Power management of high-current fast-charging battery

US10988049B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-10988049-B2
Application numberUS-201916414294-A
CountryUS
Kind codeB2
Filing dateMay 16, 2019
Priority dateMay 16, 2019
Publication dateApr 27, 2021
Grant dateApr 27, 2021

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

Powerflow is managed using a method, e.g., in a powertrain system having a multi-pack rechargeable energy storage system (RESS) with parallel battery packs. Each pack has a corresponding maximum electrical (current or voltage) limit. The method includes predicting a corresponding terminal voltage for each pack using the corresponding maximum electrical limit. The method includes selecting a terminal voltage as a selected voltage based on a requested operating mode, including selecting a maximum of the terminal voltages when the requested operating mode is a discharging mode and a minimum of the same when the requested operating mode is a charging mode. A pack current through each pack is predicted using the selected voltage and a corresponding battery state space model. A total power capability of the RESS is predicted over a predetermined prediction horizon using the selected voltage, with the operating mode controlled over the prediction horizon via the controller.

First claim

Opening claim text (preview).

What is claimed is: 1. A method for managing powerflow of a multi-pack rechargeable energy storage system (RESS) having a parallel-connected first battery pack and second battery pack with different characteristics, wherein the first battery pack and the second battery pack have respective maximum current limits, the method comprising: predicting a corresponding first terminal voltage and second terminal voltage for the first battery pack and the second battery pack, respectively, via a controller using the respective maximum current limits; receiving, via the controller, a requested operating mode of the multi-pack RESS, wherein the requested operating mode is either a charging mode or a discharging mode of the multi-pack RESS; selecting the first terminal voltage or the second terminal voltage as a selected voltage based on the requested operating mode, including selecting a maximum of the first terminal voltage or the second terminal voltage when the requested operating mode is the discharging mode, and selecting a minimum of the first terminal voltage or the second terminal voltage when the requested operating mode is the charging mode; predicting a first pack current and a second pack current flowing through the first battery pack and the second battery pack, respectively, using the selected voltage and corresponding battery state space models; predicting a total power capability of the multi-pack RESS over a predetermined prediction horizon using the first pack current and the second pack current to thereby generate a plurality of predicted power capability values; and controlling the requested operating mode over the predetermined prediction horizon, via the controller, using the plurality of predicted power capability values. 2. The method of claim 1 , the method further comprising: receiving a fast-charging voltage and current from an offboard fast-charging station, via the multi-pack RESS, during a fast-charging operation; wherein the requested operating mode is the charging mode, and controlling the requested operating mode occurs during the charging mode by controlling the fast-charging operation via the controller. 3. The method of claim 1 , wherein the requested operating mode is the discharging mode, and wherein controlling the requested operating mode includes energizing a rotary electric machine via the multi-pack RESS and a power inverter module. 4. The method of claim 1 , wherein the predetermined prediction horizon includes at least five future time points. 5. The method of claim 1 , wherein the controller includes hierarchically-arranged first and second controllers, predicting the second terminal voltage is accomplished via the second controller using a second one of the battery state space models and communicated to the first controller, predicting the first terminal voltage is accomplished via the first controller using a first of the battery state space models, and predicting the total power capability and controlling the requested operating mode is accomplished via the first controller. 6. The method of claim 5 , wherein the first and second controllers are first and second vehicle integration control modules (VICMs) of a motor vehicle. 7. The method of claim 1 , wherein the multi-pack RESS includes a third battery pack connected to the first and second battery packs via a DC-DC converter, such that the third battery pack has a pack voltage that is less than a pack voltage of the first and second battery packs. 8. The method of claim 7 , wherein the third battery pack has a pack voltage of 48V and the first and second battery packs have a pack voltage of at least 370V. 9. A powertrain system comprising: a multi-pack rechargeable energy storage system (RESS) having: a parallel-connected first battery pack and second battery pack; and a first pack sensor and a second pack sensor connected to the respective first and second battery packs, each of the first pack sensor and the second pack sensor being configured to measure a corresponding pack current, voltage, and temperature of the first battery pack and the second battery pack; a power inverter module (PIM) connected to the multi-pack RESS; a rotary electric machine connected to the PIM and having an output member coupled to a load; and a controller in communication with the first pack sensor and the second pack sensor, and operable for managing powerflow of the multi-pack RESS using the measured pack current, voltage, and temperature, wherein the controller is programmed with a corresponding maximum current limit of the first battery pack and the second battery pack, and is configured to: predict a first terminal voltage and a second terminal voltage for the first battery pack and the second battery pack, respectively, using the corresponding maximum current limit; receive a requested operating mode of the multi-pack RESS, wherein the requested operating mode is either a charging mode or a discharging mode of the multi-pack RESS; select the first terminal voltage or the second terminal voltage as a selected voltage based on the requested operating mode, the selected voltage including a maximum of the first terminal voltage or the second terminal voltage when the requested operating mode is the discharging mode and a minimum of the first terminal voltage or the second terminal voltage when the requested operating mode is the charging mode; predict a pack current flowing through each of the first battery pack and the second battery pack using the selected voltage and corresponding battery state space models; predict a total power capability of the multi-pack RESS over a predetermined prediction horizon using the pack current of the first battery pack and the second battery pack to thereby generate a plurality of predicted power capability values; and control the requested operating mode over the predetermined prediction horizon using the plurality of predicted power capability values. 10. The powertrain system of claim 9 , wherein the multi-pack RESS is configured to receive a fast-charging voltage and current from an offboard fast-charging station during a fast-charging operation, the requested operating mode is the charging mode, and the controller is configured to control the fast-charging operation during the charging mode. 11. The powertrain system of claim 9 , wherein the requested operating mode is the discharging mode, and wherein the controller is configured to control the requested operating mode by energizing the rotary electric machine via the multi-pack RESS and the power inverter module. 12. The powertrain system of claim 9 , wherein the predetermined prediction horizon includes at least five future time points. 13. The powertrain system of claim 12 , wherein relative to a current time point (k)=0 seconds (s), the at least five future time points include k=0.1 s, 1 s, 2 s, 10 s, and 20 s. 14. The powertrain system of claim 9 , wherein the controller includes hierarchically-arranged first and second controllers, the second controller is configured to predict the second terminal voltage using a second one of the battery state space models and communicate the second terminal voltage to the first controller, and the first controller is configured to predict the terminal voltage using a first one of the battery state space models, predict the total power capability, and control the requested operating mode. 15. The powertrain system of claim 14 , wherein the first and second controllers are respective first and second vehicle integration control modules (VICMs) of a motor vehicle, and wherein the load is a set of road wh

Assignees

Inventors

Classifications

  • acting upon multiple batteries simultaneously or sequentially · CPC title

  • H02J7/96Primary

    in response to battery voltage · CPC title

  • B60L58/21Primary

    having the same nominal voltage · CPC title

  • responding to state of charge [SoC] · CPC title

  • DC charging controlled by the charging station, e.g. mode 4 · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US10988049B2 cover?
Powerflow is managed using a method, e.g., in a powertrain system having a multi-pack rechargeable energy storage system (RESS) with parallel battery packs. Each pack has a corresponding maximum electrical (current or voltage) limit. The method includes predicting a corresponding terminal voltage for each pack using the corresponding maximum electrical limit. The method includes selecting a ter…
Who is the assignee on this patent?
Gm Global Tech Operations Llc
What technology area does this patent fall under?
Primary CPC classification H02J7/96. Mapped technology areas include Electricity.
When was this patent published?
Publication date Tue Apr 27 2021 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 6 related publications on this page (citations in our corpus or others sharing the same primary CPC).