Method for erecting a wind turbine and lifting beam for mounting a rotor blade of a wind turbine

US10823149B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-10823149-B2
Application numberUS-201716309028-A
CountryUS
Kind codeB2
Filing dateJun 19, 2017
Priority dateJun 23, 2016
Publication dateNov 3, 2020
Grant dateNov 3, 2020

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A method of erecting a wind power installation which has an aerodynamic rotor having rotor blade connections. A lifting beam having a ballast unit is fixed to a crane hook of a crane. A rotor blade is fixed to a second crane hook at an underside of the ballast unit by means of lifting cables. The lifting beam and the rotor blade are lifted by the crane for mounting the rotor blade at one of the rotor blade connections.

First claim

Opening claim text (preview).

The invention claimed is: 1. A method of erecting a wind power installation having an aerodynamic rotor blade having a plurality of rotor blade connections, the method comprising: selecting at least one ballast weight so that a predetermined ratio in meters squared per ton between a surface area of the rotor blade and a sum of both the at least one ballast weight and a weight of the rotor blade is equal to or less than 1; fixing the at least one ballast weight to a lifting beam; fixing the lifting beam with the at least one ballast weight to a crane hook of a crane; fixing a rotor blade by lifting cables to a second crane hook at an underside of the at least one ballast weight; and lifting the lifting beam with the at least one ballast weight and the rotor blade by the crane for mounting the rotor blade at one of the plurality of rotor blade connections. 2. The method according to claim 1 , comprising: prior to lifting the beam with the at least one ballast weight and the rotor blade by the crane, fixing a rotor blade root of the rotor blade to a hook of a winch unit; and wherein lifting the rotor blade comprises lifting the rotor blade by the winch unit and the crane.

Assignees

Inventors

Classifications

  • Wind turbines with rotation axis in wind direction · CPC title

  • with supporting couples provided by wind turbines · CPC title

  • Crane hooks · CPC title

  • Arrangements for fixing wind-engaging parts to a hub · CPC title

  • B66C13/06Primary

    for minimising or preventing longitudinal or transverse swinging of loads · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US10823149B2 cover?
A method of erecting a wind power installation which has an aerodynamic rotor having rotor blade connections. A lifting beam having a ballast unit is fixed to a crane hook of a crane. A rotor blade is fixed to a second crane hook at an underside of the ballast unit by means of lifting cables. The lifting beam and the rotor blade are lifted by the crane for mounting the rotor blade at one of the…
Who is the assignee on this patent?
Wobben Properties Gmbh
What technology area does this patent fall under?
Primary CPC classification B66C13/06. Mapped technology areas include Operations & Transport.
When was this patent published?
Publication date Tue Nov 03 2020 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 1 related publication on this page (citations in our corpus or others sharing the same primary CPC).