Wind energy park with airborne wind energy systems and a direct current (dc) internal grid
US-2021033069-A1 · Feb 4, 2021 · US
US11015574B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-11015574-B2 |
| Application number | US-201916958775-A |
| Country | US |
| Kind code | B2 |
| Filing date | Jan 21, 2019 |
| Priority date | Jan 22, 2018 |
| Publication date | May 25, 2021 |
| Grant date | May 25, 2021 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
A method of controlling an airborne object ( 2 ), such as a kite or a glider, is disclosed. The airborne object ( 2 ) may be an airborne energy generating system. The airborne object ( 2 ) is coupled to a part of a wind turbine ( 1 ), such as a nacelle ( 4 ), a tower ( 3 ) or a foundation, via a cable ( 7 ). At least one parameter related to movements ( 8 ) of the tower ( 3 ) of the wind turbine ( 1 ) is measured, and a cable force ( 9 ) of the cable ( 7 ) acting on the wind turbine ( 1 ) is adjusted, based on the at least one measured parameter. Thereby the tower movements ( 8 ) can be counteracted and fatigue can be reduced.
Opening claim text (preview).
The invention claimed is: 1. A method of controlling an airborne object, the airborne object being coupled to a part of a wind turbine via a cable, the wind turbine comprising a tower mounted on a foundation, the method comprising the steps of: measuring at least one parameter related to movements of the tower of the wind turbine, and adjusting a cable force of the cable acting on the wind turbine, based on the at least one measured parameter. 2. The method according to claim 1 , wherein the airborne object is an airborne wind energy system for generating electrical energy. 3. The method according to claim 1 , wherein the step of measuring at least one parameter related to movements of the tower of the wind turbine comprises measuring a direction of movement of the tower, a speed of the tower, an acceleration of the tower, a strain in the tower and/or a strain in the foundation. 4. The method according to claim 1 , wherein the step of adjusting a cable force of the cable comprises increasing the cable force in the case that the movement of the tower is along a direction away from the airborne object, and/or decreasing the cable force in the case that the movement of the tower is along a direction towards the airborne object. 5. The method according to claim 1 , wherein the step of adjusting a cable force of the cable comprises modifying a movement pattern of the airborne object. 6. The method according to claim 1 , wherein one end of the cable is connected to a winch at the wind turbine, and wherein the step of adjusting a cable force of the cable comprises adjusting an operational speed of the winch. 7. The method according to claim 1 , wherein the wind turbine further comprises at least one nacelle mounted on the tower and at least one rotor, and wherein one end of the cable is coupled to the nacelle of the wind turbine. 8. The method according to claim 1 , wherein one end of the cable is mounted to the foundation or the tower of the wind turbine. 9. The method according to claim 8 , wherein the cable is mounted via a bearing or rail system arranged circumferentially with respect to the tower. 10. The method according to claim 1 , wherein the step of adjusting a cable force of the cable comprises adjusting a length of the cable. 11. The method according to claim 1 , further comprising the step of retracting the airborne object in the case that the wind speed exceeds a predefined threshold level and/or in the case that the cable force of the cable exceeds a predefined threshold level. 12. The method according to claim 1 , further comprising the step of decreasing the cable force in the case that gusty wind conditions are detected.
for generating power to be supplied to a remote station, e.g. UAVs with solar panels · CPC title
Tethered aircraft · CPC title
Wind turbines with rotation axis in wind direction · CPC title
Wind motors specially adapted for installation in particular locations (means for mounting or supporting wind motors F03D13/20) · CPC title
Onshore wind turbines · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.