Systems and methods for improved rate of change of frequency ride-through in electric power systems
US-2021281078-A1 · Sep 9, 2021 · US
US11271403B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-11271403-B2 |
| Application number | US-201816753965-A |
| Country | US |
| Kind code | B2 |
| Filing date | Oct 2, 2018 |
| Priority date | Oct 6, 2017 |
| Publication date | Mar 8, 2022 |
| Grant date | Mar 8, 2022 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
A method for preparing a wind power facility for a transition from a first mode of operation to a second mode of operation includes the steps of specifying a set of operational parameters to be applied by the wind power facility in connection with the second mode of operation, said specified set of operational parameters being available for the wind power facility in response to a provided transition triggering signal, and providing the transition triggering signal and applying the specified set of operational parameters in the wind power facility in response thereto, wherein a subset of the specified set of operational parameters is applied in each of a plurality of wind turbine generators in response to the provided transition triggering signal. The first mode of operation may involve a normal mode of operation whereas the second mode of operation may involve an island mode of operation.
Opening claim text (preview).
The invention claimed is: 1. A method for preparing a wind power facility for a transition from a normal mode of operation to an island mode of operation, the wind power facility comprising a plurality of wind turbine generators, the method comprising: operating the plurality of wind turbine generators according to a first set of operational parameters for the normal mode of operation to provide power to an external power grid connected to the wind power facility; determining, based on a predetermined transition plan, a second set of operational parameters to be applied by the wind power facility in connection with the island mode of operation, wherein the second set of operational parameters are different from the first set of operational parameters to provide power to the wind power facility when the wind power facility is disconnected from the external power grid; while operating the plurality of wind turbine generators according to the first set of operational parameters, preloading the second set of operational parameters to the wind turbine generators of the wind power facility; after preloading the second set of operational parameters, continuing to operate the plurality of wind turbine generators according to the first set of operational parameters, until a transition triggering signal is received, wherein the transition triggering signal does not include operational set points for the plurality of wind turbine generators; and in response to receiving a transition triggering signal at the plurality of wind turbine generators, operating the plurality of wind turbine generators according to the second set of operational parameters. 2. The method of claim 1 , wherein the second set of operational parameters indicate different operational parameters for at least one wind turbine generator of the plurality of wind turbine generators relative to operational parameters for remaining wind turbine generators of the plurality of wind turbine generators. 3. The method of claim 1 , wherein the second set of operational parameters include a ramping rate from the first set of operational parameters to maintain at least one of a voltage or a frequency in the power grid as the wind power plant transitions to the island mode of operation. 4. A wind turbine power facility comprising: a plurality of wind turbine generators; and a wind power facility controller configured to: operate the plurality of wind turbine generators according to a first set of operational parameters for a normal mode of operation to provide power to an external power grid connected to the wind turbine power facility; preload, while operating the plurality of wind turbine generators according to the first set of operational parameters, the plurality of wind turbine generators with a second set of operational parameters, different than the first set of operational parameters, for an island mode of operation to provide power to the wind turbine power facility when the wind turbine power facility is disconnected from the external power grid; continue to operate the plurality of wind turbine generators according to the first set of operational parameters after preloading the second set of operational parameters; transmit a triggering signal to the plurality of wind turbine generators, wherein the triggering signal does not include operational set points for the plurality of wind turbine generators; and operate, after transmitting the triggering signal, the plurality of wind turbine generators according to the second set of operational parameters. 5. The wind turbine power facility of claim 4 , wherein the second set of operational parameters indicate different operational parameters for at least one wind turbine generator of the plurality of wind turbine generators relative to operational parameters for remaining wind turbine generators of the plurality of wind turbine generators. 6. The wind turbine power facility of claim 4 , wherein the second set of operational parameters include a ramping rate from the first set of operational parameters to maintain at least one of a voltage or a frequency in the power grid as the wind power plant transitions to the island mode of operation. 7. The wind turbine power facility of claim 4 , wherein the wind power facility controller configured to: preload, while operating the plurality of wind turbine generators according to the second set of operational parameters, the plurality of wind turbine generators with the first set of operational parameters for the normal mode of operation to provide power to the external power grid when connected to the wind turbine power facility; continue to operate the plurality of wind turbine generators according to the second set of operational parameters after preloading the first set of operational parameters; transmit a second triggering signal to the plurality of wind turbine generators, wherein the second triggering signal does not include operational set points for the plurality of wind turbine generators; and operate, after transmitting the second triggering signal, the plurality of wind turbine generators according to the first set of operational parameters. 8. A method for controlling a wind power facility comprising a plurality of wind turbine generators to transition to a normal mode of operation from an island mode of operation, the method comprising: operating the plurality of wind turbine generators according to a first set of operational parameters for the island mode of operation to provide power to the wind power facility when disconnected from an external power grid; while operating the plurality of wind turbine generators according to the first set of operational parameters, preloading the plurality of wind turbine generators with a second set of operational parameters, different than the first set of operational parameters, for the normal mode of operation to provide power the external power grid as the wind power facility connects to the external power grid; after preloading the second set of operational parameters, continuing to operate the plurality of wind turbine generators according to the first set of operational parameters, until a transition triggering signal is received, wherein the transition triggering signal does not include operational set points for the plurality of wind turbine generators; and in response to receiving the transition triggering signal at the plurality of wind turbine generators, operating the plurality of wind turbine generators according to the second set of operational parameters. 9. The method of claim 8 , wherein the second set of operational parameters indicate different operational parameters for at least one wind turbine generator of the plurality of wind turbine generators relative to operational parameters for remaining wind turbine generators of the plurality of wind turbine generators. 10. The method of claim 8 , wherein the second set of operational parameters include a ramping rate from the first set of operational parameters to maintain at least one of a voltage or a frequency in the power grid as the wind power plant transitions to the normal mode of operation.
Wind energy · CPC title
Arrangements for the handling of islanding, e.g. for disconnection or for avoiding the disconnection of power · CPC title
Arrangements for adjusting, eliminating or compensating reactive power in networks · CPC title
Circuit arrangements for charging or discharging batteries or for supplying loads from batteries · CPC title
Power conversion electric or electronic aspects · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.