Component mounting apparatus and component mounting method
US-2016081242-A1 · Mar 17, 2016 · US
US10798859B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-10798859-B2 |
| Application number | US-201715785516-A |
| Country | US |
| Kind code | B2 |
| Filing date | Oct 17, 2017 |
| Priority date | Oct 27, 2016 |
| Publication date | Oct 6, 2020 |
| Grant date | Oct 6, 2020 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
A component mounting method includes independent mounting and cross lane alternate mounting. The independent mounting performs an operation of mounting a component on a first board carried in a first board transport lane from a first component supplier, and an operation of mounting a component on a second board carried in a second board transport lane from a second component supplier. The cross lane alternate mounting alternately performs an operation of mounting the component on the first board carried in the first board transport lane from the second component supplier, and an operation of mounting the component on the second board carried in the second board transport lane from the first component supplier.
Opening claim text (preview).
What is claimed is: 1. A component mounting method in a component mounting apparatus including a first board transport lane, a first mounting head, a second board transport lane which is disposed along the first board transport lane, a second mounting head, a first component supplier which is disposed closer to the first board transport lane than to the second board transport lane, and a second component supplier which is disposed closer to the second board transport lane than to the first board transport lane, the method comprising: independent mounting of independently performing an operation of sucking a component from the first component supplier by the first mounting head, and mounting the component on a first board carried in the first board transport lane, and an operation of sucking a component from the second component supplier by the second mounting head, and mounting the component on a second board carried in the second board transport lane; and cross lane alternate mounting of alternately performing an operation of sucking a component from the second component supplier by the second mounting head, and mounting the component on the first board carried in the first board transport lane, and an operation of sucking a component from the first component supplier by the first mounting head, and mounting the component on the second board carried in the second board transport lane. 2. The component mounting method of claim 1 , wherein in a case where the independent mounting is capable of being executed, the independent mounting is executed, and wherein in a case where the independent mounting is not capable of being executed and the cross lane alternate mounting is capable of being executed, the cross lane alternate mounting is executed. 3. The component mounting method of claim 2 , wherein for each mounting turn in which the first mounting head and the second mounting head mount the components on the first board and the second board, determining which of the independent mounting and the cross lane alternate mounting is executed. 4. The component mounting method of claim 2 , further comprising: normally alternate mounting that alternately performs, for any one of the first board and the second board, an operation of sucking and mounting a component from the first component supplier by the first mounting head, and an operation of sucking and mounting a component from the second component supplier by the second mounting head. 5. The component mounting method of claim 1 , wherein for each mounting turn in which the first mounting head and the second mounting head mount the components on the first board and the second board, determining which of the independent mounting and the cross lane alternate mounting is executed. 6. The component mounting method of claim 1 , further comprising: normally alternate mounting that alternately performs, for at least any one of the first board and the second board, an operation of sucking and mounting a component from the first component supplier by the first mounting head, and an operation of sucking and mounting a component from the second component supplier by the second mounting head.
Tools for holding the circuit boards during processing; handling transport of printed circuit boards · CPC title
having multiple mounting heads · CPC title
Determination of transport trajectories inside mounting machines · CPC title
having a plurality of work-stations · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.