Method and apparatus for allocating resource in wireless communication system

US10897749B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-10897749-B2
Application numberUS-201916382911-A
CountryUS
Kind codeB2
Filing dateApr 12, 2019
Priority dateApr 12, 2018
Publication dateJan 19, 2021
Grant dateJan 19, 2021

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

Disclosed is a method of allocating time resources of a downlink (DL) physical control channel, including scheduling transmission of DL data in a first time resource, and scheduling transmission of uplink (UL) data in a second time resource starting after the first time resource ends, wherein an end time point of the first time resource is changed based on an amount of the DL data and is less than or equal to a first maximum value.

First claim

Opening claim text (preview).

What is claimed is: 1. A method of allocating time resources of a downlink (DL) physical control channel by a base station (BS), the method comprising: allocating a first time resource for DL grant including information on at least one time resource used for transmission of DL data; transmitting the DL grant on the first time resource; allocating a second time resource for uplink (UL) grant including information on at least one time resource used for transmission of UL data, the second time resource starting after the first time resource ends; and transmitting the UL grant on the second time resource, wherein an end time point of the first time resource is changed based on an amount of the DL data, and wherein a duration of the first time resource is less than or equal to a first maximum value, wherein the first time resource and the second time resource are included in data resource area for DL data transmission. 2. The method of claim 1 , wherein the first maximum value is based on at least one of a start time point of the first time resource and a number of repetitive transmissions of the DL data. 3. The method of claim 1 , wherein allocating the first time resource for DL grant comprises: determining whether there is first data to be transmitted among the DL data; if there is the first data to be transmitted among the DL data, transmitting the DL grant on the first time resource, and if there is no first data to be transmitted among the DL data, changing the end time point of the first time resource. 4. The method of claim 3 , wherein determining whether there is the first data to be transmitted among the DL data is performed in every subframe. 5. The method of claim 4 , wherein the DL data is transmitted to at least one enhanced machine type communication (eMTC) UE. 6. The method of claim 3 , wherein the end time point of the first time resource is changed according to whether transmission frequency resources of the first data to be transmitted are equal to transmission frequency resources of the DL grant. 7. The method of claim 1 , wherein allocating the second time resource for UL grant comprises: determining whether there is second data to be received among the UL data; if there is the second data to be received among the UL data, transmitting the UL grant on the second time resource, and if there is no second data to be received among the UL data changing an end time point of the second time resource, wherein the end time point of the second time resource is changed based on an amount of the UL data, and wherein a duration of the second time resource is less than or equal to a second maximum value. 8. The method of claim 7 , wherein the second maximum value is based on at least one of a start time point of the second time resource and a number of repetitive transmissions of the UL data. 9. The method of claim 7 , wherein determining whether there is the second data to be received among the UL data is performed in every subframe. 10. The method of claim 9 , wherein the UL data is received from at least one enhanced machine type communication (eMTC) UE. 11. A base station (BS) for allocating time resources of a downlink (DL) physical control channel, the BS comprising: a transceiver; and a controller configured to allocate a first time resource for DL grant including information on at least one time resource used for transmission of DL data; control the transceiver to transmit the DL grant on the first time resource; allocate a second time resource for uplink (UL) grant including information on at least one time resource used for transmission of UL data, the second time resource starting after the first time resource ends; and control the transceiver to transmit the UL grant on the second time resource, wherein an end time point of the first time resource is changed based on an amount of the DL data, and wherein a duration of the first time resource is less than or equal to a first maximum value, wherein the first time resource and the second time resource are included in data resource area for DL data transmission. 12. The BS of claim 11 , wherein the first maximum value is based on at least one of a start time point of the first time resource and a number of repetitive transmissions of the DL data. 13. The BS of claim 11 , wherein the controller is further configured to determine whether there is first data to be transmitted among the DL data; if there is the first data to be transmitted among the DL data, control the transceiver to transmit the DL grant on the first time resource; and if there is no first data to be transmitted among the DL data, change the end time point of the first time resource. 14. The BS of claim 13 , wherein the controller is further configured to determine whether there is the first data to be transmitted among the DL data in every subframe. 15. The BS of claim 13 , wherein the controller is further configured to change the end time point of the first time resource according to whether transmission frequency resources of the first data to be transmitted are equal to transmission frequency resources of the DL grant. 16. The BS of claim 11 , wherein the controller is further configured to determine whether there is second data to be received among the UL data; if there is the second data to be received among the UL data, control the transceiver to transmit the UL grant on the second time resource; and if there is no second data to be received among the UL data, change an end time point of the second time resource, wherein the end time point of the second time resource is changed based on an amount of the UL data, and wherein a duration of the second time resource is less than or equal to a second maximum value. 17. The BS of claim 16 , wherein the second maximum value is based on at least one of a start time point of the second time resource and a number of repetitive transmissions of the UL data. 18. The BS of claim 16 , wherein the controller is further configured to determine whether there is the second data to be received among the UL data in every subframe. 19. The BS of claim 11 , wherein the DL data is transmitted to at least one enhanced machine type communication (eMTC) UE. 20. The BS of claim 18 , wherein the UL data is received from at least one enhanced machine type communication (eMTC) UE.

Assignees

Inventors

Classifications

  • Services for machine-to-machine communication [M2M] or machine type communication [MTC] · CPC title

  • the control data signalling from the physical layer, e.g. DCI signalling · CPC title

  • Resources in time domain, e.g. slots or frames · CPC title

  • H04W72/04Primary

    Wireless resource allocation · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US10897749B2 cover?
Disclosed is a method of allocating time resources of a downlink (DL) physical control channel, including scheduling transmission of DL data in a first time resource, and scheduling transmission of uplink (UL) data in a second time resource starting after the first time resource ends, wherein an end time point of the first time resource is changed based on an amount of the DL data and is less t…
Who is the assignee on this patent?
Samsung Electronics Co Ltd
What technology area does this patent fall under?
Primary CPC classification H04W72/0446. Mapped technology areas include Electricity.
When was this patent published?
Publication date Tue Jan 19 2021 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 1 related publication on this page (citations in our corpus or others sharing the same primary CPC).