System and method for installing a blind fastener in a fastening site

US11273485B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-11273485-B2
Application numberUS-202117162307-A
CountryUS
Kind codeB2
Filing dateJan 29, 2021
Priority dateJan 29, 2020
Publication dateMar 15, 2022
Grant dateMar 15, 2022

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A device for inserting the blind fastener in the fastening site, a pulling and extracting device for swaging the blind fastener in the fastening site and a passive compliance device that binds the inserting device to the pulling and extracting device. The passive compliance device allows the installation of the bind fastener without sensors.

First claim

Opening claim text (preview).

The invention claimed is: 1. A system for installing a blind fastener in a fastening site, the fastening site comprising a first longitudinal axis, the blind fastener comprising a fastening shank and a mandrel, the fastening shank having a head and a shaft and being configured to be swaged in the fastening site, the mandrel being configured to deform the shaft of the fastening shank in order to swage the fastening shank in the fastening site, the mandrel being configured to be detached from the fastening shank by breaking after the swaging of the fastening shank, the blind fastener comprising a second longitudinal axis, the system comprising: an insertion device configured to insert the blind fastener into the fastening site, the insertion device comprising a jaw configured to hold the blind fastener via the mandrel; a pulling and extracting device configured to pull on the jaw of the insertion device to apply a pulling force to the mandrel to deform the shaft of the fastening shank to swage the fastening shank in the fastening site and extract the mandrel after the fastening shank has been swaged in the fastening site and the mandrel has broken; and a passive compliance device that binds the insertion device to the pulling and extracting device, the passive compliance device being configured to allow a passive alignment of the second longitudinal axis with the first longitudinal axis during an installation of the blind fastener in the fastening site. 2. The system as claimed in claim 1 , further comprising a movement device configured to move the insertion device and the pulling and extracting device towards the fastening site for the fastening shank to be installed in the fastening site before swaging and to move the insertion device and the pulling and extracting device away from the fastening site once the fastening shank has been swaged. 3. The system as claimed in claim 1 , wherein the passive compliance device corresponds to a remote center compliance device comprising a first plate fastened to the pulling and extracting device, a second plate fastened to the insertion device and compliance members between the first plate and the second plate. 4. The system as claimed in claim 3 , wherein the pulling and extracting device further comprises a mandrel container configured to receive the extracted mandrel. 5. The system as claimed in claim 4 , wherein the pulling and extracting device comprises a first tube and a pulling member, the first tube comprising a first end and a second end, the first end of the first tube being fastened to the pulling member, the first end of the first tube emerging in the mandrel container, the second end of the first tube being fastened to the jaw of the insertion device, the pulling member being configured to apply a predetermined pulling force to the jaw, the pulling force being transmitted to the jaw via the first tube, and the first tube comprising a flexible section between the first plate and the second plate of the remote center compliance device, the predetermined pulling force being suitable for pulling on the jaw to pull the mandrel to deform the shaft of the fastening shank which is held in the fastening site by a bearing wall of the insertion device to swage the fastening shank in the fastening site until the mandrel breaks after the swaging of the fastening shank, the pulling and extracting device comprising a second flexible tube, the second flexible tube at least partially surrounding the flexible section of the first tube between the first plate and the second plate, the second flexible tube comprising a first end and a second end, the first end of the second flexible tube being fastened to the first plate, the second end of the second flexible tube being fastened to the second plate, the first tube being capable of sliding freely in the second flexible tube without applying any force leading to a change in a configuration of the passive compliance device. 6. The system as claimed in claim 5 , wherein the predetermined pulling force is also suitable for providing the mandrel with potential energy, the potential energy provided by the pulling force being capable of being transformed into kinetic energy after the mandrel has broken, the kinetic energy being capable of dislodging the mandrel from the jaw and moving the mandrel through the first tube up to the mandrel container. 7. A method for installing a blind fastener in a fastening site implemented by the installation system as claimed in claim 1 , the installation method comprising the following steps: installing the blind fastener on the insertion device, the blind fastener being held by the jaw of the insertion device via the mandrel, moving the blind fastener towards the fastening site, comprising moving the insertion device and the pulling and extracting device towards the fastening site for the fastening shank to be installed in the fastening site prior to swaging; and wherein the method further comprises an alignment step implemented by the passive compliance device that binds the insertion device to the pulling and extracting device, the alignment step provided by the passive compliance device comprising installing the blind fastener in the fastening site such that the second longitudinal axis is aligned with the first longitudinal axis. 8. The method as claimed in claim 7 , further comprising: pulling the mandrel, implemented by the pulling and extracting device, comprising pulling on the jaw to pull on the mandrel to deform the shaft of the fastening shank to swage the fastening shank in the fastening site, and extracting the mandrel, implemented by the pulling and extracting device, comprising extracting the mandrel after the fastening shank has been swaged in the fastening site and the mandrel has broken, and receiving the extracted mandrel in a mandrel container. 9. The method as claimed in claim 8 , wherein the pulling and extracting device comprises a first tube and a pulling member, the first tube comprising a first end and a second end, the first end of the first tube being fastened to the pulling member, the first end of the first tube emerging in the mandrel container, the second end of the first tube being fastened to the jaw of the insertion device, the pulling member being configured to apply a predetermined pulling force to the jaw, the pulling force being transmitted to the jaw via the first tube, and the first tube comprising a flexible section between a first plate and a second plate of a remote center compliance device, the predetermined pulling force being suitable for pulling on the jaw to pull the mandrel to deform the shaft of the fastening shank which is held in the fastening site by a bearing wall of the insertion device to swage the fastening shank in the fastening site until the mandrel breaks after the swaging of the fastening shank, the pulling and extracting device comprising a second flexible tube, the second flexible tube at least partially surrounding the flexible section of the first tube between the first plate and the second plate, the second flexible tube comprising a first end and a second end, the first end of the second flexible tube being fastened to the first plate, the second end of the second flexible tube being fastened to the second plate, the first tube being capable of sliding freely in the second flexible tube without applying any force leading to a change in a configuration of the passive compliance device and wherein the step of pulling comprises: a sub-step of pulling, implemented by the pulling member, comprising applying the predetermined pulling force to the first tube at the first end, swaging the fastening shank via the predetermined pulling force that pulls on the mand

Assignees

Inventors

Classifications

  • by pulling a mandrel · CPC title

  • using remote centre compliance devices · CPC title

  • Devices for inserting or holding rivets in position with or without feeding arrangements · CPC title

  • B21J15/44Primary

    Rivet hole positioners · CPC title

  • Compliance devices · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US11273485B2 cover?
A device for inserting the blind fastener in the fastening site, a pulling and extracting device for swaging the blind fastener in the fastening site and a passive compliance device that binds the inserting device to the pulling and extracting device. The passive compliance device allows the installation of the bind fastener without sensors.
Who is the assignee on this patent?
Airbus Operations Sas
What technology area does this patent fall under?
Primary CPC classification B21J15/44. Mapped technology areas include Operations & Transport.
When was this patent published?
Publication date Tue Mar 15 2022 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 1 related publication on this page (citations in our corpus or others sharing the same primary CPC).