Process for assembling a unitized panel for use within an exterior dynamic curtain wall assembly

US11002007B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-11002007-B2
Application numberUS-202015929347-A
CountryUS
Kind codeB2
Filing dateApr 28, 2020
Priority dateMay 19, 2017
Publication dateMay 11, 2021
Grant dateMay 11, 2021

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

Described is an approved dynamic construction for effectively thermally insulating and sealing of a safing slot between a floor of a building and an exterior wall construction wherein the exterior wall construction comprises a curtain wall configuration defined by an interior wall glass surface including one or more aluminum framing members. In particular, a process for assembling a unitized panel for use within an exterior dynamic curtain wall assembly, which includes glass, especially vision glass extending to the finished floor level below, is described as well as a unitized panel assembled according to said process and its installation to improve fire stopping at the safing slot.

First claim

Opening claim text (preview).

The invention claimed is: 1. A process for assembling a unitized panel for an exterior dynamic curtain wall, the process comprising: installing a first L-shaped member of a non-combustible material having a first leg and a second leg perpendicular to each other, and a second L-shaped member of a non-combustible material having a first leg and a second leg perpendicular to each other, such that the first leg of the first L-shaped member is fastened to an upper horizontal framing member of a frame, configured for the unitized panel, and upper locations of vertical framing members of the frame and the first leg of the second L-shaped member are connected to the second leg of the first L-shaped member, thereby forming a substantially U-shaped cavity; fastening the substantially U-shaped cavity to an inner facing side of the vertical framing member, thereby forming a 5-sided box pan; and installing glass and optionally one or more appropriate sealing layers to the unitized panel, thereby completing the unitized panel. 2. The process according to claim 1 , wherein the first and the second L-shaped members each comprise a metal material. 3. The process according to claim 2 , wherein the first and the second L-shaped members each comprise 18 gauge galvanized steel. 4. The process according to claim 1 , wherein the substantially U-shaped cavity is fastened by at least one element selected from the group consisting of pins, expansion anchors, screws, screw anchors, bolts and adhesion anchors. 5. The process according to claim 1 , wherein a support or attachment is used in the fastening of the substantially U-shaped cavity to an inner facing side of the vertical framing member, and wherein the support or attachment has a substantially L-shaped profile and is positioned so that a gap between the U-shaped cavity and the vertical framing member is closed due to an architectural structure of the unitized panel assembled within the exterior dynamic curtain wall. 6. The process according to claim 1 , further comprising installing a thermally resistant material into the substantially U-shaped cavity, wherein the thermally resistant material is a thermally resistant flexible mineral wool material to facilitate placement thereof into the substantially U-shaped cavity. 7. The process according to claim 1 , wherein the 5-sided box pan has a depth of at least 3 inches and a height of at least 6 inches. 8. The process according to claim 1 , wherein a back of the U-shaped cavity is positioned spatially disposed from an interior wall surface of the exterior dynamic curtain wall. 9. The process according to claim 8 , wherein the exterior dynamic curtain wall comprises a vision glass infill, and wherein the back of the U-shaped cavity is positioned spatially disposed from an inner surface of the vision glass infill. 10. A unitized panel assembled according to the process of claim 1 . 11. A process for installing the unitized panel according to claim 8 to improve fire stopping at a safing slot of an exterior dynamic curtain wall assembly, comprising: hanging the unitized panel to a building structure; installing a thermally resistant material in the safing slot; and applying an outer fire retardant coating positioned across the thermally resistant material installed in the safing slot and the adjacent portions of the vertical and horizontal framing members and a floor located there adjacent. 12. The process according to claim 11 , wherein the outer fire retardant coating has a wet film thickness of at least ⅛ inch or 2 mm. 13. The process according to claim 11 , wherein the outer fire retardant coating is a water-based or silicone-based outer fire retardant coating. 14. The process according to claim 11 , wherein the outer fire retardant coating is in the form of at least one selected from the group consisting of an emulsion, spray, coating, foam, paint, and mastic. 15. A building construction, comprising: a curtain wall construction, defined by an interior wall surface, including one or more framing members, and at least one floor, spatially disposed from the interior wall surface of the curtain wall construction, thereby defining a safing slot, extending between the interior wall surface of the curtain wall construction and an outer edge of the floor, wherein the curtain wall construction comprises the unitized panel according to claim 10 . 16. A method for acoustically insulating and sealing of a safing slot of a curtain wall structure, the method comprising: installing the unitized panel according to claim 10 to the curtain wall structure.

Assignees

Inventors

Classifications

  • comprising panels attached to the structure through mullions or transoms {(E04B2/885 takes precedence)} · CPC title

  • E04B1/948Primary

    Fire-proof sealings or joints (for doors or windows E06B5/164) · CPC title

  • comprising panels directly attached to the structure {(E04B2/885 takes precedence)} · CPC title

  • E04B1/7675Primary

    Insulating linings for the interior face of exterior walls · CPC title

  • Details of the adhesive connection of the insulation to the wall · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US11002007B2 cover?
Described is an approved dynamic construction for effectively thermally insulating and sealing of a safing slot between a floor of a building and an exterior wall construction wherein the exterior wall construction comprises a curtain wall configuration defined by an interior wall glass surface including one or more aluminum framing members. In particular, a process for assembling a unitized pa…
Who is the assignee on this patent?
Hilti Ag
What technology area does this patent fall under?
Primary CPC classification E04B1/948. Mapped technology areas include Fixed Constructions.
When was this patent published?
Publication date Tue May 11 2021 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 6 related publications on this page (citations in our corpus or others sharing the same primary CPC).