Reformer box with reformer tunnel including tunnel port

US11110424B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-11110424-B2
Application numberUS-201916686325-A
CountryUS
Kind codeB2
Filing dateNov 18, 2019
Priority dateNov 18, 2019
Publication dateSep 7, 2021
Grant dateSep 7, 2021

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A top-fired reformer box is provided. The top-fired reformer box includes a burner row, a tube row, a reformer tunnel including a closed end, an open end, and a plurality of tunnel ports formed along a side wall of the reformer tunnel, the plurality of tunnel ports including a one or more tunnel port located along the side of the tunnel, and a flow resistor positioned at least one tunnel port applying a flow resistance for flue gas entering the reformer tunnel via the at least one tunnel port such that uniform flow is achieved within the reformer tunnel.

First claim

Opening claim text (preview).

What is claimed is: 1. A top-fired reformer box, comprising: a burner row; a tube row; a reformer tunnel including a closed end, an open end, and a plurality of tunnel ports formed along a side wall of the reformer tunnel, the plurality of tunnel ports located along the side of the tunnel and a first row of tunnel ports on a roof of the reformer tunnel wherein the plurality of tunnel ports gradually decrease in size from the closed end of the reformer tunnel to the open end of the reformer tunnel; and a flow resistor positioned in at least one tunnel port applying a flow resistance for flue gas entering the reformer tunnel via the at least one tunnel port such that uniform flow is achieved within the reformer tunnel. 2. The top-fired reformer box of claim 1 , wherein the plurality of tunnel ports further includes a second tunnel port located in proximity to the closed end, and further comprising a flow resistor positioned in said first and second tunnel port applying a flow resistance for flue gas entering the reformer tunnel via the second tunnel port. 3. The top-fired reformer box of claim 2 , wherein the flow resistor positioned at the second tunnel port applies a flow resistance less than the flow resistance applied by the flow resistor positioned at a first tunnel port. 4. The top-fired reformer box of claim 1 , wherein a flow resistor is positioned at each of the plurality of tunnel ports, wherein the plurality of tunnel ports are uniform in shape and size. 5. The top-fired reformer box of claim 4 , wherein the flow resistors positioned at each of the plurality of tunnel ports are configured such that a lower flow resistance is applied near the closed end of the reformer tunnel and a higher flow resistance is applied near the open end of the reformer tunnel. 6. The top-fired reformer box of claim 1 , wherein the flow resistor comprises a perforated plate or a porous media. 7. The top-fired reformer box of claim 1 , further comprising a second row of tunnel ports form on the roof of the reformer tunnel. 8. A top-fired reformer box, comprising: a burner row; a tube row; and a reformer tunnel including a closed end, an open end, a side wall and a roof, wherein a plurality of tunnel ports is formed along the side wall of the reformer tunnel, and wherein a plurality of tunnel ports is disposed in the roof of the reformer tunnel in at least a first row such that uniform flow is achieved within the reformer tunnel and where the plurality of tunnel ports gradually decrease in size from the closed end of the reformer tunnel to the open end of the reformer tunnel. 9. The top-fired reformer box of claim 8 , wherein the plurality of tunnel ports formed along the side wall gradually decrease in size from the closed end of the reformer tunnel to the open end of the reformer tunnel. 10. The top-fired reformer box of claim 8 , further comprising a second row of tunnel ports formed on the roof of the reformer tunnel. 11. The top-fired reformer box of claim 8 , further comprising a flow resistor positioned at each of the plurality of tunnel ports formed disposed within the side wall of the tunnel. 12. The top-fired reformer box of claim 11 , wherein the flow resistors positioned at each of the plurality of tunnel ports are configured such that a lower flow resistance is applied near the closed end of the reformer tunnel and a higher flow resistance is applied near the open end of the reformer tunnel. 13. The top-fired reformer box of claim 11 , wherein the flow resistors comprise a perforated plate or a porous media. 14. The top-fired reformer box of claim 8 , further comprising a flow resistor positioned at each of the plurality of tunnel ports formed along the roof of the tunnel.

Assignees

Inventors

Classifications

  • B01J8/008Primary

    Details of the reactor or of the particulate material; Processes to increase or to retard the rate of reaction (B01J8/0285, B01J8/067, B01J8/087, B01J8/1836 take precedence) · CPC title

  • for tubes or tube-assemblies · CPC title

  • Heating or cooling the reactor (B01J8/062 takes precedence) · CPC title

  • Baffles · CPC title

  • by means of a burner · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US11110424B2 cover?
A top-fired reformer box is provided. The top-fired reformer box includes a burner row, a tube row, a reformer tunnel including a closed end, an open end, and a plurality of tunnel ports formed along a side wall of the reformer tunnel, the plurality of tunnel ports including a one or more tunnel port located along the side of the tunnel, and a flow resistor positioned at least one tunnel port a…
Who is the assignee on this patent?
Zanfir Monica, Jin Bo, Shah Minish Mahendra, and 1 more
What technology area does this patent fall under?
Primary CPC classification B01J8/008. Mapped technology areas include Operations & Transport.
When was this patent published?
Publication date Tue Sep 07 2021 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 8 related publications on this page (citations in our corpus or others sharing the same primary CPC).