Boom assembly and method of assembly thereof

US11148915B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-11148915-B2
Application numberUS-201916576414-A
CountryUS
Kind codeB2
Filing dateSep 19, 2019
Priority dateSep 19, 2019
Publication dateOct 19, 2021
Grant dateOct 19, 2021

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A boom assembly for a pipelayer includes a boom member having a first end and a second end. The boom assembly includes a first boom block adapted to be removably coupled to the second end of the boom member. The boom assembly includes a second boom block adapted to be removably coupled to a chassis of the pipelayer. The boom assembly includes a first hook block adapted to be removably coupled to the second end of the boom member. The boom assembly includes a second hook block adapted to be operably coupled to the first hook block. The boom assembly also includes a first lifting connector disposed on the first boom block and a second lifting connector disposed on the first hook block. Each of the first lifting connector and the second lifting connector is adapted to removably receive a lifting strap therethrough.

First claim

Opening claim text (preview).

What is claimed is: 1. A boom assembly for a pipelayer, the boom assembly comprising: a boom member having a first end and a second end disposed opposite to the first end, the first end of the boom member adapted to be removably coupled to an undercarriage of the pipelayer; a first boom block adapted to be removably coupled to the second end of the boom member; a second boom block adapted to be removably coupled to a chassis of the pipelayer and operably coupled to the first boom block using at least one first cable; a first hook block adapted to be removably coupled to the second end of the boom member and disposed opposite to the first boom block; a second hook block adapted to be operably coupled to the first hook block using at least one second cable; a first lifting connector disposed on the first boom block; and a second lifting connector disposed on the first hook block, wherein each of the first lifting connector and the second lifting connector is adapted to removably receive a lifting strap therethrough. 2. The boom assembly of claim 1 , wherein the first lifting connector is coupled to any one of a body and a yoke of the first boom block. 3. The boom assembly of claim 1 , wherein the first lifting connector is coupled to the first boom block using a first adapter plate. 4. The boom assembly of claim 1 , wherein the second lifting connector is coupled to any one of a body and a yoke of the first hook block. 5. The boom assembly of claim 1 , wherein the second lifting connector is coupled to the first hook block using a second adapter plate. 6. The boom assembly of claim 1 , wherein the first lifting connector is any one of a lifting eye and a lifting hook. 7. The boom assembly of claim 1 , wherein the second lifting connector is any one of a lifting eye and a lifting hook. 8. A pipelayer comprising: a chassis; an undercarriage coupled to the chassis; a boom member having a first end and a second end disposed opposite to the first end, the first end of the boom member adapted to be removably coupled to the undercarriage; a first boom block adapted to be removably coupled to the second end of the boom member; a second boom block adapted to be removably coupled to the chassis and operably coupled to the first boom block using at least one first cable; a first hook block adapted to be removably coupled to the second end of the boom member and disposed opposite to the first boom block; a second hook block adapted to be operably coupled to the first hook block using at least one second cable; a first lifting connector disposed on the first boom block; and a second lifting connector disposed on the first hook block, wherein each of the first lifting connector and the second lifting connector is adapted to removably receive a lifting strap therethrough. 9. The pipelayer of claim 8 , wherein the first lifting connector is coupled to any one of a body and a yoke of the first boom block. 10. The pipelayer of claim 8 , wherein the first lifting connector is coupled to the first boom block using a first adapter plate. 11. The pipelayer of claim 8 , wherein the second lifting connector is coupled to any one of a body and a yoke of the first hook block. 12. The pipelayer of claim 8 , wherein the second lifting connector is coupled to the first hook block using a second adapter plate. 13. The pipelayer of claim 8 , wherein the first lifting connector is any one of a lifting eye and a lifting hook. 14. The pipelayer of claim 8 , wherein the second lifting connector is any one of a lifting eye and a lifting hook. 15. A method for assembling a boom assembly on a pipelayer, the method comprising: aligning a first end of a boom member relative to an undercarriage of the pipelayer; coupling, hingedly, the first end of the boom member to the undercarriage; providing a first lifting connector on a first boom block; providing a first lifting strap through the first lifting connector; lifting, by the first lifting connector, the first boom block using the first lifting strap; aligning the first boom block relative to a second end of the boom member; coupling, hingedly, the first boom block to the second end of the boom member; providing a second lifting connector on a first hook block; providing a second lifting strap through the second lifting connector; lifting, by the second lifting connector, the first hook block using the second lifting strap; aligning the first hook block relative to the second end of the boom member; and coupling, hingedly, the first hook block to the second end of the boom member. 16. The method of claim 15 , wherein aligning the first hook block further includes lifting the second end of the boom member relative to ground surface by operating at least one first cable operably coupled between the first boom block and a second boom block. 17. The method of claim 15 , wherein aligning the first end of the boom member further includes: providing a boom lifting strap around the boom member; and lifting the boom member using the boom lifting strap. 18. The method of claim 17 further includes: removing the boom lifting strap from the boom member; removing the first lifting strap from the first lifting connector of the first boom block; and removing the second lifting strap from the second lifting connector of the first hook block. 19. The method of claim 15 , wherein the first end of the boom member is hingedly coupled to the undercarriage using at least one first hinge pin. 20. The method of claim 15 , wherein: the first boom block is hingedly coupled to the second end of the boom member using a second hinge pin, and the first hook block is hingedly coupled to the second end of the boom member using a third hinge pin.

Assignees

Inventors

Classifications

  • General aspects of mobile cranes, overhead travelling cranes, gantry cranes, loading bridges, cranes for building ships on slipways, cranes for foundries or cranes for public works · CPC title

  • B66C23/44Primary

    Jib-cranes adapted for attachment to standard vehicles, e.g. agricultural tractors · CPC title

  • Jibs · CPC title

  • separate from jib · CPC title

  • B66C23/36Primary

    mounted on road or rail vehicles; Manually-movable jib-cranes for use in workshops; Floating cranes (with pneumatic or hydraulic motors B66C23/54; vehicle or ship aspects B60 - B63) · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US11148915B2 cover?
A boom assembly for a pipelayer includes a boom member having a first end and a second end. The boom assembly includes a first boom block adapted to be removably coupled to the second end of the boom member. The boom assembly includes a second boom block adapted to be removably coupled to a chassis of the pipelayer. The boom assembly includes a first hook block adapted to be removably coupled t…
Who is the assignee on this patent?
Caterpillar Inc
What technology area does this patent fall under?
Primary CPC classification B66C23/44. Mapped technology areas include Operations & Transport.
When was this patent published?
Publication date Tue Oct 19 2021 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 4 related publications on this page (citations in our corpus or others sharing the same primary CPC).