Methods and Apparatuses to Generate a Formation Model
US-2016245952-A1 · Aug 25, 2016 · US
US10976463B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-10976463-B2 |
| Application number | US-201515762153-A |
| Country | US |
| Kind code | B2 |
| Filing date | Nov 4, 2015 |
| Priority date | Nov 4, 2015 |
| Publication date | Apr 13, 2021 |
| Grant date | Apr 13, 2021 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
A system includes an electromagnetic logging tool that transmits an electromagnetic signal as the tool is conveyed along a borehole through a formation. The system further includes a processing system that measures a first signal level in response to the tool being at a first measured depth, determines a first conductance based on the first signal level, measures a second signal level in response to the tool being at a second measured depth greater than the first measured depth, the second measured depth and the first measured depth defining a formation interval there between, determines a second conductance based on the second signal level, and assigns a uniform resistivity value to the formation interval based on the first conductance and the second conductance.
Opening claim text (preview).
What is claimed is: 1. A method for determining formation resistivity along a wellbore, comprising: disposing a bottom hole assembly (BHA) into a formation at a first measured depth wherein the BHA includes a gap subassembly; generating a first signal level from the BHA by a power source alternating a voltage across the gap subassembly; measuring the first signal level with one or more electrodes or one or more magnetic field sensors disposed on earth's surface in response to the BHA being at the first measured depth; determining a first conductance based on the first signal level; moving the BHA to a second measured depth greater than the first measured depth during drilling operations, the second measured depth and the first measured depth defining a formation interval there between; generating a second signal level from the BHA by the power source alternating the voltage across the gap subassembly; measuring a second signal level with the one or more electrodes or the one or more magnetic field sensors disposed on earth's surface in response to the BHA being at the second measured depth; determining a second conductance based on the second signal level; and assigning a uniform resistivity value to the formation interval based on the first conductance and the second conductance. 2. The method of claim 1 , further comprising: disposing the BHA at a third measured depth greater than the second measured depth, the third measured depth and the second measured depth defining a second formation interval there between; measuring a third signal level in response to the BHA being at the third measured depth; determining a third conductance based on the third signal level; assigning a second uniform resistivity value to the second formation interval based on the second conductance and the third conductance. 3. The method of claim 1 , wherein measuring the first signal level comprises measuring an electromagnetic field at the earth surface for the wellbore. 4. The method of claim 3 , wherein measuring the electromagnetic field at the earth surface comprises measuring the electric field along a particular length of the earth surface. 5. The method of claim 1 , wherein determining the first conductance comprises applying a formation conductivity model. 6. The method of claim 5 , wherein: the formation conductivity model accounts for at least a size of the gap subassembly, an outer diameter of a drill collar, or a thickness of a wall of the drill collar. 7. A logging system that comprises: a bottom hole assembly (BHA) comprising: a gap subassembly; and a power source that is configured to alternate voltage across the gap subassembly to generate an electromagnetic signal in a formation; and one or more electrodes or one or more magnetic field sensors disposed on earth's surface that measure a first signal level in response to the tool being at a first measured depth and measure a second signal level in response to the tool being at a second measured depth greater than the first measured depth; and a processing system that is configured to determine a first conductance based on the first signal level, determine a second conductance based on the second signal level, and assigns a uniform resistivity value to the formation interval based on the first conductance and the second conductance. 8. The logging system of claim 7 , wherein the processing system further measures a third signal level in response to the tool being at a third measured depth greater than the second measured depth, the third measured depth and the second measured depth defining a second formation interval there between, determines a third conductance based on the third signal level, and assigns a second uniform resistivity value to the second formation interval based on the second conductance and the third conductance. 9. The logging system of claim 7 , wherein the processing system measures the first signal level by measuring an electromagnetic field at the earth surface. 10. The logging system of claim 9 , wherein the processing system measures the electromagnetic field at the earth surface by measuring the electric field along a particular length of the earth surface. 11. The logging system of claim 1 , further comprising a conductor extending along the particular length of the earth surface, wherein the processing system measures the electromagnetic field along the particular length of the earth surface using values of the voltage sensed by the conductor. 12. The logging system of claim 7 , wherein the processing system determines the first conductance by applying a formation conductivity model. 13. The logging system of claim 12 , wherein: the tool comprises a bottom hole assembly comprising a gap subassembly and a drill collar; and the formation conductivity model accounts for at least a size of the gap subassembly, an outer diameter of the drill collar, or a thickness of a wall of the drill collar. 14. The logging system of claim 7 , wherein the electromagnetic logging tool is a logging-while-drilling tool.
operating with electromagnetic waves · CPC title
Processing data, e.g. for analysis, for interpretation, for correction · CPC title
by investigating resistance · CPC title
operating with magnetic or electric fields produced or modified either by the surrounding earth formation or by the detecting device (with electromagnetic waves G01V3/30) · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.