Exhaust gas purification device
US-2015361852-A1 · Dec 17, 2015 · US
US11208940B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-11208940-B2 |
| Application number | US-201916354819-A |
| Country | US |
| Kind code | B2 |
| Filing date | Mar 15, 2019 |
| Priority date | Mar 20, 2018 |
| Publication date | Dec 28, 2021 |
| Grant date | Dec 28, 2021 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
A process for manufacturing a muffler for an exhaust system of an internal combustion engine, provides a manufactured muffler with a muffler housing with a housing jacket (14) that is elongated in a direction of a housing longitudinal axis and with at least one housing bottom (26) carried on the housing jacket (14). The process includes the steps of providing the housing jacket (14) with a stop formation (50) in association with at least one housing bottom (26) to be carried on the housing jacket (14), providing the at least one housing bottom (26) to be carried on the housing jacket (14), and positioning the at least one housing bottom (26) on the housing jacket (14) such that the housing bottom (26) is in contact with the stop formation (50) associated with the housing bottom (26).
Opening claim text (preview).
What is claimed is: 1. A process for manufacturing muffler for an exhaust system of an internal combustion engine, wherein the muffler to be manufactured comprises a muffler housing with a housing jacket elongated in a direction of a housing longitudinal axis and with at least one housing bottom carried on the housing jacket, the process comprising the steps of: providing the housing jacket with a stop formation in association with the at least one housing bottom to be carried on the housing jacket, wherein the at least one housing bottom is provided as an outer bottom, which outer bottom closes a housing interior enclosed by the housing jacket in the direction of the housing longitudinal axis and is provided with at least one opening for receiving an exhaust gas pipe; positioning the at least one housing bottom on the housing jacket such that the housing bottom is in contact with the stop formation associated with the at least one housing bottom fixing the at least one housing bottom, that is in contact with the stop formation, to the housing jacket; and fixing an exhaust gas pipe to a housing bottom subsequent to the step of fixing the at least one housing bottom, that is in contact with the stop formation, to the housing jacket. 2. The process in accordance with claim 1 , further comprising fixing the at least one housing bottom, that is in contact with a stop formation, to the housing jacket after the step of positioning the at least one housing bottom on the housing jacket is carried out. 3. The process in accordance with claim 2 , wherein after fixing the at least one housing bottom, that is in contact with a stop formation, to the at least one housing jacket the housing bottom is: in contact with the stop formation associated with the at least one housing jacket; or fixed by a connection in substance; or in contact with the stop formation associated with the at least one housing jacket and fixed by a connection in substance. 4. The process in accordance with claim 2 , wherein: at least some of the stop projections are provided in the at least one stop formation by positioning pins passing through respective openings in the housing jacket; and all of the positioning pins pin associated with the at least one housing bottom and fixed to the housing jacket are removed from the openings receiving the respective positioning pins and the openings are closed. 5. The process in accordance with claim 4 , wherein: at least one of the openings is closed by a connection in substance; or at least one of the openings is closed by a closing element; or at least one of the openings is closed by a connection in substance and at least one of the openings is closed by a closing element. 6. The process in accordance with claim 2 , wherein the at least one housing bottom that is in contact with a stop formation to the housing jacket is fixed to the housing jacket in an area of the connecting wall area to the housing jacket. 7. The process in accordance with claim 1 , wherein at least one of the stop projections is provided in at least one stop formation by a pot-shaped bulge directed towards the housing interior. 8. The process in accordance with claim 1 , wherein at least one of the stop projections is provided in the at least one stop formation by a positioning pin passing through an opening in the housing jacket. 9. The process in accordance with claim 1 , wherein the stop formation is provided by a beaded bulge extending in a circumferential direction about the housing longitudinal axis in at least some areas and projects into a housing interior enclosed by the housing jacket. 10. The process in accordance with claim 1 , wherein: the at least one housing bottom to be carried on the housing jacket is provided with a bottom wall area and with an essentially cylindrical connecting wall area, which connecting wall area adjoins the bottom wall area in an outer circumferential area, and the housing bottom is positioned with the connecting wall area such that the housing bottom is in contact with the stop formation. 11. The process in accordance with claim 1 , wherein the step of providing the housing jacket with a stop formation includes providing two jacket shells, which are to be positioned such that the two jacket shells adjoin each other in connection areas. 12. The process in accordance with claim 1 , wherein: the at least one stop formation comprises a plurality of stop projections arranged at spaced locations from one another about the housing longitudinal axis in a circumferential direction; and the plurality of stop projections project into a housing interior enclosed by the housing jacket. 13. The process in accordance with claim 1 , wherein: the step of providing the housing jacket with a stop formation includes providing the housing jacket with at least one axial end area with a radial expansion area and adjoining the radial expansion area with an essentially cylindrical end section for receiving the housing bottom; the stop formation is provided in the radial expansion area or the stop formation is provided in the end section of the housing jacket or the stop formation is provided in the radial expansion area and in the end section of the housing jacket. 14. A process for manufacturing a muffler for an exhaust system of an internal combustion engine, wherein the muffler to be manufactured comprises a muffler housing with a housing jacket elongated in a direction of a housing longitudinal axis and with at least one housing bottom carried on the housing jacket, the process comprising the steps of: providing the housing jacket with a stop formation associated with the at least one housing bottom to be carried on the housing jacket, the housing jacket comprising a jacket housing end area, the jacket housing end area comprising a first housing jacket portion and a second housing jacket portion, the second housing jacket portion defining an essentially cylindrical end for receiving the at least one housing bottom, the first housing jacket portion comprising a first housing jacket portion first area and a first housing jacket portion second area, at least a part of the first housing jacket portion second area being located adjacent to the second housing jacket portion, the first housing jacket portion second area being located between the second housing jacket portion and the first housing jacket portion first area, the first housing jacket portion first area being located at a first radial distance from the housing longitudinal axis, the first housing jacket portion second area being located at a second radial distance from the housing longitudinal axis, the second radial distance being greater than the first radial distance, wherein the first housing jacket portion defines a radial expansion area of the housing jacket, the stop formation comprising a plurality of stop projections arranged at spaced locations from one another about the housing longitudinal axis in a circumferential direction and projecting into a housing interior enclosed by the housing jacket in the radial expansion area; providing the at least one housing bottom to be carried on the housing jacket; and positioning the at least one housing bottom on the housing jacket such that the housing bottom is in contact with the stop formation associated with the at least one housing bottom. 15. A process in accordance with claim 14 , wherein: the at least one housing bottom is provided as an outer bottom, which outer bottom closes a housing interior enclosed by the housing jacket in the direction of the h
Construction facilitating manufacture, assembly, or disassembly · CPC title
Tubular or hollow articles · CPC title
Exhaust or silencing apparatus characterised by constructional features · CPC title
the parts being assembled in longitudinal direction · CPC title
Crimping or bending the workpieces at the joining area · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.