device of claim 12 , wherein the sensor information includes information from a third party regarding a status of the at least one asset. 15. The computing device of claim 9 , wherein the computing device is further configured to, after the correlating, create an alert when the future yard activity creates a shipping yard utilization greater than a threshold percentage of a capacity of the shipping yard. 16. The computing device of claim 15 , wherein a plurality of alerts is provided, each being created at a different threshold percentage of the capacity of the shipping yard. 17. A non-transitory computer readable medium for storing instruction code which, when executed by a processor of a computing device configured for determining future utilization of a shipping yard, cause the computing device to: detect a number of assets within the shipping yard, the detecting utilizing at least one image capture device on at least one moving vehicle within the shipping yard to capture images of the shipping yard and further utilizes image processing of captured images of the shipping yard to find the number of assets within the shipping yard; determining, based on asset scheduling information, future yard activity; correlate the number of assets within the shipping yard with the future yard activity to provide a predictive yard utilization; and create, based on the predictive yard utilization, an alert indicating a number of empty spots within the yard.
Optimisation of two dimensional placement, e.g. cutting of clothes or wood · CPC title
Terrestrial scenes (scenes under surveillance with static cameras G06V20/52; scenes perceived from the exterior of a vehicle G06V20/56; scenes perceived from the interior of a vehicle G06V20/59) · CPC title
Inventory or stock management, e.g. order filling, procurement or balancing against orders · CPC title
Shipping · CPC title
Physics · mapped topic
Related publications grouped by family.
Answers are generated from the same data shown on this page.