Method for determining amount of time spent on a task and estimating amount of time required to complete the task
US-2019236516-A1 · Aug 1, 2019 · US
US11086667B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-11086667-B2 |
| Application number | US-201916437723-A |
| Country | US |
| Kind code | B2 |
| Filing date | Jun 11, 2019 |
| Priority date | Jun 11, 2019 |
| Publication date | Aug 10, 2021 |
| Grant date | Aug 10, 2021 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
A method for selective scheduling and deployment of maintenance tasks in cloud computing environments is provided. The method determines a computing environment in which a maintenance task is to be performed. The computing environment has one or more environment characteristics. The method then determines one or more task characteristics for the maintenance task. Based on the one or more environment characteristics and the one or more task characteristics, the method determines a similarity between the maintenance task and one or more historical maintenance tasks. The method generates a completion indicator for the maintenance task based on the similarity between the maintenance task and the one or more historical maintenance tasks. Based on the completion indicator, the method schedules performance of the maintenance task.
Opening claim text (preview).
What is claimed is: 1. A method, comprising: determining a computing environment in which a maintenance task is to be performed, the computing environment having one or more environment characteristics; determining one or more task characteristics of the maintenance task; based on the one or more environment characteristics and the one or more task characteristics, determining a similarity between the maintenance task and one or more historical maintenance tasks by generating a similarity score by calculating a ratio of numerical values for the one or more environment characteristics of the computing environment, the one or more task characteristics of the maintenance task, and one or more historical characteristics of the one or more historical maintenance tasks; generating a completion indicator for the maintenance task based on the similarity between the maintenance task and the one or more historical maintenance tasks; and based on the completion indicator, scheduling performance of the maintenance task for the computing environment. 2. The method of claim 1 , wherein generating the similarity score further comprises determining a summand for nonnumerical values of the one or more environment characteristics, the one or more task characteristics, and the one or more historical characteristics. 3. The method of claim 2 , wherein generating the similarity score further comprises combining the ratio of numerical values and the summand for nonnumerical values for the one or more environment characteristics, the one or more task characteristics, and the one or more historical characteristics. 4. The method of claim 1 , wherein generating the completion indicator further comprises: estimating a total duration of the maintenance task based on the similarity score; and estimating a likelihood of success of the maintenance task based on the similarity score and a historical success rate for the one or more historical maintenance tasks. 5. The method of claim 4 , wherein scheduling performance of the maintenance task further comprises: determining one or more available times for performing the maintenance task based on an event schedule for the computing environment and the total duration estimated for the maintenance task; and reserving at least a portion of time of the one or more available times for performing the maintenance task. 6. A system, comprising: one or more processors; and a computer-readable storage medium, coupled to the one or more processors, storing program instructions that, when executed by the one or more processors, cause the one or more processors to perform operations comprising: determining a computing environment in which a maintenance task is to be performed, the computing environment having one or more environment characteristics; determining one or more task characteristics of the maintenance task; based on the one or more environment characteristics and the one or more task characteristics, determining a similarity between the maintenance task and one or more historical maintenance tasks by generating a similarity score by calculating a ratio of numerical values for the one or more environment characteristics of the computing environment, the one or more task characteristics of the maintenance task, and one or more historical characteristics of the one or more historical maintenance tasks; generating a completion indicator for the maintenance task based on the similarity between the maintenance task and the one or more historical maintenance tasks; and based on the completion indicator, scheduling performance of the maintenance task for the computing environment. 7. The system of claim 6 , wherein generating the similarity score further comprises determining a summand for nonnumerical values of the one or more environment characteristics, the one or more task characteristics, and the one or more historical characteristics. 8. The system of claim 7 , wherein generating the similarity score further comprises combining the ratio of numerical values and the summand for nonnumerical values for the one or more environment characteristics, the one or more task characteristics, and the one or more historical characteristics. 9. The system of claim 6 , wherein generating the completion indicator further comprises: estimating a total duration of the maintenance task based on the similarity score; and estimating a likelihood of success of the maintenance task based on the similarity score and a historical success rate for the one or more historical maintenance tasks. 10. The system of claim 9 , wherein scheduling performance of the maintenance task further comprises: determining one or more available times for performing the maintenance task based on an event schedule for the computing environment and the total duration estimated for the maintenance task; and reserving at least a portion of time of the one or more available times for performing the maintenance task. 11. A computer program product comprising a computer readable storage medium having program instructions embodied therewith, the program instructions being executable by one or more processors to cause the one or more processors to perform operations comprising: determining a computing environment in which a maintenance task is to be performed, the computing environment having one or more environment characteristics; determining one or more task characteristics of the maintenance task; based on the one or more environment characteristics and the one or more task characteristics, determining a similarity between the maintenance task and one or more historical maintenance tasks by generating a similarity score by calculating a ratio of numerical values for the one or more environment characteristics of the computing environment, the one or more task characteristics of the maintenance task, and one or more historical characteristics of the one or more historical maintenance tasks; generating a completion indicator for the maintenance task based on the similarity between the maintenance task and the one or more historical maintenance tasks; and based on the completion indicator, scheduling performance of the maintenance task for the computing environment. 12. The computer program product of claimer 11 , wherein generating the similarity score further comprises determining a summand for nonnumerical values of the one or more environment characteristics, the one or more task characteristics, and the one or more historical characteristics. 13. The computer program product of claim 11 , wherein generating the completion indicator further comprises: estimating a total duration of the maintenance task based on the similarity score; and estimating a likelihood of success of the maintenance task based on the similarity score and a historical success rate for the one or more historical maintenance tasks. 14. The computer program product of claim 13 , wherein scheduling performance of the maintenance task further comprises: determining one or more available times for performing the maintenance task based on an event schedule for the computing environment and the total duration estimated for the maintenance task; and reserving at least a portion of time of the one or more available times for performing the maintenance task.
Establishing a time schedule for servicing the requests · CPC title
Scheduling strategies for dispatcher, e.g. round robin, multi-level priority queues · CPC title
in which an application is distributed across nodes in the network (software deployment G06F8/60; multiprogramming arrangements G06F9/46) · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.