Industrial internet connected control system
US-2018173205-A1 · Jun 21, 2018 · US
US10865772B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-10865772-B2 |
| Application number | US-201815936485-A |
| Country | US |
| Kind code | B2 |
| Filing date | Mar 27, 2018 |
| Priority date | Jul 7, 2017 |
| Publication date | Dec 15, 2020 |
| Grant date | Dec 15, 2020 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
A data collection system of at least one wind turbine power generating apparatus includes: at least one wind turbine controller including a control part for controlling each wind turbine power generating apparatus, a representative data memory part for storing representative data of at least one parameter indicating a state or operation history of the at least one wind turbine power generating apparatus, and a representative data selection part configured to obtain data of the at least one parameter once in every control calculation cycle and determine whether to store the obtained data as the representative data for every control calculation cycle; and a data collection part configured to collect, from each wind turbine controller, the representative data of the at least one parameter related to the state of each wind turbine power generating apparatus stored in the representative data memory part of each wind turbine controller.
Opening claim text (preview).
The invention claimed is: 1. A data collection system of a wind turbine power generation facility including wind turbine power generating apparatuses, the data collection system comprising: a plurality of wind turbine controllers provided for the wind turbine power generating apparatuses, respectively, each of the wind turbine controllers including: a control part for controlling a corresponding one of the wind turbine power generating apparatuses, the control part being configured to, once in every control calculation cycle, perform calculation for control of the corresponding one of the wind turbine power generating apparatuses and send a control signal based on the calculation to the corresponding one of the wind turbine power generating apparatuses; a representative data memory part for storing representative data related to at least one parameter indicating a state or an operation history of the corresponding one of the wind turbine power generating apparatuses; a representative data selection part configured to, once in every control calculation cycle of the control part, obtain data related to the at least one parameter and, once in every control calculation cycle of the control part, determine whether to store the obtained data of the at least one parameter as the representative data of the at least one parameter in the representative data memory part; a calculator serving as a data collection part configured to collect, from each of the wind turbine controllers, the representative data of the at least one parameter related to the state of the wind turbine power generating apparatus stored in the representative data memory part of said each of the wind turbine controllers; and a local network via which the calculator is connected to the wind turbine controllers, wherein each of the plurality of wind turbine controllers is configured to: acquire, from the data related to the at least one parameter during a predetermined period including a time of occurrence of an event related to and impacting one of the plurality wind turbine power generating apparatuses corresponding to one of the plurality of wind turbine controllers, a statistic value as the representative data, and store the representative data in the representative data memory part. 2. The data collection system of a wind turbine power generation facility according to claim 1 , wherein the representative data selection part is configured to determine, when the event related to the wind turbine power generating apparatuses occurs, that it is necessary to store, in the representative data memory part, data satisfying a predetermined condition from among the data at the time of occurrence of the event or the data in the predetermined period including before and after the time of occurrence of the event, as the representative data. 3. The data collection system of a wind turbine power generation facility according to claim 1 , wherein the event is at least one of a starting, a shutdown, a connection to an electric grid, a disconnection from the electric grid, a detection of a state change, trip, or a pre-set command to start recording during shutdown, of the wind turbine power generating apparatuses. 4. The data collection system of a wind turbine power generation facility according to claim 1 , wherein the event is an excess of a load applied to the wind turbine power generating apparatuses over a predetermined value. 5. The data collection system of a wind turbine power generation facility according to claim 1 , wherein the event is an excess of a change amount of a system voltage of an electric power system to which the wind turbine power generating apparatuses are connected over a predetermined value. 6. The data collection system of a wind turbine power generation facility according to claim 1 , wherein the representative data memory part is configured to store the time of occurrence of the event obtained by an internal clock of the control part, together with the representative data selected by the representative data selection part, every time the event occurs. 7. The data collection system of a wind turbine power generation facility according to claim 1 , further comprising: a state monitoring part configured to monitor the state of each of the wind turbine power generating apparatuses on the basis of the representative data collected by the data collection part, wherein the representative data memory part is configured to store the representative data selected by the representative data selection part every time the event occurs, wherein the data collection part is configured to collect a plurality of sets of the representative data stored in the representative data memory part every time the event occurs, and wherein the state monitoring part is configured to detect an abnormality of each of the wind turbine power generating apparatuses by comparing the plurality of sets of the representative data. 8. The data collection system of a wind turbine power generation facility according to claim 1 , further comprising: a state monitoring part configured to monitor the state of each of the wind turbine power generating apparatuses on the basis of the representative data collected by the data collection part, wherein the data collection part is configured to collect the representative data stored in the representative data memory part of each of the wind turbine power generating apparatuses, and wherein the state monitoring part is configured to detect an abnormality of each of the wind turbine power generating apparatuses by comparing the representative data of the wind turbine power generating apparatuses. 9. The data collection system of a wind turbine power generation facility according to claim 1 , further comprising: a state monitoring part configured to monitor the state of the wind turbine power generating apparatus on the basis of the representative data collected by the data collection part, wherein the local network is connected to the state monitoring part via the Internet, and wherein the data collection part is configured to transmit the representative data collected from each of the wind turbine controllers to the state monitoring part via the Internet. 10. The data collection system of a wind turbine power generation facility according to claim 1 , further comprising: a monitoring control part for performing operation control or state monitoring for the wind turbine power generating apparatuses, wherein the monitoring control part is configured to receive monitoring control data from the wind turbine power generating apparatuses once in every cycle which is longer than the control calculation cycle of the control part. 11. A wind turbine power generation facility, comprising: wind turbine power generating apparatuses; and the data collection system according to claim 1 , configured to collect representative data related to at least one parameter indicating a state or an operation history of the wind turbine power generating apparatuses. 12. A method of collecting data of and controlling a wind turbine power generation facility, the wind turbine power generation facility including the wind turbine power generating apparatuses which include wind turbine controllers, respectively, each of the wind turbine controllers including a control part for controlling a corresponding one of the wind turbine power generating apparatuses, the control part being configured to, once in every control calculation cycle, the method comprising: a controlling step of, by using the control part, performing calculation for control of the corresponding one of the wind turbine power generat
by measures acting on the electrical generator · CPC title
Monitoring or testing of wind motors, e.g. diagnostics (testing during commissioning of wind motors F03D13/30) · CPC title
in relation to the state of the electric grid · CPC title
controlling wind farms · CPC title
Wind turbines with rotation axis in wind direction · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.