Aircraft comprising an electrical power distribution network

US10919639B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-10919639-B2
Application numberUS-201816050461-A
CountryUS
Kind codeB2
Filing dateJul 31, 2018
Priority dateAug 2, 2017
Publication dateFeb 16, 2021
Grant dateFeb 16, 2021

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

An aircraft comprises a fuselage, at least a first electrical generator and a second electrical generator, a set of electrical equipment items distributed in the fuselage and an electrical power distribution network comprising a switching system and a set of buses. The buses comprise at least a first bus and a second bus extending, at least partly, in a longitudinal direction of the fuselage and following segregated paths in the fuselage. In a normal mode of operation, the switching system links the first electrical generator to the first bus and the second electrical generator to the second bus. Each bus comprises connection points at different locations distributed along its length and each of the electrical equipment items is linked to a connection point of a bus via a local electrical power supply link.

First claim

Opening claim text (preview).

The invention claimed is: 1. An aircraft comprising: a fuselage; a set of electrical generators, comprising at least a first electrical generator and a second electrical generator; a set of electrical equipment items, distributed in the fuselage; and an electrical power distribution network comprising: a set of buses, comprising at least a first bus and a second bus; and a switching system, wherein: the first bus and the second bus extend a longitudinal length of a substantially straight portion of the fuselage; the first bus and the second bus follow segregated paths in the fuselage; the switching system is linked electrically to the first electrical generator and to the second electrical generator, and to the first bus and to the second bus; the switching system comprises a normal mode of operation, in which the switching system is configured to electrically link the first electrical generator to the first bus and the second electrical generator to the second bus; each bus of the set of buses comprises connection points at different locations distributed along its length; and each of the electrical equipment items of the set of electrical equipment items is linked to a connection point of a bus of the set of buses, via a local electrical power supply link; wherein the electrical power distribution network further comprises a third bus and a fourth bus which extend, at least partly, in a longitudinal direction of the fuselage, the first, second, third and fourth buses following segregated paths in the fuselage of the aircraft, and wherein the set of electrical generators further comprises a third electrical generator and a fourth electrical generator and, in the normal mode of operation, the switching system is configured to electrically link the third electrical generator to the third bus and the fourth electrical generator to the fourth bus. 2. The aircraft according to claim 1 , wherein the first bus extends also partly in a first wing of the aircraft and the second bus extends also partly in a second wing of the aircraft. 3. The aircraft according to claim 1 , wherein the first electrical generator and the second electrical generator are linked electrically to the switching system via buses. 4. The aircraft according to claim 3 , wherein the first electrical generator is linked electrically to the switching system via dedicated conductors of the first bus and the second electrical generator is linked electrically to the switching system via dedicated conductors of the second bus. 5. The aircraft according to claim 1 , wherein the switching system comprises a reconfigured mode of operation, activatable in a case of an occurrence of a failure in the electrical power distribution network, in which the switching system is configured to at least one of: establish electrical links between electrical generators of the set of electrical generators and the buses of the set of buses, these electrical links being modified relative to electrical links established in the normal mode of operation; or establish electrical links between buses of the set of buses. 6. The aircraft according to claim 1 , wherein the switching system comprises a main switching device and at least one secondary switching device remote from the main switching device. 7. The aircraft according to claim 5 , wherein the switching system comprises a main switching device and at least one secondary switching device remote from the main switching device, and, in the reconfigured mode of operation of the switching system, the at least one secondary switching device is capable of being controlled to establish one or more electrical links between buses of the set of buses. 8. The aircraft according to claim 1 , wherein at least one bus of the set of buses comprises at least two modular sections arranged end-to-end and linked electrically to one another. 9. The aircraft according to claim 8 , wherein the switching system comprises a main switching device and at least one secondary switching device remote from the main switching device and wherein a secondary switching device is linked electrically to two consecutive modular sections of a bus, so as to establish electrical links between similar electrical conductors of the two modular sections in the normal mode of operation and to establish electrical links between electrical conductors of at least one of the two modular sections and electrical conductors of another bus, in the reconfigured mode of operation.

Assignees

Inventors

Classifications

  • for aircrafts · CPC title

  • Arrangements for on-board electric energy production, distribution, recovery or storage · CPC title

  • comprising box like supporting frames, e.g. pylons or arrangements for embracing the power plant · CPC title

  • B64C1/20Primary

    specially adapted for freight · CPC title

  • B64D41/00Primary

    Power installations for auxiliary purposes · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US10919639B2 cover?
An aircraft comprises a fuselage, at least a first electrical generator and a second electrical generator, a set of electrical equipment items distributed in the fuselage and an electrical power distribution network comprising a switching system and a set of buses. The buses comprise at least a first bus and a second bus extending, at least partly, in a longitudinal direction of the fuselage an…
Who is the assignee on this patent?
Airbus Operations Sas
What technology area does this patent fall under?
Primary CPC classification B64C1/20. Mapped technology areas include Operations & Transport.
When was this patent published?
Publication date Tue Feb 16 2021 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 2 related publications on this page (citations in our corpus or others sharing the same primary CPC).