Method and system for servicing wind turbine rotor
US-2015300175-A1 · Oct 22, 2015 · US
US10823149B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-10823149-B2 |
| Application number | US-201716309028-A |
| Country | US |
| Kind code | B2 |
| Filing date | Jun 19, 2017 |
| Priority date | Jun 23, 2016 |
| Publication date | Nov 3, 2020 |
| Grant date | Nov 3, 2020 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
A method of erecting a wind power installation which has an aerodynamic rotor having rotor blade connections. A lifting beam having a ballast unit is fixed to a crane hook of a crane. A rotor blade is fixed to a second crane hook at an underside of the ballast unit by means of lifting cables. The lifting beam and the rotor blade are lifted by the crane for mounting the rotor blade at one of the rotor blade connections.
Opening claim text (preview).
The invention claimed is: 1. A method of erecting a wind power installation having an aerodynamic rotor blade having a plurality of rotor blade connections, the method comprising: selecting at least one ballast weight so that a predetermined ratio in meters squared per ton between a surface area of the rotor blade and a sum of both the at least one ballast weight and a weight of the rotor blade is equal to or less than 1; fixing the at least one ballast weight to a lifting beam; fixing the lifting beam with the at least one ballast weight to a crane hook of a crane; fixing a rotor blade by lifting cables to a second crane hook at an underside of the at least one ballast weight; and lifting the lifting beam with the at least one ballast weight and the rotor blade by the crane for mounting the rotor blade at one of the plurality of rotor blade connections. 2. The method according to claim 1 , comprising: prior to lifting the beam with the at least one ballast weight and the rotor blade by the crane, fixing a rotor blade root of the rotor blade to a hook of a winch unit; and wherein lifting the rotor blade comprises lifting the rotor blade by the winch unit and the crane.
Wind turbines with rotation axis in wind direction · CPC title
with supporting couples provided by wind turbines · CPC title
Crane hooks · CPC title
Arrangements for fixing wind-engaging parts to a hub · CPC title
for minimising or preventing longitudinal or transverse swinging of loads · CPC title