Power distribution system
US-2017222436-A1 · Aug 3, 2017 · US
US11214382B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-11214382-B2 |
| Application number | US-201916381601-A |
| Country | US |
| Kind code | B2 |
| Filing date | Apr 11, 2019 |
| Priority date | Apr 13, 2018 |
| Publication date | Jan 4, 2022 |
| Grant date | Jan 4, 2022 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
A method and apparatus for operating a power distribution system includes a power converter adapted to receive a power supply and convert the power supply to a power output, a set of solid state switching elements connected with the power output, a set of sensors adapted to sense a power demand at the set of solid state switching elements, and a controller module communicatively connected with the set of sensors and the set of solid state switching elements.
Opening claim text (preview).
What is claimed is: 1. A method of operating a power distribution system including a power converter having a maximum power demand threshold, comprising: identifying a high power transient demand in a set of solid state switching elements; upon identification of the high power transient demand, raising a current trip rating for the respective solid state switching element associated with the high power transient demand; receiving, in a controller module, a set of present power demands from the set of solid state switching elements; summating the set of present power demands in the controller module; comparing the summated set of present power demands with the maximum power demand threshold; and when the summated set of present power demands exceeds the maximum power demand threshold, limiting a maximum current for at least a subset of solid state switching elements; wherein the set of solid state switching elements are connected downstream of the power converter; and wherein the limiting limits a total power supplied by the power converter to less than or equal to the maximum power demand threshold. 2. The method of claim 1 further comprising prioritizing the set of solid state switching elements. 3. The method of claim 2 wherein limiting the maximum current for the at least a subset of the solid state switching elements occurs in accordance with the prioritizing the solid state switching elements. 4. The method of claim 2 wherein the prioritizing includes prioritizing the set of solid state switching elements based on an electrical load connected with the set of solid state switching elements. 5. The method of claim 1 wherein, when the summated set of present power demands exceeds the maximum power demand threshold, limiting the maximum current for at least another subset of the solid state switching elements. 6. The method of claim 1 further comprising, upon identification of the high power transient demand, limiting the maximum current for the respective solid state switching element associated with the high power transient demand. 7. The method of claim 1 wherein limiting the maximum current for the subset of solid state switching elements prevents tripping of the subset of solid state switching elements. 8. A power distribution system, comprising: a power converter adapted to receive a power supply and convert the power supply to a power output; a set of solid state switching elements connected with the power output; a set of sensors adapted to sense a power demand at the set of solid state switching elements; and a controller module communicatively connected with the set of sensors and the set of solid state switching elements; wherein the controller module is adapted to identify a high power transient demand in the set of solid state switching elements, and upon identification of the high power transient demand, raise a current trip rating for the respective solid state switching element associated with the high power transient demand, obtain the set of sensed power demands, summate the set of sensed power demands, compare the summated sensed power demands with a maximum power demand threshold for the power converter, and when the summated set of sensed power demands exceeds the maximum power demand threshold, controllably limit a maximum current for at least a subset of solid state switching elements, wherein the limiting limits a total power supplied by the power converter to less than or equal to the maximum power demand threshold. 9. The power distribution system of claim 8 wherein the set of sensors are current sensors. 10. The power distribution system of claim 8 wherein the power demand threshold is a current demand threshold. 11. The power distribution system of claim 8 wherein the set of solid state switching elements include a respective set of maximum current thresholds. 12. The power distribution system of claim 11 wherein the controller module is further adapted to controllably increase at least a subset of the maximum current thresholds in response to a high power transient demand in a respective subset of solid state switching elements. 13. A method of operating a power distribution system, comprising: identifying a high power transient demand in a set of solid state switching elements; upon identification of the high power transient demand raising a current trip rating for a respective solid state switching element associated with the high power transient demand; receiving, in a controller module, a set of power demands from a set of power sensors associated with a respective set of controllably switchable elements; comparing the set of power demands with a maximum power demand criteria; and when the power demands exceed the maximum power demand criteria, controllably limiting, by the controller module, at least a subset of switchable elements such that a maximum delivered power from a power converter remains less than the maximum power demand criteria. 14. The method of claim 13 wherein the set of controllably switchable elements define a respective set of maximum current thresholds, and wherein controllably limiting includes altering at least a subset of maximum current thresholds in a corresponding subset of switchable elements. 15. The method of claim 13 wherein the maximum power demand criteria includes at least one of an average power, a temporal power demand, a summation of the set of power demands from a set of power sensors, or an individual threshold value for a respective switchable element.
for limitation of the power consumption in the networks or in one section of the networks, e.g. load shedding or peak shaving · CPC title
for aircrafts · CPC title
the power network being controlled at grid-level, e.g. using aggregators · CPC title
Demand-responsive operation of AC power transmission or distribution networks · CPC title
Ram air turbines · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.