Maintenance facility, power generation facility, and maintenance method for device
US-2019291829-A1 · Sep 26, 2019 · US
US11208179B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-11208179-B2 |
| Application number | US-201816465270-A |
| Country | US |
| Kind code | B2 |
| Filing date | Mar 22, 2018 |
| Priority date | Mar 31, 2017 |
| Publication date | Dec 28, 2021 |
| Grant date | Dec 28, 2021 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
A maintenance facility includes: a first barge; a first connection portion disposed on the first barge and configured to connect the first barge to a second barge mounted with a device including a maintenance target portion; and a building disposed on the first barge and including a wall portion and a roof portion. On the first barge, a temporary placing space in which the maintenance target portion can be placed is disposed between the first connection portion and the building.
Opening claim text (preview).
The invention claimed is: 1. A maintenance facility comprising: a first barge; a first connection portion disposed on the first barge and configured to connect the first barge to a second barge mounted with a device including a maintenance target portion; a building disposed on the first barge and including a wall portion and a roof portion, the building being capable of accommodating the maintenance target portion; and a crane disposed inside the building, the crane being capable of lifting the maintenance target portion, wherein, on the first barge, a temporary placing space in which the maintenance target portion can be placed is disposed between the first connection portion and the building. 2. The maintenance facility according to claim 1 , further comprising a utility device for maintenance disposed on the first barge. 3. The maintenance facility according to claim 1 , further comprising a transportation device capable of transporting the maintenance target portion on the first barge. 4. A power generation facility comprising: a second barge including a second connection portion configured to be connected to a first barge for maintenance; a power generation device disposed on the second barge; and a crane disposed, on the second barge, between the second connection portion and a maintenance target portion of the power generation device, wherein the crane is disposed on a lateral side of a turbine of the power generation facility in an axial direction of the turbine. 5. The power generation facility according to claim 4 , wherein the crane is disposed so as to overlap with the power generation device in an axial direction of the turbine.
Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices {(construction methods for floating offshore platforms B63B75/00)} · CPC title
Mooring or anchoring equipment, not otherwise provided for · CPC title
Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for · CPC title
Other loading or unloading equipment involving an intermittent action, not provided in groups B63B27/04 - B63B27/18 · CPC title
Floating structures carrying electric power plants · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.