Selective Oxy-Fuel Boost Burner System and Method for a Regenerative Furnace
US-2016348904-A1 · Dec 1, 2016 · US
US10982843B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-10982843-B2 |
| Application number | US-201716314528-A |
| Country | US |
| Kind code | B2 |
| Filing date | Jun 29, 2017 |
| Priority date | Jul 1, 2016 |
| Publication date | Apr 20, 2021 |
| Grant date | Apr 20, 2021 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
The present invention relates to an over fire air arrangement for a furnace (1), the furnace (1) having opposing first wall (4) and second wall (6) and opposing first side wall (5) and second side wall (7) between the first and second walls (4, 6) for forming a furnace enclosure (2). The over fire air arrangement comprising at least one first over fire air port (20) provided to the first wall (4) for supplying a first over fire air flow (40) into the furnace (1) and at least one first additional over fire air port (50) provided to at least one of the first and second side walls (5, 7) in the vicinity of the first wall (4), the at least one first additional over fire air port (50) being arranged to supplying a first additional over fire air flow (60) into the furnace (1) transversely to the first over fire air flow (40).
Opening claim text (preview).
The invention claimed is: 1. An over fire air arrangement for a bubbling fluidized bed furnace, the furnace having opposing first wall and second wall and opposing first side wall and second side wall between the first and second walls for forming a furnace enclosure, the over fire air arrangement comprising: at least one first over fire air port provided to the first wall for supplying a first over fire air flow into the furnace, at least one second over fire air port provided to the second wall for supplying a first over fire air flow into the furnace, at least one first additional over fire air port provided to the first side wall in the vicinity of the first wall so that the at least one first additional over fire air port is arranged closer to the first wall than its distance to a vertical centre line of the furnace enclosure, the at least one first additional over fire air port being arranged to supply along the first wall a first additional over fire air flow into the furnace transversely to the first over fire air flow, at least one further first additional over fire air port provided to the second side wall in the vicinity of the first wall so that the at least one further first additional over fire air port is arranged closer to the first wall than its distance to a vertical centre line of the furnace enclosure, the at least one further first additional over fire air port being arranged to supply along the first wall a further first additional over fire air flow into the furnace transversely to the first over fire air flow, at least one second additional over fire air port provided to the first side wall in the vicinity of the second wall so that the at least one second additional over fire air port is arranged closer to the second wall than its distance to the vertical centre line of the furnace enclosure, the at least one second additional over fire air port being arranged to supply along the second wall a second additional over fire air flow into the furnace transversely to the second over fire air flow, and at least one further second additional over fire air port provided to the second side wall in the vicinity of the second wall so that the at least one further second additional over fire air port is arranged closer to the second wall than its distance to the vertical centre line of the furnace enclosure, the at least one further second additional over fire air port being arranged to supply along the second wall, a further second additional over fire air flow into the furnace transversely to the second over fire air flow, wherein at least one first secondary over fire air port provided to the first wall above the first over fire air port and above the at least one first additional over fire air port, at least one second secondary over fire air port provided to the second wall above the second over fire air port and above the at least one second additional over fire air port, the at least one first additional over fire air port, the at least one further first additional over fire air port, the at least one second additional over fire air port and the at least one further second additional over fire air port being in vertical direction above the at least one first over fire air port and the at least one second over fire air port and below the at least one first secondary over fire air port and the at least one second secondary over fire air port, at least one first secondary additional over fire air port provided to the first side wall in the vicinity of the first wall so that the at least one first secondary additional over fire air port is arranged closer to the first wall than its distance to the vertical centre line of the furnace enclosure, the at least one first secondary additional over fire air port being positioned in the vertical direction above the at least one first additional over fire air port and arranged to supply along the first wall a first secondary additional over fire air flow into the furnace transversely to the first over fire air flow, at least one further first secondary additional over fire air port provided to the second side wall in the vicinity of the first wall so that the at least one further first secondary additional over fire air port is arranged closer to the first wall than its distance to the vertical centre line of the furnace enclosure, the at least one further first secondary additional over fire air port being positioned in the vertical direction above the at least one further first additional over fire air port and arranged to supply along the first wall a further first secondary additional over fire air flow into the furnace transversely to the first over fire air flow, at least one second secondary additional over fire air port provided to the first side wall in the vicinity of the second wall so that the at least one second secondary additional over fire air port is arranged closer to the second wall than its distance to the vertical centre line of the furnace enclosure, the at least one second secondary additional over fire air port being positioned in vertical direction above the at least one second addition-al over fire air port and arranged to supply along the second wall a second secondary additional over fire air flow into the furnace transversely to the second over fire air flow, and at least one further second secondary additional over fire air port provided to the second side wall in the vicinity of the second wall so that the at least one second secondary additional over fire air port is arranged closer to the second wall than its distance to the vertical centre line of the furnace enclosure, the at least one further second secondary additional over fire air port being positioned in vertical direction above the at least one second additional over fire air port and arranged to supply along the second wall a further second secondary additional over fire air flow into the furnace transversely to the second over fire air flow, and the at least one first secondary additional over fire air port, the at least one further first secondary additional over fire air port, the at least one second secondary additional over fire air port and the at least one further second secondary additional over fire air port being in vertical direction above the at least one first secondary over fire air port and the at least one second secondary over fire air port. 2. An over fire air arrangement of according to claim 1 , wherein the first and second additional over fire air ports are in vertical direction less than 2.0 m above the first and second over fire air ports; or the first and second additional over fire air ports are in vertical direction between 0.3-1.0 m above the first and second over fire air ports. 3. A bubbling fluidized bed furnace for combustion of fuels, the furnace comprising: a bottom; first and second opposing walls extending in vertical direction from the bottom; first and second opposing side walls between the first and second opposing walls, the first and second opposing walls form together with the first and second opposing side walls a furnace enclosure, a lower furnace comprising a) at least one primary combustion air supply port; or b) at least one primary burner and at least one secondary burner in vertical direction above the at least one primary burner for providing staged combustion, wherein the furnace comprises an over fire arrangement according to claim 1 .
Disposition of burners · CPC title
in vertical direction, e.g. alternating lean and rich zones · CPC title
the air being submitted to a rotary or spinning motion (cyclonic combustion chamber F23C3/006) · CPC title
with fuel supply in stages · CPC title
Burners for combustion of pulverulent fuel · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.