High integrity protection system for hydrocarbon flow lines

US11175683B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-11175683-B2
Application numberUS-202016854362-A
CountryUS
Kind codeB2
Filing dateApr 21, 2020
Priority dateMar 26, 2018
Publication dateNov 16, 2021
Grant dateNov 16, 2021

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A high integrity protection system includes a flow line including an inlet configured to be connected to a first source of pressure and an outlet configured to be connected to a downstream system. A first subsystem is installed on the flow line between the inlet and the outlet. A second subsystem is installed on the flow line between the inlet and the outlet, and the second subsystem is in a parallel flow configuration in relation to the first subsystem. The system includes a second source of pressure configured to be fluidically connected to the first subsystem and the second subsystem.

First claim

Opening claim text (preview).

What is claimed is: 1. A method for safety testing of a high integrity protection system (HIPS), the method comprising: for a flow line comprising a first subsystem and a second subsystem in a parallel flow configuration in relation to each other, providing, by a first source of pressure, fluidic pressure in the flow line; directing fluid flow from the first source of pressure through the first subsystem; and while directing fluid flow through the first subsystem: isolating the second subsystem from the first source of pressure and the first subsystem; providing, by a second source of pressure, fluidic pressure in the second subsystem to at least a predetermined pressure threshold value; conducting a stroke test on the second subsystem; and conducting a leak test on the second subsystem. 2. The method of claim 1 , further comprising: directing fluid flow from the first source of pressure through the second subsystem; and while directing fluid flow through the second subsystem: isolating the first subsystem from the first source of pressure and the second subsystem; providing, by the second source of pressure, fluidic pressure in the first subsystem to at least the predetermined pressure threshold value; conducting a stroke test on the first subsystem; and conducting a leak test on the first subsystem. 3. The method of claim 2 , wherein: the first subsystem comprises: a first surface safety valve (SSV); a second SSV installed downstream of the first SSV; a first plurality of pressure sensors installed upstream of the first SSV; and a first logic solving processor in communication with the first plurality of pressure sensors, the first SSV, and the second SSV, the first logic solving processor configured to perform operations comprising transmitting signals to control the first SSV and the second SSV based on signals received from the first plurality of pressure sensors; and the second subsystem comprises: a third SSV; a fourth SSV installed downstream of the third SSV; a second plurality of pressure sensors installed upstream of the third SSV; and a second logic solving processor in communication with the second plurality of pressure sensors, the third SSV, and the fourth SSV, the second logic solving processor configured to perform operations comprising transmitting signals to control the third SSV and the fourth SSV based on signals received from the second plurality of pressure sensors. 4. The method of claim 3 , wherein: conducting the stroke test on the first subsystem comprises: transmitting a first close signal to close the first SSV and the second SSV based on detecting pressure in the first subsystem equal to or greater than the predetermined pressure threshold value; and actuating a first close failure alarm based on determining that any one of the first SSV and the second SSV failed to close upon transmission of the first close signal; and conducting the stroke test on the second subsystem comprises: transmitting a second close signal to close the third SSV and the fourth SSV based on detecting pressure in the second subsystem equal to or greater than the predetermined pressure threshold value; and actuating a second close failure alarm based on determining that any one of the third SSV and the fourth SSV failed to close upon transmission of the second close signal. 5. The method of claim 4 , wherein conducting the leak test on the first subsystem comprises: detecting, by a first leak sensor installed directly downstream of the first SSV, a first change in fluidic pressure directly downstream of the first SSV; detecting, by a second leak sensor installed directly downstream of the second SSV, a second change in fluidic pressure directly downstream of the second SSV; comparing, by the first logic solving processor, the first change in fluidic pressure to a predetermined pressure differential threshold value; comparing, by the first logic solving processor, the second change in fluidic pressure to the predetermined pressure differential threshold value; actuating a first leak failure alarm if the first change in fluidic pressure is greater than the predetermined pressure differential threshold value within a predetermined time span after the transmission of the first close signal; and actuating a second leak failure alarm if the second change in fluidic pressure is greater than the predetermined pressure differential threshold value within the predetermined time span after the transmission of the first close signal. 6. The method of claim 5 , wherein conducting the leak test on the second subsystem comprises: detecting, by a third leak sensor installed directly downstream of the third SSV, a third change in fluidic pressure directly downstream of the third SSV; detecting, by a fourth leak sensor installed directly downstream of the fourth SSV, a fourth change in fluidic pressure directly downstream of the fourth SSV; comparing, by the second logic solving processor, the third change in fluidic pressure to the predetermined pressure differential threshold value; comparing, by the second logic solving processor, the fourth change in fluidic pressure to the predetermined pressure differential threshold value; actuating a third leak failure alarm if the third change in fluidic pressure is greater than the predetermined pressure differential threshold value within the predetermined time span after the transmission of the second close signal; and actuating a fourth leak failure alarm if the fourth change in fluidic pressure is greater than the predetermined pressure differential threshold value within the predetermined time span after the transmission of the second close signal.

Assignees

Inventors

Classifications

  • Fluid pressure responsive indicator, recorder or alarm · CPC title

  • using pressure measurements · CPC title

  • By fluid pressure · CPC title

  • the plurality of throttling means being arranged in parallel · CPC title

  • with a plurality of pressure sources · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US11175683B2 cover?
A high integrity protection system includes a flow line including an inlet configured to be connected to a first source of pressure and an outlet configured to be connected to a downstream system. A first subsystem is installed on the flow line between the inlet and the outlet. A second subsystem is installed on the flow line between the inlet and the outlet, and the second subsystem is in a pa…
Who is the assignee on this patent?
Saudi Arabian Oil Co
What technology area does this patent fall under?
Primary CPC classification G05D16/2033. Mapped technology areas include Physics.
When was this patent published?
Publication date Tue Nov 16 2021 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 3 related publications on this page (citations in our corpus or others sharing the same primary CPC).