Changing set points in a resonant system

US10831218B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-10831218-B2
Application numberUS-201916564936-A
CountryUS
Kind codeB2
Filing dateSep 9, 2019
Priority dateJun 27, 2013
Publication dateNov 10, 2020
Grant dateNov 10, 2020

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A method for changing a set point of a system where period of a dominant resonance of the system is determined, a change profile for the set point change is processed; a time period for the set point change based on the period of the dominant resonance in order to minimize excitation of the dominant resonance is also processed; and the set point change is actioned according to the processed change profile and the time period.

First claim

Opening claim text (preview).

The invention claimed is: 1. A method for changing a set point of a system in a borehole, comprising: determining the period of a dominant resonance of the system; identifying a change profile for the set point change; determining a time period for the set point change based on the period of the dominant resonance to control the dominant resonance; and performing the set point change according to the change profile and the time period. 2. The method of claim 1 , wherein the time period is a multiple of the period of the dominant resonance. 3. The method of claim 2 , wherein the change profile is a linear change profile, and the time period is an integer multiple of the period of the dominant resonance. 4. The method of claim 2 , wherein the time derivative of the change profile has a half-period of a sine-wave, and the time period is an integer-plus-a-half multiple of the period of the dominant resonance. 5. The method of claim 1 , wherein the change profile is symmetric about a mid-time of a change. 6. The method of claim 1 , wherein the determination of the time period for the set point change is performed by taking the Fourier transform of the time derivative of the change profile. 7. The method of claim 1 , wherein the borehole system is a drillstring. 8. The method of claim 1 , wherein the borehole system is a wireline. 9. The method of claim 1 , wherein the borehole system is an electro-submersible pump. 10. A control system for changing a set point of a system in a borehole, comprising: a processor configured to: determine the period of a dominant resonance of the system; process a change profile for the set point change from a system property; and determine a time period for the set point change based on the period of the dominant resonance to control the dominant resonance; and a controller configured to control the system to perform the set point change according to the change profile and the time period. 11. The control system of claim 10 , further comprising one or more sensors to sense properties of the system or the borehole or both, wherein the determination of the period of the dominant resonance of the system or the processing of the change profile or both are based on the sensed properties. 12. The system of claim 10 wherein the system comprises a rig or a tool. 13. The control system of claim 10 , wherein the system comprises a managed pressure drilling system. 14. The control system of claim 10 , wherein the system comprises a drilling system. 15. The control system of claim 10 , wherein the system comprises an automated system for operating one or more systems in a borehole.

Assignees

Inventors

Classifications

  • E21B44/00Primary

    Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions · CPC title

  • Measuring stresses in a pipe string or casing (for locating blocked portions of pipes E21B47/09) · CPC title

  • G05D19/02Primary

    characterised by the use of electric means · CPC title

  • electric · CPC title

  • Survey of boreholes or wells (monitoring pressure or flow of drilling fluid E21B21/08) · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US10831218B2 cover?
A method for changing a set point of a system where period of a dominant resonance of the system is determined, a change profile for the set point change is processed; a time period for the set point change based on the period of the dominant resonance in order to minimize excitation of the dominant resonance is also processed; and the set point change is actioned according to the processed cha…
Who is the assignee on this patent?
Schlumberger Technology Corp
What technology area does this patent fall under?
Primary CPC classification E21B44/00. Mapped technology areas include Fixed Constructions.
When was this patent published?
Publication date Tue Nov 10 2020 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 2 related publications on this page (citations in our corpus or others sharing the same primary CPC).