Forming device and forming method

US11267034B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-11267034-B2
Application numberUS-201816115034-A
CountryUS
Kind codeB2
Filing dateAug 28, 2018
Priority dateMar 1, 2016
Publication dateMar 8, 2022
Grant dateMar 8, 2022

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

The controller controls the gas supply of the gas supply unit so as to maintain a pressure in a metal pipe material at a first pressure when a gas is supplied into the metal pipe material which is formed into a pipe portion in a main cavity portion in a state where an upper die and a lower die are joined to each other. It is possible to prevent pressure drop in the pipe portion caused by cooling of the pipe portion due to a contact between the dies, and the pipe portion. Thus, it is possible to suppress a decrease in a force for pressing the pipe portion against the dies. It is possible to suppress a decrease in adhesion between the pipe portion and the dies when the metal pipe is formed, and it is possible to suppress occurrence of variations in hardenability in the pipe portion.

First claim

Opening claim text (preview).

What is claimed is: 1. A forming device for forming a metal pipe, the forming device comprising: a drive mechanism configured to move a first die towards a second die, when a metal pipe material comprising a pipe portion and a flange portion is between the first die and the second die, in a manner that causes the metal pipe material to come into contact with the first die and the second die; a gas supply unit configured to supply, into the metal pipe material that is in contact with the first die and the second die, a gas that forms the metal pipe material by expanding the metal pipe material; a cooling apparatus configured to cool, after the gas expands the metal pipe material, the metal pipe material that is between the first die and the second die; and a controller configured to control, while the cooling apparatus cools the metal pipe material, the gas supply unit in a manner that causes the gas supply unit to maintain the gas at an operating pressure for a period of time, and wherein the gas supply unit is configured to supply the gas to maintain pressure in the metal pipe material at a pressure other than the operating pressure so as to form the flange portion of the metal pipe. 2. The forming device according to claim 1 , wherein the controller configured to control, while the gas expands the metal pipe material, the gas supply unit in a manner that causes the gas supply unit to supply the gas at the operating pressure. 3. The forming device according to claim 1 , wherein the gas supply unit is configured to cause, by maintaining the gas at the operating pressure, the metal pipe material to remain in contact with the first die and the second die for the period of time. 4. The forming device according to claim 1 , wherein the cooling apparatus is configured to cool, after the gas forms the metal pipe material, the metal pipe material by cooling the first die. 5. The forming device according to claim 1 , wherein the cooling apparatus is configured to cool, after the gas forms the metal pipe material, the metal pipe material by cooling the second die. 6. The forming device according to claim 1 , wherein the cooling apparatus further comprises a cooling medium that is blown onto the metal pipe material to cool the metal pipe material. 7. The forming device according to claim 1 , wherein the gas supply unit is configured to supply, into the metal pipe material that is in contact with the first die and the second die, the gas so as to constantly maintain the operating pressure in the metal pipe material at the pressure and prevent pressure drop in the metal pipe material caused by the cooling of the metal pipe material. 8. The forming device according to claim 1 , wherein the controller is configured to control the drive mechanism in a manner that causes the drive mechanism to move the first die toward the second die. 9. The forming device according to claim 1 , further comprising: a heating mechanism configured to heat the metal pipe material when the metal pipe material is between the first die and the second die. 10. The forming device according to claim 9 , wherein the controller is configured to control the gas supply unit in a manner that causes the gas supply unit to supply, when the metal pipe material is heated by the heating mechanism, the gas into the metal pipe material that is between the first die and the second die. 11. The forming device according to claim 9 , wherein the heating mechanism is configured to heat the metal pipe material before the gas supply unit supplies the gas into the metal pipe material that is between the first die and the second die. 12. The forming device according to claim 1 , wherein the gas supply unit is configured to supply the gas to maintain pressure in the metal pipe material at the operating pressure so as to form the pipe portion of the metal pipe. 13. The forming device according to claim 1 , wherein the first die and the second die constitute: a first cavity portion for forming the pipe portion, and a second cavity portion for forming the flange portion. 14. The forming device according to claim 13 , wherein the second cavity portion communicates with the first cavity portion. 15. The forming device according to claim 13 , further comprising: a heater configured to heat the metal pipe material, wherein the gas supply unit comprises gas storage means for: storing the gas, and supplying the gas stored in the gas storage means into the metal pipe material so as to maintain the pressure of the gas in the metal pipe material at a first pressure or a second pressure. 16. A forming device for forming a metal pipe, the forming device comprising: a drive mechanism configured to move a first die towards a second die, when a metal pipe material comprising a pipe portion and a flange portion is between the first die and the second die, in a manner that causes the metal pipe material to come into contact with the first die and the second die; a gas supply unit configured to supply, into the metal pipe material that is in contact with the first die and the second die, a gas that forms the metal pipe material by expanding the metal pipe material; a cooling apparatus configured to cool, after the gas expands the metal pipe material, the metal pipe material that is between the first die and the second die; a controller configured to control, while the cooling apparatus cools the metal pipe material, the gas supply unit in a manner that causes the gas supply unit to maintain the gas at an operating pressure for a period of time; and a heater configured to heat the metal pipe material, wherein the gas supply unit comprises gas storage means for: storing the gas, and supplying the gas stored in the gas storage means into the metal pipe material so as to maintain the pressure of the gas in the metal pipe material at a first pressure or a second pressure, wherein the first die and the second die constitute: a first cavity portion for forming the pipe portion, and a second cavity portion for forming the flange portion, wherein the controller is configured to: control the gas supply of the gas supply unit to expand a portion of the metal pipe material so as to form the flange portion in the second cavity portion, and control the gas supply of the gas supply unit so as to maintain the pressure of the gas in the metal pipe material at the second pressure lower than the first pressure. 17. A forming device for forming a metal pipe, the forming device comprising: a drive mechanism configured to move a first die towards a second die, when a metal pipe material comprising a pipe portion and a flange portion is between the first die and the second die, in a manner that causes the metal pipe material to come into contact with the first die and the second die; a gas supply unit configured to supply, into the metal pipe material that is in contact with the first die and the second die, a gas that forms the metal pipe material by expanding the metal pipe material; a cooling apparatus configured to cool, after the gas expands the metal pipe material, the metal pipe material that is between the first die and the second die; and a controller configured to control, while the cooling apparatus cools the metal pipe material, the gas supply unit in a manner that causes the gas supply unit to maintain the gas at an operating pressure for a period of time, wherein the first die and the second die constitute: a first cavity portion for forming the pipe portion, and a second cavity portion for forming the flange portion, wher

Assignees

Inventors

Classifications

  • Means for controlling the clamping or opening of the moulds · CPC title

  • B21D26/041Primary

    Means for controlling fluid parameters, e.g. pressure or temperature · CPC title

  • for tubular articles · CPC title

  • Heating or cooling · CPC title

  • Closing or sealing means · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US11267034B2 cover?
The controller controls the gas supply of the gas supply unit so as to maintain a pressure in a metal pipe material at a first pressure when a gas is supplied into the metal pipe material which is formed into a pipe portion in a main cavity portion in a state where an upper die and a lower die are joined to each other. It is possible to prevent pressure drop in the pipe portion caused by coolin…
Who is the assignee on this patent?
Sumitomo Heavy Industries
What technology area does this patent fall under?
Primary CPC classification B21D26/041. Mapped technology areas include Operations & Transport.
When was this patent published?
Publication date Tue Mar 08 2022 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 3 related publications on this page (citations in our corpus or others sharing the same primary CPC).